ML082100301
| ML082100301 | |
| Person / Time | |
|---|---|
| Site: | Boiling Water Reactor Owners Group |
| Issue date: | 07/30/2008 |
| From: | Michelle Honcharik NRC/NRR/ADRO/DPR/PSPB |
| To: | Rosenberg S NRC/NRR/ADRO/DPR/PSPB |
| Honcharik M, NRR/DPR/PSPBPM, 415-1774 | |
| References | |
| Download: ML082100301 (5) | |
Text
July 30, 2008 MEMORANDUM TO: Stacey L. Rosenberg, Chief Special Projects Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation FROM:
Michelle C. Honcharik, Senior Project Manager /RA by VPerin for/
Special Projects Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation
SUBJECT:
FORTHCOMING MEETING WITH BOILING WATER REACTOR (BWR)
OWNERS GROUP (BWROG)
DATE & TIME:
Thursday, August 21, 2008 9:00 a.m. - 11:00 a.m.
3:00 p.m. - 4:00 p.m.
LOCATION:
U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike, Room 3B2 Rockville, Maryland PURPOSE:
Meeting to discuss ongoing review of the Licensing Topical Report NEDO-33349, Revision 1, BWR Application to Regulatory Guide 1.97 Revision 4 (See Agencywide Documents Access and Management System (ADAMS) Accession No. ML072470741). The morning session is a technical discussion of the BWROGs draft response to the NRC staff RAI (ADAMS Accession No. ML081650030). The afternoon session is a discussion with management to reach agreement on the process of how the BWROG plans to submit the RAI response CATEGORY 2:
This is a Category 2 Meeting. The public is invited to participate in this meeting by discussing regulatory issues with the NRC at designated points identified on the agenda.
Commission's Policy Statement on AEnhancing Public Participation in NRC Meetings,"
(67 FR 36920), May 28, 2002
PARTICIPANTS:
Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR) and the Office of Nuclear Security and Incident Response (NSIR).
NRC BWROG T. Huang, NRR D. Coleman B. Marcus, NRR K. Mccall S. LaVie, NSIR A. Klemptner G. Cranston, NRR B. Freeman R. Elliott, NRR J. Kenny K. Williams, NSIR M. Iannantuono, et al.
W. Kemper, NRR A. Lewin, NRR P. Hiland, NRR S. Rosenberg, NRR M. Honcharik, NRR Project No. 691
Enclosure:
Agenda cc w/encl: See next page MEETING CONTACT: Michelle Honcharik, NRR 301-415-1774 mch3@nrc.gov
PARTICIPANTS:
Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR) and the Office of Nuclear Security and Incident Response (NSIR).
NRC BWROG T. Huang, NRR D. Coleman B. Marcus, NRR K. Mccall S. LaVie, NSIR A. Klemptner G. Cranston, NRR B. Freeman R. Elliott, NRR J. Kenny K. Williams, NSIR M. Iannantuono, et al.
W. Kemper, NRR A. Lewin, NRR P. Hiland, NRR S. Rosenberg, NRR M. Honcharik, NRR Project No. 691
Enclosure:
Agenda cc w/encl: See next page MEETING CONTACT: Michelle Honcharik, NRR 301-415-1774 mch3@nrc.gov DISTRIBUTION:
PUBLIC PSPB Reading File RidsNrrAdro RidsNrrDpr RidsNrrDprPspb RidsNrrPMMHoncharik RidsNrrLADBaxley RidsOpaMail Tai Huang Barry Marcus Steve LaVie (NSIR)
Gregory Cranston Robert Elliott Kevin Williams (NSIR)
William Kemper Aron Lewin Patrick Hiland Kathryn Brock (NSIR)
PMNS RidsOgcMailCenter RidsAcrsAcnwMailCenter Receptionist (OWFN and TWFN)
ADAMS ACCESSION NO.: ML082100301 NRR-106 OFFICE PSPB/PM PSPB/LA PSPB/BC NAME MHoncharik DBaxley SRosenberg DATE 7/29/08 7/28/08 7/30/08 OFFICIAL RECORD COPY
ENCLOSURE AGENDA NEDO-33349, REVISION 1 BWR [BOILING WATER REACTOR] APPLICATION TO REGULATORY GUIDE 1.94, REVISION 4 THURSDAY, AUGUST 21, 2008 Introductions and NRC Opening Remarks BWROG Introductory Remarks Background of Topical Report Methodology Discussion of NRC Staff Request for Additional Information (RAI)
Presentation/Discussion of BWROG Draft RAI Response Opportunity for Public Comment Break from 11a.m. to 3p.m.
Discussion of Process for BWROG Response to the NRC Staff RAI Opportunity for Public Comment Meeting Summary/Closing Remarks Adjourn
BWR Owners= Group Project No. 691 Mr. Doug Coleman Vice Chair, BWR Owners= Group Energy Northwest Columbia Generating Station Mail Drop PE20 P.O. Box 968 Richland, WA 99352-0968 DWCOLEMAN@energy-northwest.com Mr. Richard Libra Executive Vice Chair, BWR Owners= Group Exelon Generation Co, LLC 200 Exelon Way Mail Code KSA 2-N Kennett Square, PA 19348 Rick.libra@exeloncorp.com Mr. Richard Anderson BWROG, Executive Chair FPL Energy (DAEC)
Duane Arnold Energy Center 3277 DAEC Road Palo, IA 52324 richard_l_anderson@fpl.com Mr. James F. Klapproth GE-Hitachi Nuclear Energy M/C A50 3901 Castle Hayne Road Wilmington, NC 28401 james.klapproth@ge.com Mr. Joseph E. Conen Regulatory Response Group Chair BWR Owners= Group DTE Energy-Fermi 2 200 TAC 6400 N. Dixie Highway Newport, MI 48166 conenj@dteenergy.com Dennis Madison, Hatch Vice President Southern Nuclear Operating Co.
11028 Hatch Parkway North Baxley, GA 31515-2010 drmadiso@southernco.com Frederick Emerson BWROG, Project Manager Frederick.emerson@ge.com Mr. J. A. Gray, Jr.
Regulatory Response Group Vice-Chair BWR Owners= Group Entergy Nuclear Northeast 440 Hamilton Avenue Mail Stop 12C White Plains, NY 10601-5029 JGray4@entergy.com Mr. Ken A. McCall, Program Manager GE Energy M/C F12 3901 Castle Hayne Road Wilmington, NC 28401 kenneth.mccall@ge.com Mr. Tim E. Abney GE Energy M/C A-16 3901 Castle Hayne Road Wilmington, NC 28401 tim.abney@ge.com Oscar Limpias Entergy Nuclear Northeast 1340 Echelon Parkway.
Jackson, MS 39213-8202 olimpia@entergy.com Joe Donahue Progress Energy Inc.
410 S. Wilmington St.
PEB 6A Raleigh, NC 27601-1849 joe.w.donahue@pgnmail.com Paul J. Davison Hope Creek Generating Station P.O. Box 236 Hancocks Bridge, NJ 08038 paul.davison@pseg.com 3/18/08