MONTHYEARML24022A2592024-01-22022 January 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Unit 1, License Amendment Request to Revise TS LCO 3.8.2 to Remove Note C-S Diesel Generator ML24016A0762024-01-16016 January 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2 - License Amendment Request to Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications ML23347A0642023-12-13013 December 2023 12-13-23 Email from Kimberly Green to Wells, Russell, Subject: Results of NRC SUNSI Review of Watts Bar Nuclear Plant Dual-Unit UFSAR, Amendment 5 ML23334A0932023-11-28028 November 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise TS Surveillance Requirement 3.9.5.1 to Reduce RHR Flow Rate During Mode 6 ML23319A1662023-11-0202 November 2023 NRR E-mail Capture - Acceptance Review Results for Browns Ferry Nuclear Plant, Sequoyah Nuclear Plant, and Watts Bar Nuclear Plant, Exemption Request Related to 10 CFR 37.11(c)(2) ML23254A2872023-09-11011 September 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise TS Table 1.1-1 Re Number of Required Rvh Closure Bolts ML23236A2562023-08-24024 August 2023 NRR E-mail Capture - Acceptance Review Results for the Sequoyah and Watts Bar License Amendment Request to Adopt TSTF-567 (L-2023-LLA-0106) ML23191A8672023-07-10010 July 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML23166A1142023-06-15015 June 2023 Document Request for Watts Bar Nuclear Plant - Radiation Protection Inspection - Inspection Report 2023-03 ML23150A2472023-05-25025 May 2023 NRR E-mail Capture - Audit Plan Related to Review of the Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Increase the Number of Tritium Producing Burnable Absorber Rods ML23116A1492023-04-21021 April 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Increase the Number of Tritium Producing Burnable Absorber Rods ML23075A0032023-03-13013 March 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar, Units 1, 2, and 3, License Amendment Request to Revise TS 3.7.11, Required Actions A.1 and E.1 Footnotes Re Date for the Modification ML23072A0722023-03-10010 March 2023 NRR E-mail Capture - (External_Sender) State Consultation - Sequoyah Nuclear Plant, Units 1 and 2; and Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.4.12 (L-2022-LLA-0103) ML23067A2372023-03-0808 March 2023 WB_2023-02_RP_inspection_doc_request ML23013A0382023-01-12012 January 2023 NRR E-mail Capture - (External_Sender) State Consultation for Alabama - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-529, Revision 4 (L-2022-LLA-0088) ML23013A0362023-01-12012 January 2023 NRR E-mail Capture - (External_Sender) State Consultation for Alabama - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-554-A, Revision 1 (L-2022-LLA-0100) ML22356A2982022-12-22022 December 2022 Email Response to Letter, Dated November 22, 2022 Regarding Watts Bar Integrated Inspection Report ML22353A0812022-12-15015 December 2022 NRR E-mail Capture - Acceptance Review Results for Watts Bar, Unit 2, Alternative Request WBN-2-ISI-01 Regarding Examination of Upper Head Injection Nozzle Dissimilar Metal Piping Butt Welds ML22348A0972022-12-14014 December 2022 NRR E-mail Capture - State Consultation - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-529, Revision 4 (L-2022-LLA-0088) ML22348A0442022-12-13013 December 2022 NRR E-mail Capture - State Consultation - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-554-A, Revision 1 (L-2022-LLA-0100) ML22343A0692022-12-0808 December 2022 NRR E-mail Capture - Request for Additional Information - Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.4.12 (L-2022-LLA-0103) ML22227A0712022-08-15015 August 2022 NRR E-mail Capture - Acceptance Review Results for Sequoyah and Watts Bar License Amendment Request to Revise TS 3.4.12 (EPID L-2022-LLA-0103) - Corrected ML22227A0262022-08-12012 August 2022 NRR E-mail Capture - Acceptance Review Results for Sequoyah and Watts Bar License Amendment Request to Revise TS 3.4.12 ML22227A0272022-08-11011 August 2022 NRR E-mail