ENCLOSURE 1 ATTACHMENT 10 NEXTERA ENERGY POINT BEACH, LLC POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 LICENSE AMENDMENT REQUEST 261 EXTENDED POWER UPRATE RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION PBNP-994-21-10, REVISION 0, HELB RECONSTITUTION PROGRAM TASK 10 - GOTHIC PRESSURE ANALYSES 32 pages follow
Automated CALCULATION SHEET Page: 4 of 8 fI Engineering Calc. No.:
Services Corp.
PBNP-994-2 1-10 Client: FP&L Energy Revision:
0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.
Title:
HELB Reconstitution Program Task 10-GOTHIC Pressure Analyses Reviewed By: CD Henry Safety Related Yes El No EliI Date: 11/12/2008 Table of Contents Section Title Page 1.
2.
3.
4.
5.
6 7.
8.
9.
Purpose Design Input Assumptions Acceptance Criteria Software Methodology Analysis Conclusions References 5
5 5
6 6
6 7
8 8
Attachment Title No. of Pages A
B Case Specific Changes Made to the Base Cases Maximum Pressure Distribution Results 1
26 Form 3.1-3 Rev. 2
Automated CALCULATION SHEET Page: 5 of 8 Engineering Calc. No.:
Services Corp.
PBNP-994-21-10 Client: FP&L Energy Revision:
0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.
Title:
HELB Reconstitution Program Task 10-GOTHIC Pressure Analyses Reviewed By: CD Henry Safety Related Yes El No El Date: 11/12/2008
- 1.
Purpose The purpose of Task 10 of the High Energy Line Break (HELB) Reconstitution Program as defined in Design Input (DI) 1 is to determine the pressure responses in the Primary Auxiliary Building and the Turbine Building of the Point Beach Nuclear Power Plant using the appropriate mass and energy releases for the limiting HELBs defined in Task 6 (DI 2). The M&E data to be used was determined under Task 7 and is documented in DI 3. In addition, the data documented in DI 5 was used for one of the HELBs. The analyses are performed using the GOTHIC base case models developed under Task 9 and documented in DI 4.
- 2.
Design Input The Design Input (DI) used in this analysis consists of the following:
- 1. AES Project Plan PBNP-994-21-01 "Project Plan for HELB Reconstitution Program" December 18, 2007.
& Crack Size/Location Selection".
- 3. AES Calculation PBNP-994-21-07 Rev. 0, "HELB Task 07 - Mass & Energy Releases for Pressure Limiting Cases".
- 5. Point Beach Calculation 2008-12355 Rev. 0, "Mass and Energy Calculation for High Energy Line Break in 3" Steam Line within CCW HX Room".
- 3.
Assumptions
- 1. No credit is taken for isolation of the break/crack flow during the short period of duration until the peak pressure has been reached for these pressure limiting cases.
- 2. The exact location of the breaks within the compartments is not a significant factor, because the volumes associated with them are relatively large. The bottom elevation of the break is assumed to be at the elevation of the volume mid-plane. The break height is assumed to be 0.1 ft.
- 3. In cases where breaks are located in a room that is represented by more than a single lumped volume in the GOTHIC model or located within more than one room, the break is placed in the limiting volume or room.
Form 3.1-3 Rev. 2
Automated CALCULATION SHEET Page: 6 of 8 Engineering Cale. No.:
Services Corp.
PBNP-994-2 1-10 Client: FP&L Energy Revision:
0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.
Title:
HELB Reconstitution Program Task 10-GOTHIC Pressure Analyses Reviewed By: CD Henry Safety Related Yes
[K]
No D
Date: 11/12/2008
- 4. The modeling of the doors and openings within the PAB is the same as in the DI 4 base case.
- 5. Metal wall panels blow open at 0.5 psi.
- 4.
Acceptance Criteria There are no acceptance criteria associated with the analyses documented in this calculation.
- 5.
Software The version of GOTHIC Version 7.2a(QA) (Reference 1) as provided to AES by FP&L Energy was used for the these analyses.
- 6.
Methodology The methodology consisted of the following steps:
- 1. The limiting pressure cases defined in DI 3 were reviewed to determine the case list.
- 2. The GTH file for the base case models documented in DI 4 which are steady state cases were modified by incorporating the appropriate M&E data from DI 3 and 5 via the boundary HELB condition which was tripped on after the 1 second initialization.
