ML17129A170 | 31 December 2010 | Official Exhibit - NRC-068-00-BD01 - Fla. Admin. Code 62-625 (2010) | Grab sample Coatings Incorporated by reference |
ML17060B011 | 31 December 2010 | NRC-068 - Fla. Admin. Code 62-625 (2010) | Grab sample Coatings Incorporated by reference |
ML103630023 | 28 December 2010 | Draft RAIs Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems | |
ML103020276 | 27 December 2010 | LTR- Turkey Point Units 3 and 4 - Exemption from the Requirements of 10 CFR Part 26 Work Hour Controls During Periods Immediately Prior and Subsequent to Severe Wind Conditions | High winds Exemption Request |
ML103020261 | 27 December 2010 | FRN- Turkey Point, Units 3 and 4 - Exemption from the Requirements of 10 CFR Part 26 Work Hour Controls During Periods Immediately Prior and Subsequent to Severe Wind Conditions (Tac ME2458 and ME2459) | High winds Exemption Request |
ML103640052 | 27 December 2010 | Logbook Entry for 12/27/2010 | |
ML103640051 | 26 December 2010 | Logbook Entry for 12/26/2010 | |
ML110030216 | 22 December 2010 | COL Hearing - Draft RAI 5309 Related to SRP Section 02.03.02 - Local Meteorology for the Turkey Point Units 6 and 7 Combined License Application | |
ML110030218 | 22 December 2010 | COL Hearing - Draft RAI 5308 Related to SRP Section 02.03.01 Regional Climatology for the Turkey Point Units 6 and 7 Combined License Application | |
ML110030217 | 22 December 2010 | COL Hearing - Draft RAI 5310 Related to SRP Section 02.03.03 - Onsite Meteorological Measurements Program for the Turkey Point Units 6 and 7 Combined License Application | |
TAC:L24485 | 22 December 2010 | ||
ML110030221 | 22 December 2010 | COL Hearing - Draft RAI 5191 Related to SRP Section 02.03.05 - Long-Term Atmospheric Dispersion Estimates for Routine Releases for the Turkey Point Units 6 and 7 Combined License Application | |
ML103570128 | 22 December 2010 | M. Nazar Letter Request for Exemption from Certain Requirements in 10 CFR Part 72 for the Turkey Point Nuclear Plant Independent Spent Fuel Storage Installation - Supplement Information Needed | Exemption Request |
L-2010-303, Supplemental Response to NRC Request for Additional Information Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Equivalent Margin Analysis (EMA) | 21 December 2010 | Supplemental Response to NRC Request for Additional Information Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Equivalent Margin Analysis (EMA) | |
ML103560181 | 20 December 2010 | License Amendment Request for Extended Power Uprate, Attachment 05; Westinghouse & Areva Affidavits for Attachment 4 | |
L-2010-113, Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 05; Westinghouse & Areva Affidavits for Attachment 4 | 20 December 2010 | Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 05; Westinghouse & Areva Affidavits for Attachment 4 | |
ML102590274 | 17 December 2010 | Summary of Teleconference Meeting with Florida Power & Light Company, on Generic Letter 2004-02 | |
L-2010-298, Units 1 & 2 - 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums | 16 December 2010 | Units 1 & 2 - 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums | |
ML103500496 | 16 December 2010 | Emcb Acceptance Review Questions | |
ML103500362 | 16 December 2010 | Notice of Meeting with Florida Power & Light Company to Allow FPL to Discuss Assessments of Safety Culture and Plans to Improve Safety Culture at FPL Sites | |
ML102871023 | 16 December 2010 | Summary of Meeting with Florida Power & Light Company to Discuss Turkey Point, Units 3 and 4, Alternative Source Term License Amendment Request | |
L-2010-031, Re-Submittal of the 2009 Annual Radioactive Effluent Release Report | 15 December 2010 | Re-Submittal of the 2009 Annual Radioactive Effluent Release Report | Grab sample Offsite Dose Calculation Manual Anticipated operational occurrence Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Power change |
L-2010-113, Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 04; Appendix a, Safety Evaluation Report Compliance | 14 December 2010 | Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 04; Appendix a, Safety Evaluation Report Compliance | Loop seal Fuel cladding Power Uprate |
ML103560178 | 14 December 2010 | License Amendment Request for Extended Power Uprate, Attachment 04; Appendix a, Safety Evaluation Report Compliance | Loop seal Fuel cladding Power Uprate |
L-2010-113, Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 3; Technical Specifications Bases Markups for Information Only | 14 December 2010 | Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 3; Technical Specifications Bases Markups for Information Only | Boric Acid Shutdown Margin Anticipated operational occurrence Hydrostatic Coast down |
ML103560176 | 14 December 2010 | License Amendment Request for Extended Power Uprate, Attachment 3; Technical Specifications Bases Markups for Information Only | Boric Acid Shutdown Margin Anticipated operational occurrence Hydrostatic Coast down |
