Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML070170378 | 31 December 2006 | 2006 Annual Financial Report, Note B-Summary of Significant Accounting Policies | |
ML070170375 | 31 December 2006 | 2006 Annual Financial Report, the Shift to a Global Economy and Embracing New Technology | |
ML070170372 | 31 December 2006 | 2006 Annual Financial Report | |
IR 05000397/2006301 | 27 December 2006 | Er 05000397-06-301; 11/27/06 - 12/05/2006; Columbia Generating Station; Initial Operator Licensing Examinations | |
ML063620147 | 14 December 2006 | Columbia Generating Station, Second Ten-Year Interval ISI Request 2ISI-32 | |
ML063460440 | 13 December 2006 | Response Date for Request for Additional Information Regarding Resolution of Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power (TAC Nos. MD0947 Through MD1050) | |
GO2-06-155, Initial Exam - 11/2006 - Post Exam Comments | 12 December 2006 | Initial Exam - 11/2006 - Post Exam Comments | |
ML063180317 | 11 December 2006 | Response to Bulletin 2005-02, Emergency Preparedness and Response Actions for Security-based Events | |
TAC:MC7808 | 11 December 2006 | ||
GO2-06-154, Notification of Deviation from Boiling Water Reactor Vessel and Internals Project (BWRVIP) Program Element | 11 December 2006 | Notification of Deviation from Boiling Water Reactor Vessel and Internals Project (BWRVIP) Program Element | |
GO2-06-153, Guarantee of Payment of Deferred Premium | 11 December 2006 | Guarantee of Payment of Deferred Premium | |
ML063450038 | 8 December 2006 | Exemption from 10 CFR 72.212 & 72/214 for Dry Spent Fuel Storage Activities | Exemption Request |
TAC:MD0966 | 5 December 2006 | ||
ML063180196 | 5 December 2006 | Temporary Assignment of Nuclear Regulatory Commission Project Manager (Robert F. Kuntz) Letter to Licensee | |
ML063380317 | 5 December 2006 | Enclosure 1 - Addressee List | |
ML063540193 | 30 November 2006 | Generation Station - 11-2006 - Final As-Given Written Exam, Exam Key | Safe Shutdown Time of Discovery High Radiation Area Half scram Stroke time Temporary Modification Squib Locked High Radiation Area Missed surveillance Scram Discharge Volume Fuel cladding |
ML070740443 | 27 November 2006 | Generation Station - 11-2006 - Draft Outlines | |
ML070740449 | 27 November 2006 | Generation Station - 11-2006 - Final Outlines | |
ML070740688 | 27 November 2006 | Generation Station - 11-2006 - Draft Written Examination | Safe Shutdown Time of Discovery Packing leak High Radiation Area Half scram Stroke time Temporary Modification Squib Locked High Radiation Area Missed surveillance Scram Discharge Volume Fuel cladding |
ML063280053 | 27 November 2006 | Tech Spec Pages for Amendment 199 Changes to Technical Specifications to Replace the Current Accident Source Term Used in Design Basis Radiological Analyses | High Radiation Area Ultimate heat sink Hydrostatic Squib |
ML062610440 | 27 November 2006 | Issuance of License Amendment 199 Changes to Technical Specifications to Replace the Current Accident Source Term Used in Design Basis Radiological Analyses | Anticipated operational occurrence Backfit |
ML063310411 | 27 November 2006 | EA-06-181 Ltr to J. V. Parrish, Energy Northwest (CGS) from Bruce S. Mallett, RA, Riv, Columbia Generating Station - Final Significance Determination for a Greater than Green Finding and NOV (NRC Physical Security IR 05000397, 11/27/06, W/O | Significance Determination Process |
ML063330110 | 27 November 2006 | NRC Initial Operator Licensing Examination Approval 05000397-06-301 | |
ML063320557 | 20 November 2006 | Proposed Schedule for License Renewal Application Submittal | |
GO2-06-138, Withdrawal of Request 3ISI-01 for Plant | 15 November 2006 | Withdrawal of Request 3ISI-01 for Plant | |
IR 05000397/2006004 | 14 November 2006 | IR 05000397-06-004; Energy Northwest; 7/1/2006 - 9/30/2006; Columbia Generating Station; Operability Evaluations; Other Activities | Safe Shutdown High winds High Radiation Area Ultimate heat sink Internal Flooding Temporary Modification Locked High Radiation Area Significance Determination Process Substantial potential for overexposure Siren Overexposure |
