MONTHYEARNMP1L3570, Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-02-0101 February 2024 Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation IR 05000220/20230042024-02-0101 February 2024 Integrated Inspection Report 05000220/2023004 and 05000410/2023004 NMP1L3569, CFR 50.46 Annual Report2024-01-26026 January 2024 CFR 50.46 Annual Report ML24004A2122024-01-0808 January 2024 Senior Reactor and Reactor Operator Initial License Examinations ML23354A0012024-01-0404 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0059 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23278A1292023-12-14014 December 2023 Units 1 & 2; Limerick, Units 1 & 2; Nine Mile Point, Units 1 & 2; and Peach Bottom, Units 2 & 3 -Revision to Approved Alternatives to Use Boiling Water Reactor Vessel and Internals Project Guidelines NMP1L3566, Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station2023-12-14014 December 2023 Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station IR 05000410/20243012023-12-14014 December 2023 Initial Operator Licensing Examination Report 05000410/2024301 ML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 NMP1L3564, Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements2023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23291A4642023-12-0707 December 2023 Issuance of Amendment No. 251 Regarding the Adoption of Title 10 the Code of Federal Regulations Section 50.69, Risk-Informed Categorization and Treatment of SSC for Nuclear Power Plants ML23289A0122023-12-0606 December 2023 Issuance of Amendment No. 250 Regarding the Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b NMP1L3563, Submittal of Relief Request I5R-12, Revision 0, Concerning the Installation of a Full Structural Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-12-0404 December 2023 Submittal of Relief Request I5R-12, Revision 0, Concerning the Installation of a Full Structural Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) IR 05000220/20234022023-11-28028 November 2023 Security Baseline Inspection Report 05000220/2023402 and 05000410/2023402 NMP1L3557, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-22022 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000220/20234202023-11-0101 November 2023 Security Baseline Inspection Report 05000220/2023420 and 05000410/2023420 ML23305A0052023-11-0101 November 2023 Operator Licensing Examination Approval IR 05000220/20230032023-10-25025 October 2023 Integrated Inspection Report 05000220/2023003 and 05000410/2023003 IR 05000220/20235012023-10-17017 October 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000220/2023501 and 05000410/2023501 IR 05000220/20230112023-10-16016 October 2023 Comprehensive Engineering Team Inspection Report 05000220/2023011 and 05000410/2023011 RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans NMP1L3554, Submittal of Revision 28 to the Final Safety Analysis Report (Updated), Fire Protection Design Criteria Document, 10CFR50.59 Evaluation Summary Report, 10CFR54.37(b) Aging Management Review, and Technical Specifications with Revised Bases2023-10-0606 October 2023 Submittal of Revision 28 to the Final Safety Analysis Report (Updated), Fire Protection Design Criteria Document, 10CFR50.59 Evaluation Summary Report, 10CFR54.37(b) Aging Management Review, and Technical Specifications with Revised Bases C IR 05000220/20233032023-09-20020 September 2023 Retake Operator Licensing Examination Report 05000220/2023303 ML23250A0822023-09-19019 September 2023 Regulatory Audit Summary Regarding LARs to Adopt TSTF-505, Rev. 2, and 10 CFR 50.69 ML23257A1732023-09-14014 September 2023 Requalification Program Inspection IR 05000220/20230052023-08-31031 August 2023 Updated Inspection Plan for Nine Mile Point Nuclear Station, Units 1 and 2 (Report 05000220/2023005 and 05000410/2023005) RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs NMP2L2851, Relief Request Associated with Successive Inspections for Generic Letter 88-01 / BWRVIP-75-A Augmented Examinations2023-08-25025 August 2023 Relief Request Associated with Successive Inspections for Generic Letter 88-01 / BWRVIP-75-A Augmented Examinations ML23151A3472023-08-21021 August 2023 Issuance of Amendments to Adopt TSTF-295-A, Modify Note 2 to Actions of PAM Table to Allow Separate Condition Entry for Each Penetration NMP1L3534, License Amendment Request - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2023-08-18018 August 2023 License Amendment Request - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation ML23220A0262023-08-0808 August 2023 Licensed Operator Positive Fitness-for-Duty Test IR 05000220/20234012023-08-0808 August 2023 Cyber Security Inspection Report 05000220/2023401 and 05000410/2023401 (Cover Letter Only) NMP1L3545, Supplemental Information Letter to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems .2023-08-0404 August 2023 Supplemental Information Letter to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems . RS-23-087, Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor2023-08-0404 