- 3. Also, the HELB path which is between the HELB boundary condition and the volume in which the HELB is located was changed in the GTH file as needed. This change consisted of using the replace flow path option and moving the Volume A connection to the volume that represents the room where the HELB is located. Also, the elevation for that connection was changed to the mid elevation of that volume based on Assumption 2.
- 4. The GTH files for these cases are identified from their names in the following manner:
PB-PAB-XXX P where XXX is the room designation of the break location.
- 5. The end times of these cases (10 sec) were set sufficiently large, so that the peak pressure is achieved in all the volumes that see the effects of the HELB.
- 6. Attachment A documents the specific changes made to the base case for each of the cases that were run.
- 7. Note that the DI 4 base case incorporates modeling of the Blow Out Panels (BOP) that have a significant impact on the pressures.
Form 3.1-3 Rev. 2 Form 3.1-3 Rev. 2
Automated CALCULATION SHEET Page: 7 of 8 1
Engineering Calc. No.:
Services Corp.
PBNP-994-21 -10 Client: FP&L Energy Revision:
0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.
Title:
HELB Reconstitution Program Task 10-GOTHIC Pressure Analyses Reviewed By: CD Henry Safety Related Yes El-No El Date: 11/12/2008
- 7.
Analysis Based on a review of the pressure limiting cases identified in DI rooms were not analyzed.
3, HELBs in the following Room 524 - Room 596 is more limiting, since its volume is smaller.
Room 583 - Room 301 is assumed to encompass this room.
Rooms 224 and 122 - These rooms have large opens into the Turbine Building and the HELB M&E is relatively small.
Rooms 147, 146, 137, 144, and 145 - The HELB in these rooms is relatively small and does not present a challenge for a limiting pressure response, so the one in Room 140 was chosen as a typical case.
Room 360 - This room is not part of the PAB and therefore is excluded from this analysis.
Room 238 - The HELB in this room is bounded by the one in Room 271.
Room 273 - The HELB in this room is bounded by the one in Room 272.
Note that based on DI 5 of DI 4 there are three different HELBs within three vertical zones that must be considered in the facades. However, the HELB is identical in both facades in each of the zones.
The following table presents the summary of the results of the pressure limiting cases that were run. The maximum pressures in this table are for all of the volumes. The distributions of the maximum pressures for all volumes for these cases are shown in Attachment B.
Room GOTHIC Case ID Maximum Pressure and Time [psia(psig)/sec]
596 PB-PAB-596 P 14.936(0.561) / 0.13 301 PB-PAB-301 P 14.984(0.609) / 1.06 140 PB-PAB-140 P 14.510(0.135) / 0.12 237 PB-PAB-237 P 14.837(0.462) / 1.27 271 PB-PAB-271 P 14.479(0.104) / 1.08 272 PB-PAB-272 P 14.477(0.102) / 1.08 Note that all initial pressures are 14.375psia and the gauge pressures listed in the previous table are relative to that pressure.
Form 3.1-3 Rev. 2 Form 3.1-3 Rev. 2
Automated CALCULATION SHEET Page: 8 of 8 E
Engineering Calc. No.:
Services Corp.
PBNP-994-2 1-10 Client: FP&L Energy Revision:
0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Cale.
Title:
HELB Reconstitution Program Task 10-GOTHIC Pressure Analyses Reviewed By: CD Henry Safety Related Yes El No D
Date: 11/12/2008 It should be noted the maximum pressures for the last two cases do not occur in the room where the HELB is located, since the HELB M&E is relatively small. These listed maximums reflect the fact that the base case model has a slight pressure increase during the problem run time period as noted for the base case results documented in DI 4. Also it should be noted that the maximum pressures for some of the volumes listed in Attachment B occur at t
= 0.0 for some cases. This fact indicates a slight downward drift in the pressures for those volumes which are unaffected by the HELB and is a consequence that it is impossible to achieve perfect steady state conditions with the numerical algorithms used by the code for the transient-solutions. This fact was noted for the base case results documented in DI 4.
Also the maximums for some of the volumes occur at the problem end time of 10 sec.,
however -these volumes are not limiting and are -not of concern.
- 8.
Conclusions The analyses of the pressure limiting cases for the PB PAB are documented in this calculation, and the distributions of the maximum pressures for all the cases are contained in the tables in Attachment B. These results can be used to evaluate structural integrity within these buildings.
- 9.
References
January 2006", NAI 8907-02 Rev 17 Form 3.1-3 Rev. 2
Automated CALCULATION SHEET Page: A-I of A-i j
Engineering Calc. No.:
Services Corp.