Capture - Request for Additional Information Related to Alternative Requests RP-11 for Sequoyah Nuclear Plant, Units 1 and 2, and IST-RR-9 for Watts Bar Nuclear Plant, Units 1 and 2 ML22215A2752022-08-0303 August 2022 NRR E-mail Capture - Acceptance Review Results for TVA Fleet License Amendment Request to Adopt TSTF-554 ML22194A8762022-07-13013 July 2022 NRR E-mail Capture - Acceptance Review Results for TVA Fleet License Amendment Request to Adopt TSTF-529 ML22166A4292022-06-0606 June 2022 NRR E-mail Capture - LAR to Adopt TSTF-577 ML22146A3342022-05-25025 May 2022 NRR E-mail Capture - Acceptance Review Results for Browns Ferry Nuclear Plant, Units 1, 2, and 3, Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Relief Requests (EPID L-2022-LLR-0045 - 0047) ML22136A0182022-05-16016 May 2022 NRR E-mail Capture - Acceptance Review Results for Sequoyah Nuclear Plant, Units 1 and 2, Alternative Request RP-11 and Watts Bar Nuclear Plant, Units 1 and 2, Alternative Request IST-RR-9 ML22144A1002022-05-12012 May 2022 NRR E-mail Capture - Request for Additional Information Related to Tva'S Request to Revised the TVA Plants' Radiological Emergency Plans ML22123A1812022-05-0303 May 2022 NRR E-mail Capture - Acceptance Review Results for Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Adopt TSTF-577 ML22115A1402022-04-25025 April 2022 NRR E-mail Capture - Requests for Confirmation of Information and Additional Information Regarding Watts Bar Nuclear Plant, Unit 2 Exemption Request Re 10 CFR Part 26 (L-2022-LLE-0017) ML22083A2372022-03-24024 March 2022 NRR E-mail Capture - Request for Additional Information and Confirmation of Information Related to Tva'S Request for Changes to Watts Bar Nuclear Plant, Units 1 and 2, Technical Specification 3.7.8 ML22081A2222022-03-22022 March 2022 NRR E-mail Capture - Acceptance Review Results for Watts Bar, Unit 1, License Amendment Request to Revise Allowable Value for TS Table 3.3.2-1, Function 6.e(1) ML22056A3802022-02-25025 February 2022 Document Request for Watts Bar Nuclear Plant - Radiation Protection Inspection - Inspection Report 2022-02 ML22131A1902022-02-23023 February 2022 NRR E-mail Capture - Acceptance Review Results for Watts Bar, Unit 2, Request to Revise the Reactor Vessel Surveillance Capsule Withdrawal Schedule ML22046A0392022-02-15015 February 2022 NRR E-mail Capture - Request for Confirmation of Information Regarding the Watts Bar Nuclear Plant, Unit 2, Cycle 4 Mid-Cycle Outage Generic Letter 95-05 Final Report ML22038A1882022-02-0404 February 2022 NRR E-mail Capture - Acceptance Review Results for TVA Fleet License Amendment Request to Revise the TVA Radiological Emergency Plan ML22018A0272022-01-18018 January 2022 2022 All RFI Responses - Exercise and Program Inspections - Revl ML22011A0382022-01-10010 January 2022 NRR E-mail Capture - Acceptance Review Results for Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-205-A, Rev. 3 and TSTF-563-A ML21306A2452021-11-0202 November 2021 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.7.8, Essential Raw Cooling Water (ERCW) System ML21267A1392021-09-23023 September 2021 Document Request for Upcoming RP Inspection at Watts Bar ML21252A0912021-09-0909 September 2021 NRR E-mail Capture - Request for Comments on Proposed Issuance of Amendments to Watts Bar Nuclear Plant, Unit 2 - Revise Steam Generator Secondary Side Water Level ML21223A2592021-08-11011 August 2021 Affidavit - Prop Slides - Partially Closed Meeting with TVA Potential Watts Bar, Unit 2 Tube Locking LAR ML21221A2602021-08-0909 August 2021 NRR E-mail Capture - Request for Additional Information Regarding Tva'S Request to Revise Watts Bar, Unit 1 Tech Specs Related to Continuous Opening of the Auxiliary Building Secondary Containment Enclosure Boundary ML21215A1152021-07-26026 July 2021 NRR E-mail Capture - (External_Sender) Correction to WBN Chiller Replacement LAR ML21215A1142021-07-26026 July 2021 NRR E-mail Capture - (External_Sender) Correction to WBN Chiller Replacement LAR ML21197A0452021-07-15015 July 2021 WBN U1 Isi/Sgisi Request for Information (RFI) Letter ML21193A2422021-07-12012 July 2021 NRR E-mail Capture - Request for Additional Information Regarding Tva'S Request to Revise the Watts Bar Nuclear Plant, Unit 2 Technical Specifications Related to Steam Generator Inspection/Repair Program Provisions ML21189A0202021-06-29029 June 2021 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specifications 3.3.6 and 3.3.7 Re Radiation Monitor Redundant Unit of Measure 2024-01-22