August 2023 Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor IR 05000220/20230022023-08-0101 August 2023 Integrated Inspection Report 05000220/2023002 and 05000410/2023002 ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 NMP1L3544, Fifth Inservice Inspection Interval, First Inservice Inspection Period 2023 Owner'S Activity Report for RFO-27 Inservice Examinations2023-07-14014 July 2023 Fifth Inservice Inspection Interval, First Inservice Inspection Period 2023 Owner'S Activity Report for RFO-27 Inservice Examinations ML23186A1642023-07-0606 July 2023 Operator Licensing Retake Examination Approval NMP2L2846, Nine Mire Point Nuclear Station, Units 1 and 2, General License 30-day Cask Registration Notifications2023-07-0505 July 2023 Nine Mire Point Nuclear Station, Units 1 and 2, General License 30-day Cask Registration Notifications ML23192A0622023-06-30030 June 2023 Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance, Report No. 10CFR21-0136, Rev. 0 IR 05000220/20230102023-06-29029 June 2023 Biennial Problem Identification and Resolution Inspection Report 05000220/2023010 and 05000410/2023010 ML23131A4242023-06-23023 June 2023 Issuance of Amendment No. 249 Regarding the Revision to Technical Specification 3.3.1 to Adopt Technical Specifications Task Force Traveler TSTF-568 RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations NMP1L3539, Day Commitment Response - Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-06-0909 June 2023 Day Commitment Response - Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling IR 05000410/20233022023-05-15015 May 2023 Initial Operator Licensing Examination Report 05000410/2023302 2024-02-01
[Table view] Category:Status Report
MONTHYEARNMP2L2677, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions2018-07-0303 July 2018 Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions NMP1L3186, Seventh Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable ...2017-12-15015 December 2017 Seventh Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable ... RS-17-067, Sixth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under.2017-06-30030 June 2017 Sixth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under. RS-17-045, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2017-03-30030 March 2017 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations RS-16-046, Annual Property Insurance Status Report2017-03-29029 March 2017 Annual Property Insurance Status Report RS-16-236, Fifth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable Operation Under Severe.2016-12-14014 December 2016 Fifth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable Operation Under Severe. RS-16-089, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2016-07-0101 July 2016 Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) RS-16-111, Fourth Six-Month Status Report for Phases 1 & 2 Overall Integrated Plan in Response to 06/06/13 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions2016-06-30030 June 2016 Fourth Six-Month Status Report for Phases 1 & 2 Overall Integrated Plan in Response to 06/06/13 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions RS-16-094, Property Insurance Status Report for Braidwood Station, Byron Station, Calvert Cliffs, Clinton Power, Dresden Nuclear, LaSalle County, Limerick Generating, Nine Mile Point, Oyster Creek, Peach Bottom, Quad Cities, R.E Ginna, Three Mile Isl2016-04-25025 April 2016 Property Insurance Status Report for Braidwood Station, Byron Station, Calvert Cliffs, Clinton Power, Dresden Nuclear, LaSalle County, Limerick Generating, Nine Mile Point, Oyster Creek, Peach Bottom, Quad Cities, R.E Ginna, Three Mile Isla RS-16-032, Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2016-02-26026 February 2016 Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) RS-16-029, Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2016-02-26026 February 2016 Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) RS-15-207, Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2015-08-28028 August 2015 Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) RS-15-219, Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2015-08-28028 August 2015 Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) RS-15-153, Second Six-Month Status Report for Phase 1 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe..2015-06-30030 June 2015 Second Six-Month Status Report for Phase 1 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe.. RS-15-057, February 2015 Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2015-02-19019 February 2015 February 2015 Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) RS-15-058, February 2015 Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2015-02-19019 February 2015 February 2015 Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) L-14-035, December 2014 Six-Month Status Report in Response to Order EA-13-109 Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions2014-12-16016 December 2014 