L-2010-113, Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 2; Renewed Facility Operating License and Technical Specification Proposed Change Markups | 14 December 2010 | Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 2; Renewed Facility Operating License and Technical Specification Proposed Change Markups | |
ML103560175 | 14 December 2010 | License Amendment Request for Extended Power Uprate, Attachment 2; Renewed Facility Operating License and Technical Specification Proposed Change Markups | |
L-2010-113, Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 1; Descriptions and Technical Justifications for the Renewed Operating License, Technical Specifications, and Licensing Basis Changes | 14 December 2010 | Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 1; Descriptions and Technical Justifications for the Renewed Operating License, Technical Specifications, and Licensing Basis Changes | Boric Acid Shutdown Margin Hydrostatic Fuel cladding |
ML103560168 | 14 December 2010 | License Amendment Request for Extended Power Uprate (LAR No. 205) | |
L-2010-293, Response to Request for Additional Information (RAI) Regarding Alternative Source Term (AST) License Amendment Request (LAR) No. 196 and Meteorological Data Sensitivity | 14 December 2010 | Response to Request for Additional Information (RAI) Regarding Alternative Source Term (AST) License Amendment Request (LAR) No. 196 and Meteorological Data Sensitivity | |
ML103560174 | 14 December 2010 | License Amendment Request for Extended Power Uprate, Attachment 1; Descriptions and Technical Justifications for the Renewed Operating License, Technical Specifications, and Licensing Basis Changes | Boric Acid Shutdown Margin Hydrostatic Fuel cladding |
L-2010-113, Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 04; Appendix B, Additional Codes and Methods | 14 December 2010 | Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 04; Appendix B, Additional Codes and Methods | Finite Element Analysis |
ML103560180 | 14 December 2010 | License Amendment Request for Extended Power Uprate, Attachment 04; Appendix C, List of Key Acronyms | Ultimate heat sink Earthquake |
L-2010-113, Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 04; Appendix C, List of Key Acronyms | 14 December 2010 | Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 04; Appendix C, List of Key Acronyms | Ultimate heat sink Earthquake |
ML103560182 | 14 December 2010 | License Amendment Request for Extended Power Uprate, Attachment 06; Summary of Regulatory Commitments | Safe Shutdown |
L-2010-113, Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 06; Summary of Regulatory Commitments | 14 December 2010 | Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 06; Summary of Regulatory Commitments | Safe Shutdown |
L-2010-113, Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 07; Supplemental Environmental Report | 14 December 2010 | Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 07; Supplemental Environmental Report | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report License Renewal Environmental Justice Power Uprate |
ML103560184 | 14 December 2010 | License Amendment Request for Extended Power Uprate, Attachment 08; Cameron/Caldon Ultrasonics Engineering Reports | |
L-2010-113, Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 08; Cameron/Caldon Ultrasonics Engineering Reports | 14 December 2010 | Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 08; Cameron/Caldon Ultrasonics Engineering Reports | |
ML103560179 | 14 December 2010 | License Amendment Request for Extended Power Uprate, Attachment 04; Appendix B, Additional Codes and Methods | Finite Element Analysis |
ML103560183 | 14 December 2010 | License Amendment Request for Extended Power Uprate, Attachment 07; Supplemental Environmental Report | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report License Renewal Environmental Justice Power Uprate |
ML103481017 | 13 December 2010 | Conversation Record with P. Czava, Florida Power and Light Company Discuss Nrc'S Acceptance Review of the Turkey Point 10 CFR Part 72 Exemption Request and the Necessary Request for Supplemental Information | Exemption Request |
IR 05000250/2010404 | 10 December 2010 | EA-10-241, IR 05000250-10-404 and 05000251-10-404, Turkey Point Nuclear Power Plant-NRC Security Inspection, Preliminary White Finding and Apparent Violation | Significance Determination Process Preliminary White Finding Affidavit |
ML102670183 | 19 November 2010 | Summary of Category 1 Public Meeting with Florida Power & Light Company (FPL) to Discuss Forthcoming Submittal of the St. Lucie and Turkey Point Extended Power Uprates | |
ML102380596 | 18 November 2010 | Upcoming Steam Generator Tube Inservice Inservice Inspection | |
TAC:ME4556 | 18 November 2010 | ||
L-2010-275, Post Exam Comments | 15 November 2010 | Post Exam Comments | |
ML103120500 | 10 November 2010 | Notice of Forthcoming Teleconference with Florida Power & Light to Discuss Differences Between the Turkey Point Spent Fuel Pool Criticality Analysis License Amendment Request Currently Under Review & Draft Division of Safety Systems Interim | |
ML103010089 | 5 November 2010 | Verbal Authorization of Relief Request No. 8, Transfer Canal Drain Line Piping Repairs |