[Table view] |
Text
NRR-PMDAPEm Resource From: Minarik, Anthony Sent: Thursday, April 16, 2015 3:31 PM To: Bryan, Robert H Jr (rhbryan@tva.gov); Polickoski, James Thomas <jtpolickoski@tva.gov>
(jtpolickoski@tva.gov)
Cc: Curran, Gordon; Poole, Justin; Quichocho, Jessie; Klein, Alex; Frumkin, Daniel; Moulton, Charles
Subject:
Audit Plan RE: Watts Bar Unit 2 Fire Protection Review Attachments: Watts Bar 2 Fire Protection Audit Plan.pdf Bob and Jim, Attached is an audit plan for the review of information related to the Watts Bar Fire Protection Report. Consider this a framework for establishing information sharing services and conducting face-to-face and/or on-site interactions to complete the review of the Fire Protection Report. Note, that during the timeframe of the audit all documents reviewed will be listed as references in the ensuing Audit Report and any necessary docketed information will be requested via RAI in order to reach the reasonable assurance finding. Thank you for your time and help.
Anthony Minarik 301-415-6185 Office of Nuclear Reactor Regulation (NRR)
Division of Operating Reactor Licensing (DORL)
Watts Bar Special Projects Branch (LPWB)
Normal Hours:
0600-1545: Mon-Fri 1
Hearing Identifier: NRR_PMDA Email Number: 2043 Mail Envelope Properties (Anthony.Minarik@nrc.gov20150416153000)
Subject:
Audit Plan RE: Watts Bar Unit 2 Fire Protection Review Sent Date: 4/16/2015 3:30:33 PM Received Date: 4/16/2015 3:30:00 PM From: Minarik, Anthony Created By: Anthony.Minarik@nrc.gov Recipients:
"Curran, Gordon" <Gordon.Curran@nrc.gov>
Tracking Status: None "Poole, Justin" <Justin.Poole@nrc.gov>
Tracking Status: None "Quichocho, Jessie" <Jessie.Quichocho@nrc.gov>
Tracking Status: None "Klein, Alex" <Alex.Klein@nrc.gov>
Tracking Status: None "Frumkin, Daniel" <Daniel.Frumkin@nrc.gov>
Tracking Status: None "Moulton, Charles" <Charles.Moulton@nrc.gov>
Tracking Status: None "Bryan, Robert H Jr (rhbryan@tva.gov)" <rhbryan@tva.gov>
Tracking Status: None "Polickoski, James Thomas <jtpolickoski@tva.gov> (jtpolickoski@tva.gov)" <jtpolickoski@tva.gov>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 806 4/16/2015 3:30:00 PM Watts Bar 2 Fire Protection Audit Plan.pdf 112624 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received:
Audit Plan for Watts Bar Fire Protection Report Review Audit for: TVA - WBN-1 & 2, Fire Protection Report Audit Dates: April 20, 2015 to TBD (until NRC SE is issued)
Type of Audit: Fire Protection Report, Information Portal and Possible Site Audit Planned Audit Hours: Open TBD Auditors: D. Frumkin, Sr. Fire Protection Engineer C. Moulton, Fire Protection Engineer
- a. Background TVA is requesting a license for Watts Bar Unit 2. The review for this license includes NRC review of the Watts Bar 2 Fire Protection Program consistent with information contained within Revision 2 of Regulatory Guide 1.189, Fire Protection for Nuclear Power Reactors. To support licensing the NRC expects to review the as-built Fire Protection Report and develop a safety evaluation based on that review. With the proximity of the expected submittal of the as-built Fire Protection Report and the planned request for license, the Fire Protection Branch (AFPB) plans to use a regulatory audit to aid in the final review of the as-built Fire Protection Program. NRC staff audit of the draft information is intended to reduce the NRC staff review time for the as-built Fire Protection Report that TVA plans to submit to the NRC for review and approval in May 2015.
