Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML22297A14622 December 2022Issuance of Amendments Nos. 319 and 264, Regarding Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times RITSSafe Shutdown
Reactor Vessel Water Level
High Radiation Area
Ultimate heat sink
Water Inventory Control
Internal Flooding
Probabilistic Risk Assessment
Squib
FLEX
Surveillance Frequency Control Program
Large early release frequency
Maintenance Rule Program
Offsite Circuit
Fire Protection Program
ML22356A11822 December 2022E.I. Hatch (50-321; 50-366), Single Positive Test Form Collected on 08/15/2022
ML22356A11922 December 2022E.I. Hatch (50-321; 50-366), Single Positive Test Form Collected on 09/27/2022
ML22355A20821 December 2022NRR E-mail Capture - RAI - Hatch, Units 1 and 2, Reactor Pressure Vessel 'Rpv Head Studs' LARIncorporated by reference
IR 05000321/202242016 December 2022Cover Letter - Edwin I. Hatch Nuclear Plant, Units 1 & 2 Security Baseline Inspection Report 05000321/2022420 and 05000366/2022420Affidavit
ML23006A02513 December 2022NRR E-mail Capture - (External_Sender) for Your Comments - State of Georgia - Hatch Units 1 and 2 - TSTF-208 License Amendment Request
ML22341A1216 December 2022NRR E-mail Capture - Recap of Takeaways from Hatch Audit on Dec 1, 2022
NL-22-0316, Emergency License Amendment Request for Technical Specification 3.7.2 Regarding One-Time Extension of Completion Time for Plant Service Water (Psw) Pump Inoperable30 November 2022Emergency License Amendment Request for Technical Specification 3.7.2 Regarding One-Time Extension of Completion Time for Plant Service Water (Psw) Pump InoperableSafe Shutdown
High winds
Ultimate heat sink
Tornado Missile
Internal Flooding
Probabilistic Risk Assessment
FLEX
Surveillance Frequency Control Program
Large early release frequency
Time Critical Operator Action
Maintenance Rule Program
Fuel cladding
IR 05000321/202240428 November 2022Security Baseline Inspection Report 05000321/2022404 and 05000366/2022404Affidavit
ML22325A34723 November 2022Correction of Amendment Nos. 318 and 263 Issuance of Amendment Nos. 318 and 263, Regarding LAR to Revise TSTF-227 and TSTF-297Fire Protection Program
NL-22-0850, Supplement to License Amendment Request to Revise the NFPA 805 Fire Protection Program18 November 2022Supplement to License Amendment Request to Revise the NFPA 805 Fire Protection ProgramCyber Security
Fire Protection Program
ML22320A07217 November 2022Regulatory Audit in Support of Review of the Application to Relax Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure StudsIncorporated by reference
ML23026A23716 November 20222023001 Hatch RP RFI FinalHigh Radiation Area
Locked High Radiation Area
Surveillance Frequency Control Program
ML22333A04610 November 2022Marsh USA, Inc., Certificate of Liability Insurance
IR 05000366/20220038 November 2022Integrated Inspection Report 05000321 /2022003 and 05000366/2022003Safe Shutdown
Ultimate heat sink
Internal Flooding
Hydrostatic
Temporary Modification
Emergency Lighting
Functionality Assessment
Condition Adverse to Quality
Significance Determination Process
Scram Discharge Volume
Operability Determination
Fire Protection Program
ML22293A0307 November 2022Amendments 318 & 263 Issuance, Regarding LAR to Adopt TSTF-227, Revision to EOC-RPT Pump Actions, and TSTF-297, ATWS-RPT (EPID L-2021-LLA- 0227)Reactor Vessel Water Level
Surveillance Frequency Control Program
ML22305A7031 November 2022NRR E-mail Capture - Potential Audit for Hatch'S 'Rpv Head Studs' LAR
IR 05000321/202240331 October 2022Security Baseline Inspection Report 05000321/2022403 and 05000366/2022403Affidavit
IR 05000321/202240128 October 2022Material Control and Accounting Program Inspection Report 05000321/2022401 and 05000366/2022401 Cover LetterAffidavit
ML22301A17428 October 2022Global Nuclear Fuel Americas, LLC (GNF) - Part 21 60-Day Interim Report Notification: GNF3 Raised Water Rod (SC-22-04 Rt)
NL-22-0800, Supplement to Authorized Relief Request HNP-ISI-RR-05-0227 October 2022Supplement to Authorized Relief Request HNP-ISI-RR-05-02Finite Element Analysis
NL-22-0832, Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF .27 October 2022Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF .Reactor Vessel Water Level
NL-22-0801, Response to Request for Additional Information Regarding: Application to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-208, Revision 0, Extension of .14 October 2022Response to Request for Additional Information Regarding: Application to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-208, Revision 0, Extension of .