Semantic search

Jump to navigation Jump to search
 Issue dateTitle
IR 05000390/202101113 April 2021Triennial Fire Protection Inspection Report 05000390/2021011 and 05000391/2021011
ML20226A44421 October 2020Issuance of Amendment No. 42 Regarding Measurement Uncertainty Recapture Power Uprate
ML18347B33022 May 2019Issuance of Amendment Regarding Revision to Watts Bar Unit 2 Technical Specification 4.2.1 Fuel Assemblies, and Watts Bar Units 1 and 2 Technical Specifications Related to Fuel Storage
ML19039A0498 February 2019Amd 1 to USAR Chapter 9 Auxiliary System NRC Additional Redactions
ML18313A2207 November 2018Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection
CNL-17-144, Application to Revise Watts Bar Unit 2 Technical Specification 4.2.1, Fuel Assemblies, and Watts Bar Units 1 and 2 Technical Specifications Related to Fuel Storage (WBN-TS-17-028)20 December 2017Application to Revise Watts Bar Unit 2 Technical Specification 4.2.1, Fuel Assemblies, and Watts Bar Units 1 and 2 Technical Specifications Related to Fuel Storage (WBN-TS-17-028)
ML20311A3146 November 20172017 Q1-Q4 ROP Inspection Findings
ML17306A9892 November 2017Submittal of 10 CFR 50.59 Summary of the Changes, Tests, and Experiments Implemented Report
CNL-17-098, Revised Response to NRC Request for Additional Information Related to TVA Fleet License Amendment Request to Adopt NEI 99-01 Revision 6 Emergency Action Levels27 July 2017Revised Response to NRC Request for Additional Information Related to TVA Fleet License Amendment Request to Adopt NEI 99-01 Revision 6 Emergency Action Levels
CNL-17-085, Response to NRC Request for Additional Information Related to TVA Fleet License Amendment Request to Adopt NEI 99-01 Revision 6 Emergency Action Levels7 July 2017Response to NRC Request for Additional Information Related to TVA Fleet License Amendment Request to Adopt NEI 99-01 Revision 6 Emergency Action Levels
ML17006A27113 January 2017Issuance of Amendments Regarding Extension of Completion Time for Inoperable Diesel Generator
IR 05000390/201600212 August 2016NRC Integrated Inspection Report 05000390/2016002, 05000391/2016002
ML16159A05729 July 2016Issuance of Amendment Regarding Revised Technical Specification 4.2.1 Fuel Assemblies to Increase the Maximum Number of Tritium Producing Burnable Absorber Rods
CNL-16-108, Supplement to License Amendment Request and Request for Deviation from 10 CFR 50 Appendix R in Support of Closure of Generic Safety Issue 191 (WBN-TS-16-01)22 July 2016Supplement to License Amendment Request and Request for Deviation from 10 CFR 50 Appendix R in Support of Closure of Generic Safety Issue 191 (WBN-TS-16-01)
CNL-15-252, License Amendment Request and Request for Deviation from 10 CFR 50, Appendix R in Support of Closure of Generic Safety Issue 191 (WBN-TS-16-01)23 February 2016License Amendment Request and Request for Deviation from 10 CFR 50, Appendix R in Support of Closure of Generic Safety Issue 191 (WBN-TS-16-01)
IR 05000391/201561010 February 2016Construction - NRC Integrated Inspection Report 05000391/2015610, October 16, 2015 December 31, 2015
IR 05000390/201561010 February 2016Watts Bar Nuclear Plant Unit 2 Construction - NRC Integrated Inspection Report 05000391/2015610, October 16, 2015 December 31, 2015
ML15344A31823 December 2015Issuance of Amendment Regarding Fire Protection License Conditions
ML15282A05131 October 2015NUREG-0847, Supp. 29, Safety Evaluation Report Related to the Operation of Watts Bar Nuclear Plant, Unit 2, Docket No. 50-391, Tennessee Valley Authority.
