Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML18285A04627 September 2018Revision 54 to Updated Final Safety Analysis Report, Frontmatter - Revision SummarySafe Shutdown
Boric Acid
Shutdown Margin
Ultimate heat sink
Non-Destructive Examination
Coatings
Met Tower
Nondestructive Examination
Emergency Lighting
Aging Management
Surveillance Frequency Control Program
Spent Fuel Pool Instrumentation
License Renewal
Earthquake
Control of Heavy Loads
Fuel cladding
Pressure Boundary Leakage
Scaffolding
Power Uprate
Measurement Uncertainty Recapture
ML18285A04727 September 2018Revision 54 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of PlantSafe Shutdown
Boric Acid
Ultimate heat sink
Hydrostatic
Reserve Station Service Transformer
Aging Management
Earthquake
Fuel cladding
ML18285A05627 September 2018Revision 54 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion SystemBoric Acid
Loop seal
Hydrostatic
Finite Element Analysis
Aging Management
Earthquake
Turbine Missile
Liquid penetrant
Coast down
ML18285A05927 September 2018Revision 54 to Updated Final Safety Analysis Report, Chapter 13, Conduct of OperationsSafe Shutdown
Backfit
ML18285A06027 September 2018Revision 54 to Updated Final Safety Analysis Report, Chapter 14, Initial Tests and OperationBoric Acid
Shutdown Margin
Hydrostatic
ML18285A06227 September 2018Revision 54 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications and RequirementsFuel cladding
ML18285A06327 September 2018Revision 54 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance Program
ML18285A06427 September 2018Revision 54 to Updated Final Safety Analysis Report, Chapter 18, Programs and Activities That Manage the Effects of AgingBoric Acid
Non-Destructive Examination
Fire Barrier
Safe Shutdown Earthquake
Coatings
Aging Management
License Renewal
Earthquake
Maintenance Rule Program
Control of Heavy Loads
Biofouling
Fire Protection Program
Dissimilar Metal Weld
ML18275A10526 September 2018ASME Section XI Inservice Inspection Program Request for Proposed Alternative N1-I4-CS-002 Snubber Program ExtensionEarthquake
IR 05000338/201841125 September 2018U.S. Nuclear Regulatory Commission Security Target Set Inspection Report No. 05000338/2018411 and 05000339/2018411Affidavit
ML18271A02721 September 2018Confirmation of Payment
ML18264A07021 September 2018Acceptance for Review of Proposed Alternative for Pressurizer Surge Line Weld Exams
ML18267A06218 September 2018Update of Information Pertaining to Foreign Interests
ML18267A06718 September 2018Proposed Consolidated Emergency Operations Facility Response to Request for Clarification
ML18267A06818 September 2018Attachment - Response to Request for Clarification on Proposed Consolidated Emergency Operations Facility License Amendment Requests
ML18260A30514 September 2018Acceptance for Review - Proposed Alternative for the RPV Bottom Head VT Exam - North Anna Units 1 and 2VT-2
ML18260A04014 September 2018Acceptance for Review - Proposed Alternative for the Use of Phased Array UT Exam - North Anna Units 1 and 2
ML18257A22714 September 2018SPRA (Fukushima 50.54f) Audit (Clarification) Questions - Plant ResponseInternal Flooding
Probabilistic Risk Assessment
FLEX
Seismically rugged
ML18261A03010 September 2018North Anna, and ISFSI, Surry and ISFSI, Temporary Modification of Interim Compensatory Measures for Order EA-02-104Temporary Modification
ML18257A2317 September 2018SPRA (Fukushima 50.54f) Audit Questions - 2nd Set
ML18262A2144 September 2018ISFSI - Submittal of Cask Registration for Spent Fuel Storage
ML18255A0614 September 2018Submittal of Steam Generator Tube Inspection ReportNondestructive Examination
IR 05000338/201830129 August 201805000338/2018301 and 05000339/2018301 Post Exam Comments
