Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML09279055829 September 2009Response to Request for Additional Information Regarding NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems.
ML09274001728 September 2009One Time Extension of the Completion Time for 1J - 480 Volts AC Distribution Subsystem (ME1777)Probabilistic Risk Assessment
TAC:ME241428 September 2009
ML09261070525 September 2009Request for Additional Information Decommissioning Funding Assurance
ML09263000723 September 2009Request for Alternative No. MSS-VR-02 Main Steam Safety Relief Valve Test Interval ExtensionGrace period
ML09264068118 September 2009License Amendment Request Pursuant to 10 CFR 50.90: Revisions to Primary Coolant System Pressure Isolation Valve Requirements Consistent with Standard Technical Specifications - Tech. Spec. Sections 3.2.7.1 and 4.2.7.1
TAC:ME225318 September 2009
ML10197042018 September 2009E-mail from R. Guzman to J. Dosa Request for Additional Information - Clarification of Applicability of GEH Methods
IR 05000220/200940217 September 2009IR 05000220-09-402, 05000410-09-402; on 08/17/2009 - 08/21/2009; Nine Mile Point Nuclear Station; Security. (Letter Only)Affidavit
ML09260086317 September 2009NRC Operator Licensing Retake Written Exam and Initial Operator Licensing Exam Results
ML09259065717 September 2009License Amendment, Request for Removal of Operating Mode Restrictions for Performing High Pressure Core Spray Emergency Diesel Generator Surveillance Testing
TAC:U0178216 September 2009
ML09306006816 September 2009Final Qa/Related Forms (Form 1)
ML09265065915 September 2009Slides from the Public Meeting with Constellation Energy - Nine Mile Point ISFSI Presentation
ML09260067415 September 2009NRC Operator Licensing Initial Exam Results, Nine Mile Point Nuclear Station, Unit 2 (Cover Letter Publicly Available; Enclosures Withheld from Public)
ML09314071313 September 2009Drawing EE-1D, Main One Line Diagram Emergency 4.16Kv & 600V System
TAC:ME104213 September 2009
Press Release-I-09-038, NRC, Constellation Energy to Discuss Dry Cask Storage at Company'S Nuclear Power Plants on Sept. 1510 September 2009Press Release-I-09-038: NRC, Constellation Energy to Discuss Dry Cask Storage at Company'S Nuclear Power Plants on Sept. 15
ML0925101114 September 2009Response to NRC Regulatory Issue Summary 2009-11Generic Fundamentals Examination
ML0925200302 September 2009Submittal of Report in Accordance with 10 CFR 26.719(c)(I) Regarding Unsatisfactory Sample Testing at a Health and Human Services (HHS)-Certified LaboratoryFitness for Duty
ML0924502742 September 2009Acceptance Review Determination of Amendment Request and Supplemental Information Extended Power Uprate
ML0924403111 September 2009Mid-Cycle Performance Review and Inspection Plan - Nine Mile Point Nuclear Station, Dated 09/01/09
ML0923210871 September 2009Notice of Public Meeting with Constellation Energy to Discuss Plans for Construction and Operation of Independent Spent Fuel Storage Installations at Three Constellation Sites
ML09246059628 August 2009Attachment 2 - CDI Report 09-26NP, Revision 0, (Non-Proprietary) Stress Assessment of Nine Mile Point, Unit 2 Steam Dryer at CLTP and EPU Conditions, Part 2 of 2
ML09246055328 August 2009Attachment 3 - CDI Report 08-08NP, Revision 2, (Non-Proprietary) Acoustic and Low Frequency Hydrodynamic Loads at CLTP Power Level on Nine Mile Point, Unit 2 Steam Dryer to 250 HzFinite Element Analysis
ML09246055028 August 2009Response to Acceptance Review Comments License Amendment Request for Extended Power Uprate
ML09246059528 August 2009Attachment 2 - CDI Report 09-26NP, Revision 0, (Non-Proprietary) Stress Assessment of Nine Mile Point, Unit 2 Steam Dryer at CLTP and EPU Conditions, Part 1 of 2Finite Element Analysis
Liquid penetrant
TAC:ME213025 August 2009
ML09240014925 August 2009Third 10-Year Inservice Testing Program - Request for Alternative Number MSS-VR-02 Regarding Testing of Main Steam Safety Relief ValvesTime of Discovery
High Radiation Area
Stroke time
Scaffolding
ML09260072424 August 2009Handouts to Applicants (Folder 3)
ML09260084421 August 2009Final - Operating Exam (Folder 3)
ML09260083921 August 2009Handouts to Applicants (Folder 3)
ML09260083421 August 2009Final - RO & SRO Written Examination with Answer Key (401-5 Format) (Folder 3)
ML09233012121 August 2009Operator Licensing Examination Approval Nine Mile Point Nuclear Station, Unit 1
ML09260082621 August 2009Final Outlines (Folder 3)
ML09286056620 August 2009Final Qa/Related Forms (Folder 1)
ML09232023220 August 2009Operator Licensing Examination Approval (Nine Mile Point Nuclear Station, Unit 2)
ML09226012719 August 2009Issuance of Amendment Regarding Implementation of TSTF-460, Rev 0, Control Rod Scram Time Testing Frequency, Using the Consolidated Line Item Improvement Process
TAC:ME146718 August 2009
ML09230002518 August 2009Request for Additional Information Relating to Relief Request 1ISI-003, Associated with the Fourth 10-year Inservice Inspection IntervalProbabilistic Risk Assessment
Large early release frequency
TAC:ME099318 August 2009
ML09226032817 August 2009Request for Additional Information Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling Decay Heat Removal, and Containment Spray Systems.
ML09237029216 August 2009Guarantee of Payment of Deferred Premiums
ML09231014513 August 2009Report on the Status of New York State Pollutant Discharge Elimination System Permit - Renewal
NEI 94-01, License Amendment Request Supplement Pursuant to 10 CFR 50.90: Adoption of NEI 94-01, Revision 2-A, and Extension of Primary Containment Integrated Leakage Rate Test Interval to Fifteen (15) Years..13 August 2009License Amendment Request Supplement Pursuant to 10 CFR 50.90: Adoption of NEI 94-01, Revision 2-A, and Extension of Primary Containment Integrated Leakage Rate Test Interval to Fifteen (15) Years..High winds
Probabilistic Risk Assessment
Coatings
Aging Management
Local Leak Rate Testing
Large early release frequency
Moisture barrier
License Renewal
IR 05000220/20090077 August 2009IR 05000220-09-007, on March 30 - April 3, and June 8 - 12, 22 - 26, 2009; Nine Mile Point Nuclear Station, Unit One, LLC (Nmpns); IP 71003 License Renewal Commitments InspectionNon-Destructive Examination
Aging Management
License Renewal
EVT-1
Fire Protection Program
ML0922503465 August 2009E-mail from R. Guzman to J. Dosa - LAR Adoption of NEI 94-01 Rev 2A, Extension of Primary Containment ILRT Interval
ML0926007163 August 2009Final Outlines (Folder 3)
ML0926007203 August 2009Final - RO & SRO Written Examination with Answer Key (401-5 Format)(Folder 3)
ML0920102563 August 2009Request to Use Alternative for Volumetric Examination of RPV Circumferential Shell Welds for the License Renewal Period of Extended OperationIncorporated by reference