ML18214A328

From kanterella
Jump to navigation Jump to search

Units 1, 2, and 3; North Anna, Units 1 and 2; and Surry, Units 1 and 2 - Update of Information Pertaining to Foreign Interests
ML18214A328
Person / Time
Site: Millstone, Kewaunee, Surry, North Anna  Dominion icon.png
Issue date: 07/31/2018
From: Gerald Bichof
Dominion Energy Kewaunee, Dominion Energy Nuclear Connecticut, Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Security and Incident Response
References
18-006C, NRA/MLW:R2
Download: ML18214A328 (8)


Text

Dominion Energy Services, Inc.

5000 Dominion Boulevard, Glen Allen, VA 23060 Dominion Energy.com fie Dominion

iii"* Energy
  • Personal.ly Identifiable Information Withhold Under 10 CFR 2.390 July 31, 2018 ATTN: Document Control Desk Director, Division of Security Operations Office. of Nuclear Security and Incident Response U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 DOMINION ENERGY KEWAUNEE, INC.

10CFR95.17 Serial No.:

18-006C NRA/MLW:

R2 Docket Nos.: 50-305 50-245/336/423 50-338/339 50-280/281 License Nos.: DPR-43 DPR-21/65 NPF-49 DOMINION ENERGY NUCLEAR CONNECTICUT, INC.

VIRGINIA ELECTRIC AND POWER COMPANY KEWAUNEE POWER STATION NPF-4/7 DPR-32/37 MILLSTONE POWER STATION UNITS 1, 2, AND 3 NORTH ANNA POWER STATION UNITS 1 AND 2 SURRY POWER STATION UNITS 1 AND 2 UPDATE OF INFORMATION PERTAINING TO FOREIGN INTERESTS In a letter dated September 22, 2015, the NRC notified Dominion Energy Kewaunee, Inc., Dominion Energy Nuclear Connecticut, Inc., and Virginia Electric and Power Company (collectively, the Licensees) that they would retain their non-possessing facility security clearance at the SECRET - National Security Information level. Annual certifications, including updated Owner, Officers, Directors, anc:l Executive Personnel (OODEP) li~ts for the Licensees as well as their ultimate parent company, Dominion Energy, Inc., were most recently provided to the NRC on October 19, 2017 (Serial No.17-001 E). 1 10 CFR 95.17 (a) (1) requires written notification within 30 days if certain circumstances occur. 2 1 The Licensees provided additional information to the NRC on changes to the OODEP lists on January 30, 2018, March 28, 2018 and April 24, 2018 (Serial Nos.18-006, 18-006A and18-0068 respectively).

2 By letter dated July 23, 2018, the NRC informed the Licensees that they no longer need to provide notification of the circumstances identified in the Enclosure to the NRC's September 22, 2015 letter but are required to meet all applicable requirements in 10 CFR Part 95.

ATTACHMENTS 1 AND 3 TO THIS LETTER CONTAIN INFORMATION THAT IS BEING WITHHELD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390. UPON SEPARATION OF ATTACHMENTS 1 AND 3, THIS LETTER IS DECONTROLLED.

Serial No. 18-006C Page 2 of 2 On June 30, 2018 and July 1, 2018 personnel changes were made that would affect the information previously provided on the October 2017 OODEP lists for the Licensees.

These changes are provided in the Attachments 1 through 4.

If you have any questions, please contact Michael Whitlock at 804-273-3123.

Sincerely, t.1!c:!f-T)

Senior Vice President - Nuclear Operations & Fleet Performance Dominion Energy Kewaunee, Inc.,

Dominion Energy Nuclear Connecticut, Inc. and

  • Virginia Electric and Power Company Commitments made by this letter: None : Changes in Owners, Officers, Directors and Executive Personnel for Dominion Energy Kewaunee, Inc. (Personally Identifiable Information) : Changes in Owners, Officers, Directors and Executive Personnel for Dominion Energy Nuclear Connecticut, Inc. : Changes in Owners, Officers, Directors and Executive Personnel for Virginia Electric and Power Company (Personally Identifiable Information) : Changes in Owners, Officers, Directors and Executive Personnel for Dominion Energy, Inc.

cc:

Mr. Keith Everly (w/o Attachments)

Information Security Branch Division of Nuclear Security Office of Nuclear Security and Incident Response U.S. Nuclear Regulatory Commission Mail Stop 02 D 15 11555 Rockville Pike Rockville, MD 20852-2738

Personally Identifiable Information Withhold Under 10 CFR 2.390 Serial No. 18-006C ATTACHMENT 1 Changes in Owners, Officers, Directors and Executive Personnel Dominion Energy Kewaunee, Inc.

