Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
RS-12-220, Evacuation Time Estimates for the Three Mile Island Plume Exposure Pathway Emergency Planning Zone, Cover Through Page 8-131 December 2012Evacuation Time Estimates for the Three Mile Island Plume Exposure Pathway Emergency Planning Zone, Cover Through Page 8-1
RS-12-220, Evacuation Time Estimates for the Three Mile Island Plume Exposure Pathway Emergency Planning Zone, Appendix a - Page 1 of 18 Through Appendix C - Page 45 of 9131 December 2012Evacuation Time Estimates for the Three Mile Island Plume Exposure Pathway Emergency Planning Zone, Appendix a - Page 1 of 18 Through Appendix C - Page 45 of 91Coatings
ML12340A34431 December 2012NUREG/KM-0001, Three Mile Island Accident of 1979 Knowledge Management Digest.Probabilistic Risk Assessment
Generic Issues Program
ML12355A26631 December 2012Evacuation Time Estimates for the Three Mile Island Plume Exposure Pathway Emergency Planning Zone, Cover Through Page 8-1
ML12355A26731 December 2012Evacuation Time Estimates for the Three Mile Island Plume Exposure Pathway Emergency Planning Zone, Appendix a - Page 1 of 18 Through Appendix C - Page 45 of 91Coatings
RS-12-220, Evacuation Time Estimates for the Three Mile Island Plume Exposure Pathway Emergency Planning Zone, Appendix C - Page 46 of 91 Through End31 December 2012Evacuation Time Estimates for the Three Mile Island Plume Exposure Pathway Emergency Planning Zone, Appendix C - Page 46 of 91 Through End
TMI-12-182, Response to Request for Additional Information Regarding 2011 Steam Generator Tube Inspection Report19 December 2012Response to Request for Additional Information Regarding 2011 Steam Generator Tube Inspection ReportNon-Destructive Examination
RS-12-227, Exelongeneration, Submission of Standard Practice Procedure Plans and Updated Foreign Ownership Control or Influence Package19 December 2012Exelongeneration, Submission of Standard Practice Procedure Plans and Updated Foreign Ownership Control or Influence Package
ML12348A69617 December 20121/3/2013 - Notice of Forthcoming Meeting with Exelon Generation Company, LLC, to Discuss Requests for Additional Information Regarding Exelon Physical Security Plans
TAC:MF042514 December 2012
TAC:MF042614 December 2012
TMI-12-183, Revision to the Pressure and Temperature Limit Curves and the Low Temperature Overpressure Protection Limits, and 10 CFR 50.12 Exemption Request - Initial Rt NDT Values for Linde 80 Welds14 December 2012Revision to the Pressure and Temperature Limit Curves and the Low Temperature Overpressure Protection Limits, and 10 CFR 50.12 Exemption Request - Initial Rt NDT Values for Linde 80 WeldsAnticipated operational occurrence
Hydrostatic
Surveillance Frequency Control Program
Exemption Request
ML12348A40913 December 2012NRR E-mail Capture - Clarification of Request for Additional Information Related to Exelon Physical Security Plan Submittals (Correction)
ML12348A13613 December 2012Part 21 60-Day Interim Report Notification: Adequacy of Design Change in Am Magne-Blast Circuit Breakers
ML12352A12313 December 201260-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers
RS-12-220, Three Mile Island, Unit 1 - 10 CFR 50 Appendix E Evacuation Time Estimate Analysis12 December 2012Three Mile Island, Unit 1 - 10 CFR 50 Appendix E Evacuation Time Estimate Analysis
ML12355A26512 December 201210 CFR 50 Appendix E Evacuation Time Estimate Analysis
TMI-12-181, Response to Request for Additional Information - 10 CFR 50.46 30-Day Report12 December 2012Response to Request for Additional Information - 10 CFR 50.46 30-Day Report
ML12359A03111 December 2012Ft. St. Vrain, Three Mile Island, Unit 2, and Idaho Spent Fuel Facility NRC Licenses - Notification of Facility Director Change
ML13095A45311 December 2012Single Positive Test Form, for Random, Collected on 08/27/2012
ML13095A45411 December 2012Single Positive Test Form, for Pre-Access, Collected on 08/27/2012
RS-12-207, Providing Notice of Change in Trustee for Nuclear Decommissioning Trust Funds29 November 2012Providing Notice of Change in Trustee for Nuclear Decommissioning Trust Funds
ML12333A25928 November 2012E-mail, Acceptance Review Fifth Interval IST Relief Request PR-02, Use of Code OMN-18
ML12331A08626 November 2012E-mail Acceptance Review Fifth Interval IST Relief VR-02, ASME OM Code Test FrequenciesGrace period
RS-12-176, Company, Llc'S 180-day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident19 November 2012Company, Llc'S 180-day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi AccidentSafe Shutdown
Unanalyzed Condition
Operator Manual Action
Functionality Assessment
Fukushima Dai-Ichi
Earthquake
Minimum staff
Scaffolding
ML12306A48119 November 2012Request for Additional Information Regarding 2011 Steam Generator Tube Inspection ReportNondestructive Examination
ML12362A04419 November 2012Day Response to NRC Request for Information Pursuant to 10CFR50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi AccidentFukushima Dai-Ichi
ML12321A09216 November 2012E-mail Acceptance Review
TMI-12-142, Response to NRC Request for Additional Information (RAI) Concerning TMI-1 Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan15 November 2012Response to NRC Request for Additional Information (RAI) Concerning TMI-1 Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan
IR 05000289/201200414 November 2012IR 05000289-12-004; 7/1/2012-09/30/2012; Three Mile Island, Unit 1, Integrated Inspection Report; Fire Protection, Follow-up of Events and Notices of Enforcement DiscretionBoric Acid
Shutdown Margin
Fire Barrier
Water Inventory Control
Internal Flooding
Enforcement Discretion
Fukushima Dai-Ichi
Significance Determination Process
Design basis earthquake
Operability Determination
Earthquake
Fire Protection Program
Operability Assessment
ML12321012214 November 2012Annual Report- Guarantees of Payment of Deferred Premiums
ML12310A17513 November 2012Request for Additional Information Regarding 30-Day Report for Emergency Core Cooling System Model Changes Pursuant to the Requirements of 10 CFR 50.46
ML12335A03013 November 2012NO-AA-10, Revision 87, Quality Assurance Topical Report (Qatr).Safe Shutdown
Fitness for Duty
Shutdown Margin
Non-Destructive Examination
Offsite Dose Calculation Manual
Commercial Grade Dedication
Safe Shutdown Earthquake
Coatings
Nondestructive Examination
Temporary Modification
Cyber Security
Condition Adverse to Quality
Aging Management
Process Control Program
Operability Determination
License Renewal
Maintenance Rule Program
Fire Protection Program
TMI-12-161, Report No. 12Q0108.70-R-001, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for Three Mile Island Unit 1, Page D-1 Through End7 November 2012Report No. 12Q0108.70-R-001, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for Three Mile Island Unit 1, Page D-1 Through EndFukushima Dai-Ichi
Seismically rugged
Earthquake
Scaffolding
Weak link
ML12362A0427 November 2012Report No. 12Q0108.70-R-001, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for Three Mile Island Unit 1, Page C-1 Through Page C-161Boric Acid
Safe Shutdown Earthquake
TAC:MF00467 November 2012
TMI-12-168, Submittal of Relief Requests Associated with the Fifth Inservice Testing (IST) Interval7 November 2012Submittal of Relief Requests Associated with the Fifth Inservice Testing (IST) IntervalGrace period
RS-12-175, Report No. 12Q0108.70-R-001, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for Three Mile Island Unit 1, Cover Through Page B-2097 November 2012Report No. 12Q0108.70-R-001, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for Three Mile Island Unit 1, Cover Through Page B-209Safe Shutdown
Unanalyzed Condition
Boric Acid
Packing leak
Ultimate heat sink
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Arc flash
Finite Element Analysis
B.5.b
Fukushima Dai-Ichi
Design basis earthquake
Frazil ice
Earthquake
Control of Heavy Loads
Scaffolding
Weak link
Seismic Walkdown Report
ML12362A0437 November 2012Report No. 12Q0108.70-R-001, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for Three Mile Island Unit 1, Page C-162 Through Page C-284Scaffolding
ML12311A2116 November 2012E-mail, Acceptance Review End of Interval Relief Request RR-12-01, Pressurizer Relief Nozzel Weld Exams
ML12310A2026 November 2012Electronic Transmission, Draft Request for Additional Information Regarding 30-Day Report for Emergency Core Cooling System Model Changes Pursuant to the Requirements of 10 CFR 50.46
ML12306A4541 November 2012Electronic Transmission, Draft Request for Additional Information Regarding 2011 Steam Generator Tube Inspection ReportNondestructive Examination
TAC:ME994331 October 2012
RA-12-112, Company, LLCs Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Emergency Communications Aspects of Recommendation 9.3 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident31 October 2012Company, LLCs Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Emergency Communications Aspects of Recommendation 9.3 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi AccidentHigh winds
Cyber Security
FLEX
Fukushima Dai-Ichi
Press Release-I-12-041, NRC Continues to Monitor Hurricane Sandy; No Plants Shut Down as a Result of the Storm29 October 2012Press Release-I-12-041: NRC Continues to Monitor Hurricane Sandy; No Plants Shut Down as a Result of the Storm
RA-12-111, Co, Llc'S Initial Status Report in Response to 03/12/2012 Commission Order Modifying Licenses with Regards to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order EA-12-049)25 October 2012Co, Llc'S Initial Status Report in Response to 03/12/2012 Commission Order Modifying Licenses with Regards to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order EA-12-049)FLEX
ML12299A36625 October 2012September 5, 2012, NRC Generic Fundamentals Examination Results (Cover Letter Publicly Available, Enclosures Withheld from Public)Generic Fundamentals Examination
RS-12-156, Day Response to NRC Bulletin 2012-01, Design Vulnerability in Electric Power System25 October 2012Day Response to NRC Bulletin 2012-01, Design Vulnerability in Electric Power SystemSafe Shutdown
Qualified Offsite Circuit
Open Phase Condition
Offsite Circuit
RA-12-109, Co, Llc'S Initial Status Report in Response to 03/12/2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order EA-12-051)25 October 2012Co, Llc'S Initial Status Report in Response to 03/12/2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order EA-12-051)Spent Fuel Pool Instrumentation
ML12296A21622 October 2012Acceptance Review TMI-1 RR-12-02 Letdown Nozzle Weld Swol - TAC ME9818Weld Overlay
Stress corrosion cracking
Dissimilar Metal Weld