- b. Regulatory Basis The regulatory basis is to support NRC staff review of Unit 2 of Watts Bar in accordance with NUREG-0800, Standard Review Plan, Section 9.5.1.1, and Revision 2 of Regulatory Guide 1.189, Fire Protection for Nuclear Power Plants.
- c. Regulatory Audit Scope Review the revised documentation from the Watts Bar 1 and 2 Fire Protection Report to support the license application for Watts Bar 2, and future expected license amendment for Watts Bar 1. The purpose of the Unit 1 Watts Bar license amendment will be to align both unit programs to a common approved fire protection program. NRC staff audit of the Fire Protection Report that is under development will allow for vetting of topics during public meetings and ensuring that the as-built Fire Protection Report is sufficiently complete for NRC staff review.
- d. Information and Other Material Necessary for the Regulatory Audit
- Sections of the Fire Protection Report that have been developed by TVA and are considered complete pending final TVA administrative approvals,
- Redline/Strikeout version comparison to last submitted version,
- Drawings and calculations related to or that support the Fire Protection Report,
- Design changes under development to support the Fire Protection Report, including but not limited to design changes to resolve inspection and licensee identified items, and
- Operator manual action timing results to support the operator manual actions described in the Fire Protection Report.
- e. Team Assignments Mr. C. Moulton and Mr. D. Frumkin will be reviewing information to support the as-built Fire Protection Report.
- f. Logistics The intent of this audit is to be primarily an audit of information on a read only information portal. Public meetings will be used for technical discussions.
- g. Special Requests TBD
- h. Deliverables TVA will make an online, password protected, read only, information portal available to NRC staff. On site dates for a tour will depend on the need for the tour and the schedule of the development of the Watts Bar Fire Protection Report.
- i. References
- LIC-111 - Regulatory Audits
- Regulatory Guide 1.189, Revision 2
- NUREG-0800, Standard Review Plan 9.5.1.1
- TVA Multiple Spurious Operations Evaluation - R1976-20-01, August 2014
- TVA As-Designed Fire Protection Report - March 13, 2013 - ML130840169 Audit Overview: NRC staff will have access to a read only information portal to review TVA documents that are complete to support Watts Bar 2 licensing review.
Audit/Observer: None Entrance Meeting: Via teleconference upon the availability of the portal.
Exit Meeting: Via teleconference upon the submittal of the as-built Fire Protection Report.
Licensee Contacts: Licensing: Gordon Arent Technical: James Polickoski List of Documents Requested: TBD Branch Chief Instructions: TBD Approving Branch Chief: ______/RA/____________ Date: _4/16/2015_
Alexander R. Klein 2lPage Watts Bar Fire Protection Audit Plan
COPIES PROVIDED Branch Chiefs: Alexander Klein, Jessie Quichocho Project Managers: Andy Hon, Anthony Minarik, Justin Poole, Jeanne Dion Original to Branch Files: NRR/DRA/AFPB Auditors: D. Frumkin, C. Moulton 3lPage Watts Bar Fire Protection Audit Plan