IR 05000390/201561512 October 2015IR 05000390/2015010, 04/27/2015 - 05/01/2015, 08/24-28/2015, Watts Bar Nuclear Plant, Unit 1, Inspection Procedure (IP) 71111.05T, Fire Protection (Triennial)
IR 05000390/201501012 October 2015IR 05000390/2015010, 04/27/2015 - 05/01/2015, 08/24-28/2015, Watts Bar Nuclear Plant, Unit 1, Inspection Procedure (IP) 71111.05T, Fire Protection (Triennial)
CNL-15-214, Updated Pages for As-Constructed Fire Protection Report7 October 2015Updated Pages for As-Constructed Fire Protection Report
ML15257A3257 October 2015Acceptance of Requested Licensing Action Amendment to Add Technical Specifications to Support Dual-Unit Operations
IR 05000391/201560729 September 2015IR 05000391/2015607 and Notice of Violation, July 1, 2015 August 15, 2015, Watts Bar Nuclear Plant, Unit 2 - Integrated Inspection
NL-15-183, Watts Bar Nuclear Plant, Unit 2, Amendment 114 to Final Safety Analysis Report, Section 9.0 - Auxiliary Systems, Pages 9-i - 9.3-15811 September 2015Watts Bar Nuclear Plant, Unit 2, Amendment 114 to Final Safety Analysis Report, Section 9.0 - Auxiliary Systems, Pages 9-i - 9.3-158
ML15279A27711 September 2015Amendment 114 to Final Safety Analysis Report, Section 9.0 - Auxiliary Systems, Pages 9-i - 9.3-158
ML15229A19531 August 2015NUREG-0847, Supplement 28 Safety Evaluation Report Related to the Operation of Watts Bar Nuclear Plant, Unit 2 Docket Number 50-391 Tennessee Valley Authority
CNL-15-170, Responses to NRC Audit Review Questions for Essential Raw Cooling Water and Component Cooling Water System License Amendment Request28 August 2015Responses to NRC Audit Review Questions for Essential Raw Cooling Water and Component Cooling Water System License Amendment Request
CNL-15-174, Submittal of Updated Pages for Unit 1/Unit 2 As-Constructed Fire Protection Report & License Condition 2.C(9) Addition Request27 August 2015Submittal of Updated Pages for Unit 1/Unit 2 As-Constructed Fire Protection Report & License Condition 2.C(9) Addition Request
ML15244B37726 August 20158/26/2015, Meeting Handout Regarding TVA Dual Unit Fire Protection Report
IR 05000391/201560514 August 2015IR 05000391/2015605, May 17, 2015 June 30, 2015, Watts Bar Nuclear Plant, Unit 2, Integrated Report
IR 05000390/201560514 August 2015IR 05000391/2015605, May 17, 2015 June 30, 2015, Watts Bar Nuclear Plant, Unit 2, Integrated Report
ML15173A09726 June 2015Acceptance Review Results for Requested License Amendment to Increase Tpbar Production
CNL-15-092, Response to NRC Request to Supplement the Application to Revise Technical Specification 4.2.1, Fuel Assemblies (WBN-TS-15-03)27 May 2015Response to NRC Request to Supplement the Application to Revise Technical Specification 4.2.1, Fuel Assemblies (WBN-TS-15-03)
IR 05000390/201500130 April 2015Watts Bar - NRC Integrated IR 05000390/20150001 and 07201048/2015001
ML15121A04330 April 2015NRC Integrated IR 05000390/20150001 and 07201048/2015001
IR 05000390/201500030 April 2015Watts Bar - NRC Integrated IR 05000390/20150001 and 07201048/2015001
ML15126A21716 April 2015NRR E-mail Capture - Audit Plan Watts Bar Unit 2 Fire Protection Review
IR 05000391/20146122 February 2015IR 05000391/2014612, on 12/19/2014, Watts Bar Nuclear Plant, Unit 2, Construction Fire Protection Program Inspection
IR 05000390/20146122 February 2015IR 05000391/2014612, on 12/19/2014, Watts Bar Nuclear Plant, Unit 2, Construction Fire Protection Program Inspection
ML15033A04131 January 2015NUREG-0847 Supplement 27, Safety Evaluation Report Related to the Operation of Watts Bar Nuclear Plant, Unit 2.
CNL-14-235, Transmittal of Part V of the Unit 1/Unit 2 Fire Protection Report9 January 2015Transmittal of Part V of the Unit 1/Unit 2 Fire Protection Report
ML14318A3423 December 2014November 12, 2014, Summary of Meeting with Tennessee Valley Authority Regarding the Watts Bar Nuclear Plant, Unit 2 Operating License Application (Fire Protection)
IR 05000390/201400429 October 2014IR 05000390/2014004; on 07/01/2014 - 09/30/2014; Watts Bar, Unit 1; Post Maintenance Testing and Fire Protection
CNL-14-201, Response to Questions Regarding the Unit 1/Unit 2 As-Constructed Fire Protection Report27 October 2014Response to Questions Regarding the Unit 1/Unit 2 As-Constructed Fire Protection Report
ML14223A45328 August 2014Summary of Meeting with Tennessee Valley Authority Regarding the Watts Bar Nuclear Plant, Unit 2 Operating License Application
ML14209A86327 August 2014July 16, 2014 Summary of Meeting with Tennessee Valley Authority Regarding the Watts Bar Nuclear Plant, Unit 2 Operating License Application
ML14188C06524 July 2014Summary of Meeting with Tennessee Valley Authority Regarding the Watts Bar Nuclear Plant, Unit 2, Operating License Application
ML13351A4939 January 2014G20130843 - J. Sam Armijo Ltr Re Interim ACRS Review of Watts Bar Nuclear Plant Unit 2 Operating License Application - Response
CNL-13-135, Application to Update Watts Bar Unit 1 License Condition 2.F to Allow Two-Unit Operation (WBN-TS-13-18)20 December 2013Application to Update Watts Bar Unit 1 License Condition 2.F to Allow Two-Unit Operation (WBN-TS-13-18)