GO2-06-137, Revised Completion Dates for Commitments Made in Response to Temporary Instruction 2515/164 NRC Inspection Report 05000397/2005012 | 13 November 2006 | Revised Completion Dates for Commitments Made in Response to Temporary Instruction 2515/164 NRC Inspection Report 05000397/2005012 | B.5.b Mitigating Strategies |
GO2-06-133, Notification of Deviation from Boiling Water Reactor Vessel Internals Project (BWRVIP) Program Element | 9 November 2006 | Notification of Deviation from Boiling Water Reactor Vessel Internals Project (BWRVIP) Program Element | |
IR 05000397/2006401 | 3 November 2006 | NRC Inspection Report 05000397/2006401 | |
TAC:MD2113 | 1 November 2006 | ||
ML063100259 | 1 November 2006 | Request for Additional Information - Removal of Operating Mode Restrictions for Performing Emergency Diesel Generator Surveillance Testing | |
ML063130491 | 27 October 2006 | Energy Facility Site Evaluation Council - Columbia Generating Station Exemption Request - Review of NRC Environmental Assessment and Finding of No Significant Impact | Exemption Request |
TAC:L24030 | 27 October 2006 | ||
ML062980048 | 21 October 2006 | LTR-06-0538 - R. Leyse Ltr. Incomplete Response from the NRC on Concerns Regarding Columbia Generating Station | |
IR 05000397/2007301 | 2 October 2006 | NRC Initial Operator Licensing Examination 05000397-07-301 | |
ML062750196 | 2 October 2006 | Notice of Regulatory Conference with Energy Northwest to Discuss Three Apparent Violations Involving the Intrusion Detection System | |
TAC:MD2114 | 2 October 2006 | ||
ML061660196 | 2 October 2006 | Use of Delta Protection Suits | Mururoa |
ML062770224 | 27 September 2006 | Part 21 Report from Tyco Valves & Controls LP, Improper Valve Springs in Pressure Relief Valves | |
ML062650095 | 19 September 2006 | LTR-06-0470 - Robert Leyse E-Mail Re Tube Replacement for Main Condenser at Columbia Generating Station | Fuel cladding Downpower |
ML062620494 | 15 September 2006 | Part 21 Report by Tyco Valves and Controls, LP Re Improper Valve Springs in Pressure Relief Valves. Corrective Actions Taken by Tyco Listed | |
ML062720070 | 14 September 2006 | Request for Exemption from Certain Requirements of 10 CFR 72.212 and 72.214 for Dry Cask Storage | Design basis earthquake Exemption Request Earthquake |
GO2-06-119, Request for Exemption from Certain Requirements of 10 CFR 72.212 and 72.214 for Dry Cask Storage | 14 September 2006 | Request for Exemption from Certain Requirements of 10 CFR 72.212 and 72.214 for Dry Cask Storage | Design basis earthquake Exemption Request |
GO2-06-118, Voluntary Response to Regulatory Issue Summary 2006-15 | 13 September 2006 | Voluntary Response to Regulatory Issue Summary 2006-15 | Generic Fundamentals Examination |
TAC:MC7040 | 12 September 2006 | ||
ML062340605 | 12 September 2006 | GS-Final Response to Task Interface Agreement - TIA 2005-05, Evaluation of Main Steam Isolation Valve (MSIV) Local Leakage Rate Testing (LLRT) | |
GO2-06-116, Revision to Proposed Changes Associated with License Amendment Request - Alternative Source Term | 11 September 2006 | Revision to Proposed Changes Associated with License Amendment Request - Alternative Source Term | |
IR 05000397/2006006 | 6 September 2006 | IR 05000397-06-006; 04/17/2006 - 07/31/2006; Columbia Generating Station; Security Limited Baseline Inspection of Equipment Performance, Testing, and Maintenance - Letter | Significance Determination Process Affidavit |
ML062490451 | 6 September 2006 | IR 05000397-06-006; 04/17/2006 - 07/31/2006; Columbia Generating Station; Security Limited Baseline Inspection of Equipment Performance, Testing, and Maintenance - Letter | Significance Determination Process |
ML062430646 | 31 August 2006 | Midcycle Performance Review and Inspection Plan - Columbia Generating Station | Condition Adverse to Quality |