Category:E-Mail
MONTHYEARML24250A1062024-09-0606 September 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - Proposed Alternative to Utilize Code Case OMN-32 (L-2024-LLR-0030) ML24234A2772024-08-21021 August 2024 NRR E-mail Capture - Final RAI - Constellation Energy, LLC - Fleet Request - Proposed Alternative Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds (L-2024-LLR-0031) ML24199A1842024-07-15015 July 2024 RAI-LAR for Limerick EPID: L-2024-LLA-0079- Use This Version ML24197A0162024-07-12012 July 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - License Amendment Request to Adopt TSTF-591 ML24176A1292024-06-20020 June 2024 Estimated Completion Schedule Change Email ML24156A0082024-05-31031 May 2024 NRR E-mail Capture - Constellation Energy, LLC - Fleet Request - Acceptance of Proposed Alternative Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds (L-2024-LLR-0031 ML24131A0612024-05-10010 May 2024 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Proposed Alternative to Utilize Code Case OMN-32 (L-2024-LLR-0030) ML24107A9192024-05-0808 May 2024 Email to Christian Williams Re Decision on the Limerick Exemption ML24107A9202024-05-0303 May 2024 Email to Christian Williams Re Availability of Environmental Assessment for the Limerick Exemption ML24122C6742024-05-0101 May 2024 Response to a Request from NRC Review of a Draft EA for an Exemption for the Limerick Generating Station ML24122B5072024-05-0101 May 2024 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-591, Revision 0 ML24122C6702024-04-29029 April 2024 Request from NRC Review of a Draft EA for an Exemption for the Limerick Generating Station ML24051A0652024-02-16016 February 2024 Digital I&C LAR RAIs Re HFE (Email) ML24026A2922024-01-26026 January 2024 – Request for Additional Information Regarding Limerick Digital Instrumentation and Controls License Amendment Request ML23331A0062023-11-22022 November 2023 (External Sender) Supplement - Limerick Security Rule Exemption Request – ISFSI Docket No. Reference ML23311A2412023-11-0707 November 2023 NRR E-mail Capture - NRC Notification to the Commonwealth of Pennsylvania Re. Limerick Generating Station, Units 1 and 2 Amendment - Control Room Ventilation System Technical Specifications ML23304A0192023-10-30030 October 2023 NRR E-mail Capture - Final RCI - Constellation Energy Generation, LLC - Limerick 1 & 2 - Exemption from Security Rule (L-2023-LLE-0026) ML23276B4642023-10-0303 October 2023 NRR E-mail Capture - NRC Request for Additional Information Limerick TSTF-477 LAR ML23255A2872023-09-12012 September 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Alternative to Use the Successive Inspection Requirements of BWRVIP-75-A ML23248A1282023-09-0101 September 2023 NRR E-mail Capture - Action: Opportunity to Review and Comment on a New NRC Information Collection, 10 CFR Part 50.55a, Codes and Standards (3150-XXXX) ML23237B3972023-08-24024 August 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Alternative Request to Use Updated BWRVIP Guidelines ML23208A1942023-07-27027 July 2023 NRR E-mail Capture - Limerick Generating Station - Audit Plan for TSTF-477 LAR Review (L-2022-LLA-0174) ML23202A0682023-07-21021 July 2023 NRR E-mail Capture - NRC Request for Additional Information Re. TSTF-477 LAR ML23201A1262023-07-18018 July 2023 Additional RAIs for Limerick Generation Station, Units 1 and 2 - LAR and Exemption Request for Digital I&C Installation Support ML23173A0632023-06-20020 June 2023 RAIs for Limerick Generation Station, Units 1 and 2 - LAR and Exemption Request for Digital I&C Installation Support ML23102A1642023-04-12012 April 2023 Generation Station, Unit No. 2 – Potential Emergent Relief Request for HPCI IST (EPID L-2023-LLR-0015) - Closure E-mail Dated 4/12/2023 ML23125A0522023-03-31031 March 2023 NRR E-mail Capture - Clean OL Pages for 50.69 LAR ML23089A1602023-03-30030 