December 2014 Six-Month Status Report in Response to Order EA-13-109 Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions ML14069A3182014-02-27027 February 2014 February 2014 Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) ML14069A1802014-02-24024 February 2014 February 2014 Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) ML13098A0842013-03-27027 March 2013 Decommissioning Funding Status Report ML0923101452009-08-13013 August 2009 Report on the Status of New York State Pollutant Discharge Elimination System Permit - Renewal ML0908504002009-03-26026 March 2009 Units, 1 & 2, Nine Mile Point, Units, 1 & 2, and R.E. Ginna, 2009 Decommissioning Funding Status Report: Year End 2008 ML0710802622007-03-30030 March 2007 Biennial Report: Status of Decommissioning Funding Per 10 CFR 50.75(f)(1) ML0509400242005-03-29029 March 2005 Plants 2005 Report on Status of Decommissioning Funding ML0418904352004-04-18018 April 2004 Event # 40684, Nine Mile Point Re Residual Heat Removal System Isolation Due to a Rise in Reactor Pressure ML0323907172003-08-20020 August 2003 Report on Status of New York State Pollutant Discharge Elimination System ML0228204642002-09-27027 September 2002 Status of Nine Mile Point Nuclear Station State Pollutant Discharge Elimination System Permit ML17037B9561976-06-29029 June 1976 Letter Concerning Recent Events and Conclusions Concerning a Generic Review of Anticipated Transients with Scram and Requesting Additional Analyses and Identification of Design Changes by December 30, 1976 2018-07-03
[Table view] |
Text
P.O. Box 63 Lycoming, NY 13093 Nine Mile Point Nuclear Constellation Station Energy-August 13, 2009 U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 ATTENTION: Document Control Desk
SUBJECT:
Nine Mile Point Nuclear Station, LLC Unit No. I & 2; Docket Nos. 50-220 & 50-410 Report on the Status of the New York State Pollutant Discharge Elimination System Permit - Renewal Gentlemen:
Enclosed is a copy of the Renewal of the State Pollutant Discharge Elimination System (SPDES) Permit
- NY-000-1015 for the Nine Mile Point Nuclear Station. Notification of this application is provided in accordance with the following:
- Nine Mile Point Unit I letter dated April 15, 1983, which states that any changes or violations of the SPDES Permit will be provided to the NRC.
" Nine Mile Point Unit 2 Environmental Protection Plan (Appendix B to Renewed Facility Operating License No. NPF-69), Section 3.2, requires that renewals of the SPDES Permit be reported to the NRC within 30 days following the date the change or renewal is approved.
In the event there are any questions concerning the permit renewal, please contact me at (315) 349-5219.
Very truly yours, Terry . Syrell Director, Licensing TFS/RJC
~c~oo1
Document Control Desk August 13, 2009 Page 2
Enclosure:
Notice/Renewal Application/Permit Form cc: R. V. Guzman, NRC Project Manager S. J. Collins, NRC Regional Administrator, Region I Senior NRC Resident Inspector
ENCLOSURE NOTICE/RENEWAL APPLICATION/PERMIT FORM Nine Mile Point Nuclear Station, LLC August 13, 2009
New.York State Department- of Environmental Conservation Division of Environmental Permits, 4t Floor 625 Brbadway, Albany, New York 12233-1750 Phone: (518) 402-9167 - FAX: (518) 402-9168 Website: www.dec.ny.gov
'Alexander B. Grannis Comm,issioner
-JUL -3 0 2009 FACILITY INFORMATION Timothy O'Connor NAME: Nine Mile Point Nuclear Station Nine Mile Point Nuclear Station LLC LOCATION: Scriba (T)
P.O. Box 63 COUNTY: Oswego Lycoming, NY 12093 SPDES NO: NY 000 1015 DEC.ID NO.: 7-3556-00013/00001
Dear SPDES Permittee:
Enclosed please find a validated NOTICE/RENEWAL APPLICATION/PERMIT the form renewing your State Pollutant Discharge Elimination System(SPDES) permit for referenced facility. This validated form, together.with the'previously issued permit (see issuance date of this permit in Part 3 of the NOTICE/RENEWAL APPLICATION/PERMIT form),
.and any subsequent permit.modifications constitute authoriZation to discharge wastewater in accordance. with all terms, conditions and limitations-specified therein.
The instructions and.other information that you received with the NOTICE/RENEWAL APPLICATION/PERMIT package fully described procedures for renewal and modification-of your SPDES permit under the Environmental Benefit Permit Strategy (EBPS). 'As a reminder, SPDES permitsAllare renewed at a central location in Albany in order to make the process more efficient. other concerns with your permit such as applications for permit modifications, permit transfers to a new owner, name changes, and other questions should be directed to the Regional Permit Administrator at the following address:
John Feltman NYSDEC-Region.7 615 Erie Boulevard West' Syracuse, NY 13204-2400 (315)426-7438 If you have already filed an application for modification of.your permit, it will be processed separately through our regional office. If you have questions concerning this permit renewal, please contact Lindy Sue Czubernat at (518) 402-9165.