PBNP-994-21 -10 Client: FP&L Energy Revision:
0 Station: Point Beach Nuclear Plant Prepared By: RCKern Calc.
Title:
HELB Reconstitution Program Task 10-GOTHIC Pressure Analyses Reviewed By: CDHenry Safety Related Yes
[g-No D Date: 11/12/2008 Attachment A Case Specific Changes Made to the Base Case This attachment documents the specific changes made to the 4 for each of the pressure limiting cases that were analyzed.
base case documented in DI GOTHIC Case ID HELB Volume Mass Flow Rate (Ibm/s)
Enthalpy (BTU/Ibm)
PB-PAB-596 P 125s3 9245 1191 PB-PAB-301 P 134 5669 1191 PB-PAB-140! P 25sl 272 249 PB-PAB-237 P 103 See Note 1 See Note 2 PB-PAB-271 P 95s12 3
1191 PB-PAB-272 P 108 95 1191 Note 1: The time dependent flow in Table 7.1 of DI 5 (Hot Shutdown) was entered with Forcing Function 65.
Note 2: The constant value of 1192.2 as given in Table 7.1 of DI 5 (Hot Shutdown) was entered with Forcing Function 66.
The M&E data is entered using Boundary Condition 125F that was tripped on with Component Trip 36 (t = 0.0) with the steam and air volume fractions set to 1 and 0, respectively.
FP 616 is the HELB flow path, so the Volume A for FP 616 is the HELB volume listed above, and the elevation and height for that connection was set accordingly.
Form 3.1-3 Rev. 2
I Automated CALCULATION SHEET Page: B-1 of B-26 Engineering Calc. No.:
Services Corp.
PBNP-994-21-10 Client: FP&L Energy Revision:
0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.
Title:
IELB Reconstitution Program Task 10-GOTHIC Pressure Analyses Reviewed By: CD Henry Safety Related Yes
[E]
No
[EI Date: 11/12/2008 Attachment B Maximum Pressure Distribution Results This attachment contains the tables of the maximum pressures for each of the volumes (cells) for the six cases that were run as identified in Section 7. The volume (ft3) along with the maximum pressure (psia) and time of occurrence (sec) are Included for each of the volumes in the models. The first set of cell numbers in these tables shows the numerical sequence of the cells (volumes and sub-volumes for subdivided volumes) in which GOTHIC processes the calculations, and the second set shows the cell number within the volumes and subdivided volumes. Refer to Section 10.2 of Reference 1. The -results-as obtained from the max-press.txt files generated by GOTHIC as described in DI 4 have been reordered from the highest to lowest maximum pressure and the times of the maximums are given to the nearest hundredth of a sec.
B.1 PB-PAB-596_P Max Pressure Filename Cell Vol L Cell Volume Max Value Max Time 189 125 2
895990.00 14.9360 0.13 190 125 3
1393100.00 14.9180 0.16 188 125 1
629770.00 14.9150 0.11 181 120 1
2400.00 14.4770 1.08 183 122 1
5000.00 14.4430 1.09 184 123 1
5000.00 14.4430 1.09 179 118 1
2900.00 14.4330 1.22 180 119 1
2900.00 14.4290 1.10 1
1 1
614.25 14.4260 0.42 4
2 1
614.25 14.4260 0.42 15 10 1
614.25 14.4260 0.42 19 11 1
614.25 14.4260 0.42 185 124 1
627740.00 14.4260 0.09 2
1 2
614.25 14.4230 0.42 5
2 2
614.25 14.4230 0.42 16 10 2
614.25 14.4230 0.42 20 11 2
614.25 14.4230 0.42 10 5
1 56.25 14.4220 0.55 12 7
1 291.53 14.4220 0.55 77 47 3
514.50 14.4220 1.06 78 47 4
367.50 14.4220 1.06 Form 3.1-3 Rev. 2
Automated CALCULATION SHEET Page: B-2 I of B-26 Engineering Calc. No.:
Services Corp.
PBNP-994-21-10 Client: FP&L Energy Revision:
0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.
