ML092790558 | 29 September 2009 | Response to Request for Additional Information Regarding NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems. | |
ML092740017 | 28 September 2009 | One Time Extension of the Completion Time for 1J - 480 Volts AC Distribution Subsystem (ME1777) | Probabilistic Risk Assessment |
TAC:ME2414 | 28 September 2009 | ||
ML092610705 | 25 September 2009 | Request for Additional Information Decommissioning Funding Assurance | |
ML092630007 | 23 September 2009 | Request for Alternative No. MSS-VR-02 Main Steam Safety Relief Valve Test Interval Extension | Grace period |
ML092640681 | 18 September 2009 | License Amendment Request Pursuant to 10 CFR 50.90: Revisions to Primary Coolant System Pressure Isolation Valve Requirements Consistent with Standard Technical Specifications - Tech. Spec. Sections 3.2.7.1 and 4.2.7.1 | |
TAC:ME2253 | 18 September 2009 | ||
ML101970420 | 18 September 2009 | E-mail from R. Guzman to J. Dosa Request for Additional Information - Clarification of Applicability of GEH Methods | |
IR 05000220/2009402 | 17 September 2009 | IR 05000220-09-402, 05000410-09-402; on 08/17/2009 - 08/21/2009; Nine Mile Point Nuclear Station; Security. (Letter Only) | Affidavit |
ML092600863 | 17 September 2009 | NRC Operator Licensing Retake Written Exam and Initial Operator Licensing Exam Results | |
ML092590657 | 17 September 2009 | License Amendment, Request for Removal of Operating Mode Restrictions for Performing High Pressure Core Spray Emergency Diesel Generator Surveillance Testing | |
TAC:U01782 | 16 September 2009 | ||
ML093060068 | 16 September 2009 | Final Qa/Related Forms (Form 1) | |
ML092650659 | 15 September 2009 | Slides from the Public Meeting with Constellation Energy - Nine Mile Point ISFSI Presentation | |
ML092600674 | 15 September 2009 | NRC Operator Licensing Initial Exam Results, Nine Mile Point Nuclear Station, Unit 2 (Cover Letter Publicly Available; Enclosures Withheld from Public) | |
ML093140713 | 13 September 2009 | Drawing EE-1D, Main One Line Diagram Emergency 4.16Kv & 600V System | |
TAC:ME1042 | 13 September 2009 | ||
Press Release-I-09-038, NRC, Constellation Energy to Discuss Dry Cask Storage at Company'S Nuclear Power Plants on Sept. 15 | 10 September 2009 | Press Release-I-09-038: NRC, Constellation Energy to Discuss Dry Cask Storage at Company'S Nuclear Power Plants on Sept. 15 | |
ML092510111 | 4 September 2009 | Response to NRC Regulatory Issue Summary 2009-11 | Generic Fundamentals Examination |
ML092520030 | 2 September 2009 | Submittal of Report in Accordance with 10 CFR 26.719(c)(I) Regarding Unsatisfactory Sample Testing at a Health and Human Services (HHS)-Certified Laboratory | Fitness for Duty |
ML092450274 | 2 September 2009 | Acceptance Review Determination of Amendment Request and Supplemental Information Extended Power Uprate | |
ML092440311 | 1 September 2009 | Mid-Cycle Performance Review and Inspection Plan - Nine Mile Point Nuclear Station, Dated 09/01/09 | |
ML092321087 | 1 September 2009 | Notice of Public Meeting with Constellation Energy to Discuss Plans for Construction and Operation of Independent Spent Fuel Storage Installations at Three Constellation Sites | |
ML092460596 | 28 August 2009 | Attachment 2 - CDI Report 09-26NP, Revision 0, (Non-Proprietary) Stress Assessment of Nine Mile Point, Unit 2 Steam Dryer at CLTP and EPU Conditions, Part 2 of 2 | |