Sincerely, Chief Permit Administrator Enclosure cc: RPA RWE RECEIVED BWP AUG 04 2009 NUCLEAR LICENSING
- KK~§.
'A 4; -~
91-25-5(597)
NEW YORK STATE O&ARTMENTOFa4ROMNALCSEATN MOicE REN A lUATO I PER11T, leas rJea Al ir.jstruotvrns -on the,bw ef re cn pie~q IOl mvipfct wY~o Pams PKRITeal NINS, MILE poiNT NUCMLEAR STATI-ON, ZZLC Name; MMEN flhE. POT-INT NUCLEAR STA-TION TIMOTHY QI (O$NGR J.odI&d- 49:11- 0!owniy_
P.O. .BOX 63 OSWEGO LYC00*TNG NY 122093 SPWS:Nlo; NY 000 1015 Ap~ptCaWn aBy!, $0420 Are: tthese FlORWM ) atts) crecIfPI ~asewn _ orrcosave U ..
old~~~ 40,*rtj11-1 .O reoo a~outnildSei~rwe~.on 0i400 DECa~bW Terry F. Syrel Ieensing Director
-WilWIIaI-R. Adriance ; oWD4O
- *,3
" . Lw"c. JUL 30 200 0t+..
Ttp ttg~mow~t8 rvo~vf4pw oO ~ -Lid~and seq~u'eftmmpa~ons ae*,n the flodS eciified nSNYkfR 211i4ji &5AaSYR 71Y.9 issued or whic Wise %herafter. SI~l~thm hn~~l&
. -A ý I . ". 11 . . . - -- - - a A4tp-4;._ 1 .
I '~i>'~' -~
4 '
DA':D0Tk4PN 7 OF ENVIRON f.N:ýTA' COUNSRAO I D~EC Nurnbe 7 - 56 . 013 ;0000 1
.Avr"~t PDES Numnber:- NY 000 1015 ____
SPDES RENEWAL APPLICATION QUESTION.NAMRE THIS PAGE MUST BRE C..MPETE" FTURNED ',W]IW YOUR COMPLETED APPLICATON Please TYPE or PRINT neatly usllng adequate pressure to make ALL-copies legible. Keep a copy for your records.
- 1. .4as the ,SPDESpermit forr laciliy been modified in the past 5.years El .YES UI NO*
Dischargers who use. manufacture, store, handle or discharge toc Or haztardouspollutantsare subject to industrial
- 2. prevents or for toxic or hazardous substances. A BMP plan Best Management Practices (BMP) plan requirements m inimizes the- potential.for release of pollutants to receiving waters from sGch ancillary industrial activities, including site rurioff; i-plarnt transfer; process and material storage areas; loadingand- unloading material storage areas; plant operations, and sludge and waste disposal areas.
in your Does your facility conduct ancillary activities as described above, which are not covered by BMP.requirements current permit?'. YES -NO Please indicate which oft"he foIlowing best describes the situation at your facility; applying
[] None of the concerns on the "Self Evaluation List* seem to apply to rmyfaciliky at this time and I will not be for-a modification of the SPDES pernit :n the foreseeable fuure.-
needs to be I] Yes. some of the ites*n on the "Self Evaluation.Listr have led me to believe thatthe permit for this facility modified. t al.ready have a complete modification application pending with the Department.
] Yes. some of the items.on the "Self Evaluation List" have led meto belleve that the SPDES permit for thi* facility may and attached the need to be Modified. l. have requested the appropriate forms, by phone OR I have completed "Reque't tFoSPDES Application Fohms" (included.inthis renewal package) fo allow me to subm ita permittee-initiated Modification application. See The "Request For SPDES Application Forms" page.for atoll free 800 number.
0 The items on the "Self Evaluation List" have left me-un~ble to. conclude whether my permit. needs to be modified at this time. I am (eporting the following'general concerns about my permit.
-*The NY- EU T -'ted a.sPU S ReqTest Iniia e too inr maVT.n, Unvironmenita1 Benefit Permit Strategy-tEBPS) on January 13ý, zlU". the UWS l-t e-IS . ...
-S DISTRIBUTION: Regfonai Vialer Enginaeir Riaqina1. PRirijt A'drnistrmio certraI Office (SWP)