ML13351A493

From kanterella
Jump to navigation Jump to search

G20130843 - J. Sam Armijo Ltr Re Interim ACRS Review of Watts Bar Nuclear Plant Unit 2 Operating License Application - Response
ML13351A493
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 01/09/2014
From: Satorius M
NRC/EDO
To: Armijo J
Advisory Committee on Reactor Safeguards
Poole, J NRR/DORL, 415-2048
Shared Package
ML13338A200 List:
References
G20130843, TAC MF3173
Download: ML13351A493 (3)


Text

January 9, 2013 Dr. J. Sam Armijo, Chairman Advisory Committee on Reactor Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

SUBJECT:

RESPONSE TO THE ADVISORY COMMITTEE ON REACTOR SAFEGUARDS LETTER, DATED NOVEMBER 26, 2013, ON THE INTERIM REVIEW OF WATTS BAR NUCLEAR PLANT UNIT 2 OPERATING LICENSE APPLICATION

Dear Dr. Armijo:

On behalf of the U.S. Nuclear Regulatory Commission (NRC), I am responding to your letter dated November 26, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML13318A154). Your letter provided the views of the Advisory Committee on Reactor Safeguards (ACRS) on the status of the ongoing construction, inspection, and licensing review of the Watts Bar Nuclear Plant, Unit 2 (WBN 2) operating license (OL) application. Your letter also included the ACRSs review of the NRC staffs supplemental safety evaluation reports (SSERs) 21-26. The NRC staff has considered the two conclusions provided in your letter and has the following responses:

ACRS Conclusion 1 Our review to date has not identified any issue which we do not expect to be satisfactorily resolved prior to the currently scheduled OL issuance. Specific items for future review are identified in the discussion below.

NRC Response The NRC staff agrees and plans on providing the ACRS with a presentation on the seven items highlighted in the discussion section in a future ACRS meeting. These were Open Items 59, 61, 63, 91, 93, 133, and 134 from Appendix HH of SSER 26. In addition to these open items, the ACRS requested that the NRC staff provide a presentation on how the feasibility of all operator manual actions taken in response to a fire is evaluated according to the guidance in Regulatory Guide 1.189, Revision 2, Fire Protection for Nuclear Plants. The NRC staff plans on working with the ACRS to provide a presentation to address this item.

ACRS Conclusion 2 The integration of WBN 2 as the second unit in a dual-unit plant which has operated as a single-unit for almost 20 years will require specific, detailed planning to ensure against creating challenges to Watts Bar Nuclear Unit 1 (WBN 1) operation.

NRC Response The NRC staff agrees and continues to monitor this through the oversight process.

I appreciate the comments ACRS has provided and look forward to working with the Committee as the staff completes its review in 2014.

Sincerely,

/RA/

Mark A. Satorius Executive Director for Operations cc: Chairman Macfarlane Commissioner Svinicki Commissioner Apostolakis Commissioner Magwood Commissioner Ostendorff SECY

NRC Response The NRC staff agrees and continues to monitor this through our oversight process.

I appreciate the comments ACRS has provided and look forward to working with the Committee as the staff completes its safety review in 2014.

Sincerely,

/RA/

Mark A. Satorius Executive Director for Operations cc: Chairman Macfarlane Commissioner Svinicki Commissioner Apostolakis Commissioner Magwood Commissioner Ostendorff SECY DISTRIBUTION: G20130843 PUBLIC LPL2-2 R/F RidsEdoMailCenter RidsNrrDorlLpl2-2 RidsOgcMailCenter RidsNrrPmWattsBar 2 RidsNrrOd RidsNrrLABClayton RidsNrrMailCenter RidsNrrDorl RidsNrrDra RidsOpaMail RidsACRSAcnwMailCenter RidsRgn2MailCenter ADAMS Accession Number: ML13351A493 Package: ML13338A200

  • via email OFFICE NRR/DORL/LPL2-2 NRR/DORL/LPL2-2 Tech Editor*

NRR/DORL/LPL2-2 NAME JPoole BClayton CHsu JQuichocho DATE 12/18/13 12/18/13 12/19/13 12/18/13 OFFICE NRR/DORL NRR EDO NAME MEvans ELeeds (JUhle for)

MSatorius DATE 12/23/13 1/02/14 1/09/14 OFFICIAL RECORD COPY