ML092460553 | 28 August 2009 | Attachment 3 - CDI Report 08-08NP, Revision 2, (Non-Proprietary) Acoustic and Low Frequency Hydrodynamic Loads at CLTP Power Level on Nine Mile Point, Unit 2 Steam Dryer to 250 Hz | Finite Element Analysis |
ML092460550 | 28 August 2009 | Response to Acceptance Review Comments License Amendment Request for Extended Power Uprate | |
ML092460595 | 28 August 2009 | Attachment 2 - CDI Report 09-26NP, Revision 0, (Non-Proprietary) Stress Assessment of Nine Mile Point, Unit 2 Steam Dryer at CLTP and EPU Conditions, Part 1 of 2 | Finite Element Analysis Liquid penetrant |
TAC:ME2130 | 25 August 2009 | ||
ML092400149 | 25 August 2009 | Third 10-Year Inservice Testing Program - Request for Alternative Number MSS-VR-02 Regarding Testing of Main Steam Safety Relief Valves | Time of Discovery High Radiation Area Stroke time Scaffolding |
ML092600724 | 24 August 2009 | Handouts to Applicants (Folder 3) | |
ML092600844 | 21 August 2009 | Final - Operating Exam (Folder 3) | |
ML092600839 | 21 August 2009 | Handouts to Applicants (Folder 3) | |
ML092600834 | 21 August 2009 | Final - RO & SRO Written Examination with Answer Key (401-5 Format) (Folder 3) | |
ML092330121 | 21 August 2009 | Operator Licensing Examination Approval Nine Mile Point Nuclear Station, Unit 1 | |
ML092600826 | 21 August 2009 | Final Outlines (Folder 3) | |
ML092860566 | 20 August 2009 | Final Qa/Related Forms (Folder 1) | |
ML092320232 | 20 August 2009 | Operator Licensing Examination Approval (Nine Mile Point Nuclear Station, Unit 2) | |
ML092260127 | 19 August 2009 | Issuance of Amendment Regarding Implementation of TSTF-460, Rev 0, Control Rod Scram Time Testing Frequency, Using the Consolidated Line Item Improvement Process | |
TAC:ME1467 | 18 August 2009 | ||
ML092300025 | 18 August 2009 | Request for Additional Information Relating to Relief Request 1ISI-003, Associated with the Fourth 10-year Inservice Inspection Interval | Probabilistic Risk Assessment Large early release frequency |
TAC:ME0993 | 18 August 2009 | ||
ML092260328 | 17 August 2009 | Request for Additional Information Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling Decay Heat Removal, and Containment Spray Systems. | |
ML092370292 | 16 August 2009 | Guarantee of Payment of Deferred Premiums | |
ML092310145 | 13 August 2009 | Report on the Status of New York State Pollutant Discharge Elimination System Permit - Renewal | |
NEI 94-01, License Amendment Request Supplement Pursuant to 10 CFR 50.90: Adoption of NEI 94-01, Revision 2-A, and Extension of Primary Containment Integrated Leakage Rate Test Interval to Fifteen (15) Years.. | 13 August 2009 | License Amendment Request Supplement Pursuant to 10 CFR 50.90: Adoption of NEI 94-01, Revision 2-A, and Extension of Primary Containment Integrated Leakage Rate Test Interval to Fifteen (15) Years.. | High winds Probabilistic Risk Assessment Coatings Aging Management Local Leak Rate Testing Large early release frequency Moisture barrier License Renewal |
IR 05000220/2009007 | 7 August 2009 | IR 05000220-09-007, on March 30 - April 3, and June 8 - 12, 22 - 26, 2009; Nine Mile Point Nuclear Station, Unit One, LLC (Nmpns); IP 71003 License Renewal Commitments Inspection | Non-Destructive Examination Aging Management License Renewal EVT-1 Fire Protection Program |
ML092250346 | 5 August 2009 | E-mail from R. Guzman to J. Dosa - LAR Adoption of NEI 94-01 Rev 2A, Extension of Primary Containment ILRT Interval | |
ML092600716 | 3 August 2009 | Final Outlines (Folder 3) | |
ML092600720 | 3 August 2009 | Final - RO & SRO Written Examination with Answer Key (401-5 Format)(Folder 3) | |