ML08366038722 December 2008Confirmatory Order EA-06-178, Section IV.6 2008 Nuclear Safety Culture Survey ResultsAffidavit
ML08357060922 December 2008E-mail Point Beach - Draft Request for Additional Information for LAR-258, LOCA Analysis Using Astrum
NRC 2008-0090, Confirmatory Order EA-06-178 - Section IV.6 2008 Nuclear Safety Culture Survey Results22 December 2008Confirmatory Order EA-06-178 - Section IV.6 2008 Nuclear Safety Culture Survey ResultsAffidavit
L-2008-265, 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums19 December 200810 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums
NRC 2008-0098, 2007 Annual Monitoring Report (Revised)19 December 20082007 Annual Monitoring Report (Revised)Grab sample
Offsite Dose Calculation Manual
Met Tower
Chernobyl
ML08359027717 December 2008Letter Point Beach Request for Waiver of Plant Experience Requirement
NRC 2009-0044, American Transmission Company - Interconnection System Impact Study Report, 106 MW Nuclear Generation Increase (53 MW Each at Point Beach Generators 1 and 2), Revision 317 December 2008American Transmission Company - Interconnection System Impact Study Report, 106 MW Nuclear Generation Increase (53 MW Each at Point Beach Generators 1 and 2), Revision 3
IR 05000266/200840410 December 2008IR 05000266-08-404, (Drs), IR 05000301-08-404, (Drs), on 08/25/2008 - 08/29/2008, 10/28/2008 - 10/29/2008, and 11/25/2008, for Point Beach, Units 1 and 2, Routine Security Baseline Inspection - Cover Letter
ML10194038210 December 2008Calculation PBNP-994-21-12, Rev. 0, Task 12 Jet Impingement Calculations, Enclosure 1, Attachment 12Boric Acid
Through-Wall Leak
TAC:ME02198 December 2008
NRC 2008-0085, Point Beach, Units 1 & 2, Transmittal of ARCON96 and Radtrad Cds Supporting Alternative Source Term License Amendment Request 2418 December 2008Point Beach, Units 1 & 2, Transmittal of ARCON96 and Radtrad Cds Supporting Alternative Source Term License Amendment Request 241
NRC 2008-0081, Submittal of License Amendment Request 241, Alternative Source Term8 December 2008Submittal of License Amendment Request 241, Alternative Source TermBoric Acid
Mission time
Anticipated operational occurrence
Time to boil
Deep Dose Equivalent
Fuel cladding
Pressure Boundary Leakage
Recently irradiated fuel
Power change
Unidentified leakage
Power Uprate
Affidavit
ML0835703388 December 2008Transmittal of ARCON96 and Radtrad Cds Supporting Alternative Source Term License Amendment Request 241
NRC 2008-0085, Transmittal of ARCON96 and Radtrad Cds Supporting Alternative Source Term License Amendment Request 2418 December 2008Transmittal of ARCON96 and Radtrad Cds Supporting Alternative Source Term License Amendment Request 241
ML0834501614 December 2008GFE Annual Registration Letter - 2009 ExaminationsGeneric Fundamentals Examination
ML08325051226 November 2008FPL Energy Point Beach, LLC - Request for Withholding of Proprietary Information from Public Disclosure for Point Beach Nuclear Plant, Units 1 and 2
TAC:ME104425 November 2008
NRC-2008-0086, License Amendment Request 258 Incorporate Best Estimate Large Break Loss of Coolant Accident (LOCA) Analysis Using Astrum25 November 2008License Amendment Request 258 Incorporate Best Estimate Large Break Loss of Coolant Accident (LOCA) Analysis Using AstrumFuel cladding
ML08326070921 November 2008Ltr. 11/21/08 - NRC Participation in the Point Beach December 2008 Emergency Preparedness Exercise (Plume Phase and Ingestion Pathway)
ML08311086020 November 2008Evaluation of the Request for an Extension of Enforcement Discretion in Accordance with the Interim Enforcement Policy for Fire Protection Issues During Transition to National Fire Protection Standard NFPA 805Enforcement Discretion
Probabilistic Risk Assessment
Operator Manual Action
Fire Protection Program
TAC:MD964620 November 2008
ML08323082020 November 2008Teleconference Summary Regarding the 2008 Steam Generator Tube Inspection Results
ML10194038018 November 2008Calculation PBNP-994-21-06, Rev. 0, HELB Reconstitution Program - Task 6 - Break and Crack Size/Location Selection, Enclosure 1, Attachment 9
ML08311089918 November 2008FPL Energy Point Beach, LLC - Request for Withholding of Proprietary Information from Public Disclosure for Point Beach Nuclear Plant, Units 1 and 2
