Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML103630359 | 16 December 2010 | Post Accident Monitoring Report | Post Accident Monitoring |
ML103560083 | 13 December 2010 | Response to Request for Additional Information on Cyber Security Plan | Cyber Security |
IR 05000338/2010006 | 10 December 2010 | IR 05000338-10-006 & 05000339-10-006; on 10/04-15/2010; Virginia Electric and Power Company; North Anna Power Station Units 1 and 2, NRC Special Inspection Report | Boric Acid Coatings |
ML103270357 | 22 November 2010 | Fleet (Kewaunee, Millstone 2 & 3, North Anna 1 & 2, Surry 1 & 2) Nuclear Plants Email - Cyber Security Plan (License Amendment (TAC No. ME4319, ME4320,4321, ME4322, 4323, and ME4324, 4325) | Cyber Security |
ML103220444 | 18 November 2010 | Public Meeting Summary - North Anna Power Station | Boric Acid |
ML103060097 | 15 November 2010 | (Naps), Units 1 and 2, Fourth 10-Year Inservice Testing Interval Program, Pumps and Valves Relief Request (RR) (TAC Nos. ME2776 and ME2777) | Temporary Modification Incorporated by reference Scaffolding |
ML103200451 | 15 November 2010 | Supplemental Response to Request for Additional Information for Exemption Request for the RCP Oil Collection System | Safe Shutdown Exemption Request |
ML110341610 | 12 November 2010 | FEMA North Anna Power Station After Action Report/Improvement Plan, Drill Date - July 20, 2010, Radiological Emergency Preparedness (REP) Program | |
ML103160422 | 10 November 2010 | Scope of Systems Clarification | Cyber Security |
ML103140637 | 10 November 2010 | Acceptance Review of Addition of Analytical Methodology to COLR Best-Estimate Large Break LOCA-TAC ME4933 and ME4934 | Exemption Request |
ML103120708 | 8 November 2010 | Cycle 22 Core Operating Limits Report, Revision 1 | Shutdown Margin |
ML103090355 | 5 November 2010 | Meeting Announcement - Public Meeting - North Anna, to Provide Open Public Forum to Discuss Recent Discovery and Remediation of Containment Insulation Issues | |
ML102510218 | 2 November 2010 | Fourth 10-Year Interval Inservice Inspection (ISI) Program, System Pressure Testing (Spt), SPT-001 Through SPT-006 (TAC Nos. ME3311 Thru ME3316) | Boric Acid High Radiation Area Hydrostatic VT-2 Incorporated by reference |
ML102571627 | 1 November 2010 | Issuance of Amendments 260 & 241 Regarding Change to Technical Specification (TS) 3.7.12, Emergency Core Cooling System (ECCS) Pump Room Exhaust Air Cleanup System (Preacs) | Mission time |
IR 05000338/2010004 | 29 October 2010 | IR 05000338-10-004, 05000339-10-004, 07200056-10-001; 07/01/2010 - 09/30/2010; North Anna Power Station, Units 1 & 2, and North Anna Independent Spent Fuel Storage Installation: Plant Modifications; Identification and Resolution of Problems | Safe Shutdown Boric Acid Non-Destructive Examination Fire Barrier Water Inventory Control Weld Overlay Reserve Station Service Transformer Temporary Modification Condition Adverse to Quality Aging Management Significance Determination Process Large early release frequency Operability Determination Maintenance Rule Program Fire Watch Weak link |
IR 05000338/2010501 | 22 October 2010 | IR 05000338-10-501 and 05000339-10-501, on 09/29/2010, for North Anna Power Station, Units 1 and 2 Baseline Inspection | |
TAC:ME4933 | 21 October 2010 | ||
ML102980447 | 21 October 2010 | Proposed License Amendment Request (LAR) Addition of Analytical Methodology to COLR Best-Estimate Large Break Loss of Coolant Accident (BE-LBLOCA) | Post Accident Monitoring Exemption Request Fuel cladding |
ML102870109 | 11 October 2010 | Resubmittal of Response to Request for Additional Information for Exemption Request for the RCP Oil Collection System | Safe Shutdown Fire Barrier Exemption Request Fire Protection Program |
ML102940288 | 9 October 2010 | Technical Specifications Bases Changes | Safe Shutdown Unanalyzed Condition Boric Acid Shutdown Margin Reactor Vessel Water Level High Radiation Area Ultimate heat sink Non-Destructive Examination Grab sample Fire Barrier Stroke time Anticipated operational occurrence Tornado Missile Time to boil Post Accident Monitoring Internal Flooding Hydrostatic Coatings Reserve Station Service Transformer Qualified Offsite Circuit Missed surveillance Battery sizing Earthquake Turbine Missile Fuel cladding Pressure Boundary Leakage Recently irradiated fuel Offsite Circuit Power change Unidentified leakage |
ML102940278 | 9 October 2010 | Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.d | |
ML102510245 | 6 October 2010 | Fourth 10-Year Inservice Inspection Interval Program, Nondestructive Examination, Relief Request, NDE-001, | Boric Acid Nondestructive Examination VT-2 Incorporated by reference |
Press Release-II-10-068, NRC Begins Special Inspection at North Anna Nuclear Plant | 5 October 2010 | Press Release-II-10-068: NRC Begins Special Inspection at North Anna Nuclear Plant | |
ML102861810 | 4 October 2010 | Associated Isfsis, Submittal of Security, Training and Qualification Plan, Safeguards Contingency Plan & ISFSI Security Program, Rev. 10 | |
ML102780072 | 4 October 2010 | Special Inspection Charter |