Semantic search

Jump to navigation Jump to search
 Issue dateTitle
ML23212B23631 July 2023Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System - WEC Documents
ML22278A24919 September 2022Rev. 21 to Updated Final Safety Analysis Report, Chapter 3, Section 3.4, Water Level (Flood) Design
ML22278A28319 September 2022Rev. 21 to Updated Final Safety Analysis Report, Chapter 15, Section 15, Accident Analyses
ML22046A07414 February 2022Review of Limerick Generating Station Defense in Depth and Diversity Common Cause Failure Coping Analysis, WNA-AR-01074-GLIM-P, Rev 1. Without Attachment 3 Enclosure
ML21133A05829 April 20210 to Updated Final Safety Analysis Report, Chapter 3, Sections 3.4, Water Level (Flood) Design
ML21133A13429 April 20210 to Updated Final Safety Analysis Report, Chapter 15, Sections 15.0 Through 15.5
RS-21-039, Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments25 March 2021Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments
ML18278A28010 October 2018Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 10/23/2018
ML19037A16319 September 2018LIM Chapter 15 Redacted
ML17216A77619 September 2016Redacted Limerick Generating Station, Units 1 & 2, Revision 18 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses
IR 05000352/20150033 November 2015IR 05000352/2015003 and 05000353/2015003, Integrated Inspection Report, and IR 07200065/2015001, Independent Spent Fuel Storage Installation Report - Limerick Generating Station
ML15138A07714 May 2015NRC Reply to ACE Email - Questions About April 5, 2015 Fire at Limerick (EDATS R1-2015-0130)
ML15098A0117 April 2015Email from ACE Re Questions About April 5, 2015 Fire at Limerick Nuclear Plant (EDATS 2015-0130)
ML14309A8185 November 2014CFR50.59 and 10CFR72.48 Evaluation for the Period July 1, 2012 Through June 30, 2014
ML12310A4075 November 201224-Month 10CFR50.59 and 10CFR72.48 Evaluation Summary Report for the Period July 1, 2010 Through June 30, 2012
ML1106703078 March 2011Special Report - Seismic Monitoring Instrumentation Inoperability, Rev. 2
ML11025014425 January 2011Special Report - Seismic Monitoring Instrumentation Inoperability, Rev. 1
ML10113045123 April 2010LER, Limerick, Units 1 and 2, Special Report - Seismic Monitoring Instrumentation Inoperability
ML20195G47630 April 1999Revised Monthly Operating Repts for Apr 1999 for Lgs,Units 1 & 2
ML20205N93131 March 1999Monthly Operating Repts for Mar 1999 for Limerick Generating Station,Units 1 & 2.With
ML20207J74628 February 1999Monthly Operating Repts for Feb 1999 for Limerick,Units 1 & 2.With
IR 05000352/199800318 June 1998Insp Repts 50-352/98-03 & 50-353/98-03 on 980317-0518. Violations Noted.Major Areas Inspected:Aspects of PECO Energy Operations,Engineering,Maint & Plant Support
ML20133G57731 December 1996Monthly Operating Repts for Dec 1996 for Limerick Generating Station Units 1 & 2
ML20149M28030 November 1996Monthly Operating Repts for Nov 1996 for Limerick Generating Station Unit 1 & 2
Information Notice 1996-45, Potential Common-Mode Post-Accident Failure of Containment Coolers12 August 1996Potential Common-Mode Post-Accident Failure of Containment Coolers
IR 05000352/199302922 December 1993Insp Repts 50-352/93-29 & 50-353/93-29 on 931102-1213.No Violations Noted.Major Areas Inspected:Plant Operations, Maint,Engineering,Plant Support & Review of Licensee Event & Routine Repts
IR 05000352/199202927 January 1993Insp Repts 50-352/92-29 & 50-353/92-29 on 921115-930102. Noncited Violations Noted.Major Areas inspected:921204 Reactor Trip & Maint Efforts to Return Unit to Svc
ML20072T92031 March 1991Monthly Operating Repts for Mar 1991 for Limerick Station Units 1 & 2
ML20070T35626 March 19911991 Annual Emergency Preparedness Exercise Scenario Manual for Limerick Generating Station
ML19332C71131 October 1989Monthly Operating Repts for Oct 1989 for Limerick Generating Station Units 1 & 2.W/891114 Ltr
IR 05000352/198901326 September 1989Exam Repts 50-352/89-13OL & 50-353/89-22OL on 890612-16 & 19.Exam Results:All Senior Reactor Operator Candidates Passed Written Exams & Operating Tests.All Reactor Operators Passed Written Exams.All But One Passed Operating Test
ML20247A55031 August 1989Safety Evaluation Report Related to the Operation of Limerick Generating Station,Units 1 and 2.Docket Nos. 50-352 and 50-353.(Philadelphia Electric Company)
ML20246G20725 August 1989License NPF-85,authorizing Operation of Limerick Generating Station at Reactor Power Levels of 3,293 Mwt (100% Rated Power)
ML20245A35814 June 1989Safety Evaluation Re Increased Core Flow Analysis Partial Feedwater Heating Analysis & Extended Load Line Limit Analysis
NRC Generic Letter 1987-1612 November 1987NRC Generic Letter 1987-016: Transmittal of NUREG-1262, Answers to Questions at Public Meetings Regarding Implementation of Title 10, Code of Federal Regulations, Part 55 on Operators' Licenses
ML20207G1632 January 1987Provides Addl Info to Support Util 861117 Application for Amend to License NPF-39 Re Operation W/Partial Feedwater Heating & Increased Core Flow.Info Re Peak Clad Temp Changes Submitted,Per Martin & Mccoy 861218 Request
ML20214A13513 November 1986Summary of 861001 Meeting W/Util in Bethesda,Md Re Schedules for Licensing Actions.Adequate Preparation of License Amend Applications Emphasized