Dominion Energy Kewaunee, Inc.

Dominion Energy Nuclear Connecticut, Inc.

Virginia Electric and Power Company THIS ATTACHMENT CONTAINS INFORMATION THAT IS BEING WITHHELD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390. UPON SEPARATION OF THIS ATTACHMENT, THIS PAGE IS DECONTROLLED.

Serial No. 18-006C ATTACHMENT 2 Changes in Owners, Officers, Directors and Executive Personnel Dominion Energy Nuclear Connecticut, Inc.

Dominion Energy Kewaunee, Inc.

Dominion Energy Nuclear Connecticut, Inc.

Virginia Electric and Power Company

Dominion Energy Nuclear Connecticut, Inc.

The following changes were effective June 30, 2018:

Serial No. 18-006C, Page 1 of 1 Mark 0. Webb resigned as Senior Vice President - Corporate Affairs and Chief Legal Officer Corynne S. Arnett resigned as Vice President - Financial Management David C. Holden resigned as Vice President - Enterprise Risk Management Darius A. Johnson resigned as Assistant Treasurer The following changes were effective July 1, 2018:

L. Wayne Duman was elected Vice President - Financial Management Simon C. Hodges was elected Vice President - Corporate Strategy and Chief Risk Officer Kristy R. Babcock was elected Assistant Treasurer The information previously reported for Mr. Hodges (letter dated July 21, 2014, Serial No. 14-002D, Attachment 5) remains the same. The information to be included on the Owners, Officers, Directors and Executive Personnel (OODEP) list for Mr. Duman and Ms. Babcock is provided in Attachment 1 to this letter.

Personally Identifiable Information Withhold Under 10 CFR 2.390 Serial No. 18-006C ATTACHMENT 3 Changes in Owners, Officers, Directors and Executive Personnel Virginia Electric and Power Company Dominion Energy Kewaunee, Inc.

Dominion Energy Nuclear Connecticut, Inc.

Virginia Electric and Power Company THIS ATTACHMENT CONTAINS INFORMATION THAT IS BEING WITHHELD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390. UPON SEPARATION OF THIS ATTACHMENT, THIS PAGE IS DECONTROLLED.

Serial No, 18-006C ATTACHMENT 4 Changes in Owners, Officers, Directors and Executive Personnel Dominion Energy, Inc.

Dominion Energy Kewaunee, Inc.

Dominion Energy Nuclear Connecticut, Inc.

Virginia Electric and Power Company

Dominion Energy, Inc.

The following changes were effective June 30, 2018:

Serial No. 18-006C, Page 1 of 1 David A. Christian retired as Executive Vice President and Chief Innovation Officer Mark 0. Webb resigned as Senior Vice President - Corporate Affairs and Chief Legal Officer Simon C. Hodges resigned as Vice President - Corporate Strategy & Financial Analysis and Chief Risk Officer David C. Holden resigned as Vice President - Enterprise Risk Management Darius A. Johnson resigned as Assistant Treasurer The following changes were effective July 1, 2018:

Mark 0. Webb was elected Senior Vice President - Corporate Affairs and Chief Innovation Officer Simon C. Hodges was elected Vice President - Corporate Strategy and Chief Risk Officer Kristy R. Babcock was elected Assistant Treasurer The information previously reported for Mr. Webb and Mr. Hodges (letter dated July 21, 2014, Serial No. 14-0020, Attachment 4 and 5, respectively) remains the same. The information to be included on the Owners, Officers, Directors and Executive Personnel (OODEP) list for Ms. Babcock is provided in Attachment 1 to this letter.

,