ML18225A02029 August 2018ISFSI; North Anna 1 & 2 Isfsls, and Unit 3; Surry Power 1 & 2, and Isfsls); Dominion Energy Kewaunee, Inc. (Kewaunee Power Station and Isfsi): Request for Threshold Determination Under 10 CFR 50.80
NRC-2017-0188, Letter from the Secretary to the Petitioners Regarding Director'S Decision DD-18-0328 August 2018Letter from the Secretary to the Petitioners Regarding Director'S Decision DD-18-03
ML18240A13228 August 2018Letter from the Secretary to the Petitioners Regarding Director'S Decision DD-18-03
ML18233A47524 August 2018Summary of Safety Inspection of the Service Water Reservoir Dam (CAC Nos. 001370/05000338 and 001370/05000339; EPID L-2017-LNS-0015)
IR 05000338/201800523 August 2018Updated Inspection Plan for North Anna Power Station Units 1 and 2, NRC Report 05000338/2018005 and 05000339/2018005Cyber Security
License Renewal
IR 05000338/201820122 August 2018FOF Inspection Report 05000338/2018201 and 05000339/2018201, Cover LetterAffidavit
ML18232A50520 August 2018NRC Acceptance of License Amendment Request Regarding SBLOCA
ML18240A13517 August 2018Confirmation of Payment
ML18235A31617 August 2018SME Section XI Inservice Inspection Program Relief Requests N1-15-NDE-001 and N2-15-NDE-001 Proposed Alternative - Pzr Surge Line VT-2 Exam in Place of UT ExamBoric Acid
Weld Overlay
VT-2
Aging Management
ML18235A31717 August 2018ASME Section XI Inservice Inspection Program Relief Requests SN1-15-SPT-001 and N2-15-SPT-001 Proposed Alternative - Reactor Vessel Bottom Head Visual ExaminationBoric Acid
VT-2
ML18234A13315 August 2018ASME Section XI Inservice Program Relief Requests N1-15-CMP-001 and N2-15-CMP-001 Proposed Alternative - Use of Paut in Lieu of RtDissimilar Metal Weld
ML18173A1797 August 2018OEDO-17-00070 - Notice of Issuance of Director'S Decision, 2.206 Petition for Emergency Enforcement Action Per 10 CFR 2.206 at Listed U.S. Reactors with Forged Components and Parts Manufactured at France'S AREVA-Le Creusot Forge and Japan CNondestructive Examination
Incorporated by reference
Large early release frequency
Fuel cladding
IR 05000338/20180026 August 2018Nuclear Regulatory Commission Integrated Inspection Report 05000338/2018002 and 05000339/2018002Safe Shutdown
Packing leak
High Radiation Area
Mission time
Enforcement Discretion
Emergency Lighting
Functionality Assessment
Operability Determination
Fuel cladding
Fire Protection Program
ML18173A1752 August 2018OEDO-17-00070/SRM-DD-18-03 - Director'S Decision, 2.206 Petition for Emergency Enforcement Action Per 10 CFR 2.206 at Listed U.S. Reactors with Forged Components and Parts Manufactured at France'S AREVA-Le Creusot Forge and Japan CastingNondestructive Examination
Incorporated by reference
Large early release frequency
Fuel cladding
ML18214A32831 July 2018Units 1, 2, and 3; North Anna, Units 1 and 2; and Surry, Units 1 and 2 - Update of Information Pertaining to Foreign Interests
ML18180A19727 July 2018Issuance of Amendments to Revise Technical Specifications Regarding New and Spent Fuel Storage (CAC Nos. MF9712 and MF9713, EPID L-2017-LLA-0240)Earthquake
ML18257A22312 July 2018SPRA Audit Questions
ML18198A11812 July 2018Transmittal of Proposed License Amendment Request (LAR) Addition of Analytical Methodology to COLR Small Break Loss of Coolant Accident (SBLOCA)Post Accident Monitoring
Fuel cladding
ML18198A11511 July 2018Owner'S Activity Report (Form OAR-1), for Refueling Outage N1R25Boric Acid
ML18190A4789 July 2018Notification of North Anna Power Station, Units 1 & 2 Design Bases Assurance Inspection (Team) - U.S. Nuclear Regulatory Commission Inspection Report 05000338/2018010 and 05000339/2018010Commercial Grade Dedication
Probabilistic Risk Assessment
Functionality Assessment
IR 05000338/20180113 July 2018NRC Triennial Fire Protection Inspection (Team) Report 05000338/2018011 and 05000339/2018011Hot Short
Safe Shutdown
Unanalyzed Condition
B.5.b
Significance Determination Process
Fire Protection Program