March 2023 NRR E-mail Capture - NRC Notification to the Commonwealth of Pennsylvania Re. Limerick Generating Station, Units 1 and 2 Amendment - Alternative 10 CFR 50.69 Categorization Approaches ML23086B9282023-03-27027 March 2023 Acceptance of Requested Licensing Action for License Amendment Request to Support Digital Modernization Project Installation ML23086A0822023-03-27027 March 2023 – Acceptance of Requested Licensing Action for Exemption Request to Support Digital Modernization Project Installation ML22354A2622022-12-20020 December 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Request to Use Certain Provisions of the 2019 Edition of the ASME BPV Code, Section XI ML23060A1662022-12-20020 December 2022 Acceptance Review: Adopt TSTF-477, Revision 3-Acceptance Letter ML22200A0782022-07-19019 July 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request to Use Honeywell Mururoa V4F1 R Supplied Air Suits ML22172A0752022-06-17017 June 2022 Response: Review and Feedback on Draft Limerick Digital License Amendment Request (L-2020-LRM-0041) ML22136A0032022-05-13013 May 2022 NRR E-mail Capture - NRC Request for Additional Information - Limerick License Amendment Request (L-2021-LLA-0042) ML22124A2862022-05-0404 May 2022 Information Needed to Provide Substantive Feedback on Human Factors Engineering Supporting the Planned Limerick Digital I&C License Amendment Request ML22089A1172022-03-30030 March 2022 Additional Comments and Questions on Constellations March 31st Presentation ML22089A1162022-03-28028 March 2022 Comments and Questions on Constellations March 31st Presentation ML22112A2152022-03-28028 March 2022 Limerick_Acceptance Review TS Change to Correct Nonconservative Technical Specification Table 3.3.3-1 ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML22034A0142022-02-0202 February 2022 NRR E-mail Capture - Audit Plan Supplement for LIM 50.69 LAR (L-2021-LLA-0042) ML22028A1832022-01-24024 January 2022 NRR E-mail Capture - Audit Plan Supplement for LIM 50.69 LAR (L-2021-LLA-0042) ML22020A0642022-01-13013 January 2022 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles ML22005A1812022-01-0505 January 2022 NRR E-mail Capture - Staffs Questions Pertaining to Limerick Generating Station Digital Modernization Project LAR Pre-submittal Meeting Slides December 7, 2021 ML21301A0672021-10-28028 October 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-541 ML21295A0362021-10-20020 October 2021 NRR E-mail Capture - Supplement to Limerick 50.69 Audit Plan Dated October 1, 2021 (L-2021-LLA-0042) ML21286A0302021-10-13013 October 2021 Staffs Questions Pertaining to Limerick Generating Station Digital Modernization Project LAR Pre-submittal Meeting Slides October 20, 2021 ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21252A0482021-09-0707 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet Alternative Request for Repair of Water Level Instrumentation Partial Penetration Nozzles ML21215A3502021-08-0303 August 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-554 2024-09-06
[Table view] |
Text
From: aceactivists@comcast.net Sent: Tuesday, April 07, 2015 2:41 PM To: Bower, Fred Cc: NRC - Neil Sheehan
Subject:
QUESTIONS ABOUT 4-5-15 FIRE AT LIMERICK NUCLEAR PLANT 4-7-15 To: Fred Bower, NRC From: Dr. Lewis Cuthbert, ACE RE: QUESTIONS ABOUT 4-5-15 FIRE AT LIMERICK NUCLEAR PLANT Any fire at Limerick is concerning to us, even if it has been declared "small". We have worried about fires at Limerick since 2008, when we learned that Limerick has not been required to comply with NRC's original safer fire safety rules.
Reports on the latest 4-5-15 fire at Limerick have left us with questions.
PLEASE CLARIFY THE FOLLOWING DISCREPANCIES:
- 1. EXACTLY WHERE DID THE FIRE OCCUR? There were different reports on the location of the fire.
- Mercury: Reported a fire ignited at one of the security buildings.