ML10194038112 November 2008Calculation PBNP-994-21-10, Rev. 0, HELB Reconstruction Program Task 10 - Gothic Pressure Analyses, Enclosure 1, Attachment 10
ML10194038312 November 2008Calculation PBNP-994-21-09, Rev. 0, HELB Reconstitution Program Task 09 - Gothic Models, Enclosure 1, Attachment 14
ML10194039112 November 2008Calculation PBNP-994-21-07, Rev. 0, HELB Task 07 - Mass & Energy Release for Pressure Limiting Cases, Enclosure 1, Attachment 17
NRC 2008-0078, Status of Action Plans Taken in Response to Confirmatory Order EA-06-17811 November 2008Status of Action Plans Taken in Response to Confirmatory Order EA-06-178
ML0830902566 November 2008Closeout of Generic Letter 2007-01 Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients
ML0829100936 November 2008Summary of the October 14, 2008, Pre-Application Meeting with FPL Energy Point Beach, LLC, on the Proposed Alternative Source Term Amendment RequestBackfit
TAC:MD43656 November 2008
IR 05000266/20080044 November 2008IR 05000266-08-004, 05000301-08-004 on 07/01/2008 - 09/30/2008 for Point Beach, Units 1 & 2Boric Acid
Offsite Dose Calculation Manual
Fire Barrier
Weld Overlay
Internal Flooding
Enforcement Discretion
Probabilistic Risk Assessment
Significance Determination Process
Job Performance Measure
Dissimilar Metal Weld
Downpower
Operability Assessment
Power Uprate
L-2008-237, Comment (2) of Robert J. Hughes for Point Beach30 October 2008Comment (2) of Robert J. Hughes for Point Beach
NRC 2007-0080, Revised Schedule for Submittal of Emergency Core Cooling System Evaluation Model for Large Break Loss of Coolant Accident30 October 2008Revised Schedule for Submittal of Emergency Core Cooling System Evaluation Model for Large Break Loss of Coolant Accident
L-2008-233, Units 1 and 2 - Correspondence Distribution Listing Update Request28 October 2008Units 1 and 2 - Correspondence Distribution Listing Update Request
NRC 2008-0081, Point Beach, Unit 1, Cycle 32 (U1C32) Core Operating Limits Report.24 October 2008Point Beach, Unit 1, Cycle 32 (U1C32) Core Operating Limits Report.Shutdown Margin
ML08301023124 October 2008Cycle 32 (U1C32) Core Operating Limits Report.Shutdown Margin
ML10194036421 October 2008Calculation PBNP-994-21-02, Rev. 0, HELB Reconstitution Program - Task 2, High Energy System Selection, Enclosure 1, Attachment 2
ML08296070720 October 2008Letter Confirmation of Initial/Requalification Operator License Examinations, for Point Beach Nuclear Plant
NRC 2008-0076, Transmittal of Small Break Loss of Coolant Modeling Information for Extended Power Uprate17 October 2008Transmittal of Small Break Loss of Coolant Modeling Information for Extended Power Uprate
L-2008-223, Florida Power & Light - Official Service List Change15 October 2008Florida Power & Light - Official Service List Change
TAC:MD952914 October 2008
ML08289052714 October 2008Meeting with NRC on AST
NRC 2008-0075, Nine-Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems14 October 2008Nine-Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray SystemsBoric Acid
Time of Discovery
Condition Adverse to Quality
ML08288057014 October 2008LB Memorandum and Order (Denying Request for Hearing) (LBP-08-19)
ML0825408837 October 2008Issuance of License Amendment, Technical Specification 5.5.8 and 5.6.8Safe Shutdown Earthquake
Nondestructive Examination
Fuel cladding
Affidavit
ML0828202737 October 2008Gfes Results September 2008Generic Fundamentals Examination
ML0828101267 October 2008Summary of Meeting Between NRC Region III Management and FPL Energy Point Beach, LLC Representatives to Discuss the Cross-Cutting Issues and Recent Culture Survey
ML0822503306 October 2008Teleconference Summary Regarding Point Beach Nuclear Plant Supplement to the Auxiliary Feedeater AmendmentSafe Shutdown
Unanalyzed Condition
Probabilistic Risk Assessment
Fire impairment
Emergency Lighting
Fire Watch
ML0822701586 October 2008Summary of Meeting with FPL Energy Point Beach LLC, on the Auxiliary Feedwater Technical Specification Completion Time Extension Amendment RequestSafe Shutdown
Unanalyzed Condition
Probabilistic Risk Assessment
Fire impairment
Operator Manual Action
Emergency Lighting
Fire Watch