If the fire actually occurred in a security building, what is the function of this building and where is it located in proximity to the reactors?
- Reading Eagle: Reported that the fire was identified in a panel in the reactor building.
To what extent was the panel in the reactor building damaged by the fire?
What systems does this panel control?
- 2. WHICH IS CORRECT? FACILITY RUNNING AT 82% OR AT FULL POWER?There were different reports on the effect the fire had on operations.
- Reading Eagle: According to officials, power operations were not affected and both units remain at full power.
- 3. WHY THE ALERT WAS REQUIRED FOR LIMERICK'S 4-6-15 FIRE.
"ALERT" means events are in progress which involve substantial degradation of nuclear plant safety.
As required, local and state officials had to be notified.
- Mercury: NRC reported that an alert was declared after a fire ignited at one of the security buildings.
- Reading Eagle: the "ALERT" was required because the fire was in the reactor building.
Questions:
- Why would a security building be involved with a system used to inject cooling water in the event the reactor needed to be shut down?
- Sheehan said that that safety system will need to be repaired as a result of the fire.
Is it possible the reactor is operating without the repairs having been made, despite this fire being serious enough to trigger an "ALERT"?
- 4. WHY DID SHEEHAN STATE "THE REACTOR" IS AT 82%, AND AT THE SAME TIME SAY "THE FACILITY" IS IN "COAST DOWN" MODE?
We need clarification.
- Sheehan said, "the reactor", suggesting impact to just that reactor, yet said "the facility" was in "coast down" mode. Why was the entire facility in "coast down" mode, if just one reactor was impacted?
- Was "coast down" mode in progress prior to the fire or initiated by fire?
- Was "the reactor" operating at 82% prior to the fire or was it in response to the fire?
- Which reactor was operating at 82%?
Associated Issues:
Sheehan said, "A third of that fuel will be replaced".
- Was he referring to the scheduled refueling for reactor Unit 2?
- Was this "coast down" due to refueling or the fire?
- Isn't the fuel in the core continuously being depleted as a matter of operations?
- What was the exact date set for Unit 2 scheduled refueling?
- Will high-burn fuel be used for this refueling? Has it ever been used at Limerick previously?
Does the safety system that handles high pressure coolant injection impact both reactors? If not, which reactor was impacted? Unit 1 or Unit 2?
- Impact of damage to this system could be critical to safe operations since the system is used to inject water in the event the reactor is ever needed to be shut down and its pressure was still too high.
- NRC confirmed that all repairs have been made?
- If not, is there deadline for completing repairs?
- Were the materials needed for repairs immediately available?
- Was this part of the system for which Exelon just received an amendment to Amendment No.
174?
Questions about Limerick's fire brigade.
- The Reading Eagle said Limerick has an on-site fire brigade.
- How many Limerick fire brigade members are required to be on-site 24/7?
- How many were on-site when the 4-6-15 Limerick fire occurred?
- Where did the water come from to put out the fire?
The Mercury report stated NRC inspectors were promptly notified and told the fire is out.
Questions:
- Was there an inspector on site to actually observe the fire, how it affected the high-pressure coolant injection system, and whether the fire was actually out when Exelon made that claim? If not, why not?
- Why does NRC consider it prompt notification if the agency was not notified until the fire was out? What time did the fire start? What time was NRC notified that it was out?
Sheehan said, "the NRC will follow up with the facility to verify the alert was declared over. Before the alert can be declared over (NRC) officials will ...double check".
- We object to Exelon determining when such an alert is declared over. NRC should make such a determination.
Sheehan said the cause of the fire is still under investigation.
- Who is doing the investigation? Exelon? or NRC?
- We request to be notified about the cause of the fire when the investigation is completed.
Our concern is that Limerick's risky experiments may involve the system that was impacted by Limerick's 4-6-15 fire. The equipment which appears to be involved in the fire seems related to other recurring problems in this equipment since at least 2011. This suggests to us that Exelon's failure to provide safety improvements could have led to this fire.
- Does NRC plan to issue a fine or violation associated with this fire?