Title:
IELB Reconstitution Program Task 10-GOTHIC Pressure Analyses Reviewed By: CD Henry Safety Related Yes El No Eli Date: 11/12/2008 138 3
8 9
13 14 80 6
11 17 21 23 68 81 82 34 94 26 31 7
18 69 70 58 59 60 71 91 64 65 66 90 163 165 182 24 25 28 29 30 33 36 37 73 84 27 32 92 93 100 88 1
3 4
8 9
47 2
6 10 11 12 42 47 47 19 56 13 17 2
10 42 42 33 34 35 43 53 39 40 41 52 102 104 121 12 12 14 15 16 18 19 19 45 49 13 17 54 55 61 1257.30 921.38 1698.30 1698.30 1698.30 1792.60 2315.60 921.38 5404.20 921.38 921.38 1147.80 2400.00 698.25 498.75 1147.80 42982.00 1182.60 1182.60 241.31 241.31 2880.00 2160.00 2776.80 2844.50 2954.20 19199.00 1719.10 2954.20 2706.90 2706.90 10883.00 57058.00 59956.00 4000.00 1151.70 1407.70 1399.80 5589.70 543.38 522.11 1407.70 1151.70 14460.00 10874.00 1450.30 1450.30 1703.40 11245.00 14847.00 14.4210 14.4190 14.4190 14.4190 14.4190 14.4190 14.4190 14.4180 14.4180 14.4180 14.4180 14.4180 14.4180 14.4180 14.4180 14.4170:
14.4170 14.4160 14.4160 14.4150 14.4150 14.4140 14.4140 14.4120 14.4120 14.4120 14.4120 14.4120 14.4110 14.4110 14.4110 14.4110 14.4110 14.4110 14.4110 14.4100 14.4100 14.4100 14.4100 14.4100 14.4100 14.4100 14.4100 14.4100 14.4100 14.4090 14.4090 14.4090 14.4080 14.4070 1.00 0.42 0.55 0.55 0.55 0.55 1.03 0.42 0.55 0.42 0.42 0.42 0.74 1.06 1.06 0.42 1.01 0.42 0.42 0.42 0.42 0.74 0.74 0.74 0.74 0.74 0.74 0.74 0.89 0.89 0.89 0.74 1.00 1.00 0.55 0.42 0.42 0.50 0.50 0.50 0.50 0.42 0.42 0.89 0.67 0.42 0.42 0.89 0.89 0.17 Form 3.1-3 Rev. 2
Automated CALCULATION SHEET Page: B-3 of B-26 Engineering Calc. No.:
Services Corp.
PBNP-994-21 -10 Client: FP&L Energy Revision:
0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.
Title:
HELB Reconstitution Program Task 10-GOTHIC Pressure Analyses Reviewed By: CD Henry Safety Related Yes El No l'
Date: 11/12/2008 39 20 2
5096.00 14.4060 0.46 38 20 1
10400.00 14.4050 0.46 47 25 1
1947.70 14.4050 0.55 131 81 1
1422.00 14.4050 0.14 41 21 2
1947.70 14.4040 0.55 63 38 1
25676.00 14.4040 0.81 74 46 1
2172.70 14.4040 0.81 139 89 1
1070.10 14.4040 0.12 44 22 1
3138.80 14.4020 0.55 46 24 1
3138.80 14.4020 0.55 51 26 1
2771.50 14.4020 0.61 57 32 1
2771.50 14.4020 0.61 61 36 1
8107.80 14.4020 0.61 85 49 2
10270.00 14.4020 0.67 86 50 1
10874.00 14.4020 0.67 125 75 1
4334.30 14.4020 0.67 45 23 1
9063.00 14.4010 0.55 52 27 1
1512.00 14.4010 0.61 53 28 1
1054.80 14.4010 0.61 54 29 1
29469.00 14.4010 0.61 55 30 1
1135.80 14.4010 0.61 56 31 1
1512.00 14.4010 0.61 62 37 1
3010.20 14.4010 0.61 72 44 1
1659.40 14.4010 0.61 132 82 1
1419.30 14.4010 1.00 42 21 3
3392.80 14.4000 0.55 43 21 4
1876.90 14.4000 0.55 49 25 3
1876.90 14.4000 0.55 50 25 4
3392.80 14.4000 0.55 123 73 1
5110.70 14.4000 0.67 186 124 2
894670.00 14.4000 0.09 124 74 1
5060.50 14.3990 0.67 134 84 1
1292.50 14.3990 0.67 88 51 1
10874.00 14.3970 0.67 103 63 1
33120.00 14.3970 0.08 113 64 3
5620.90 14.3970 0.09 114 64 4
5620.90 14.3970 0.09 133 83 1
10478.00 14.3970 0.67 140 90 1
8612.50 14.3970 0.67 105 63 3
27600.00 14.3960 0.08 104 63 2
41760.00 14.3950 0.07 130 80 1
3947.40 14.3950 0.50 145 95 1
13442.00 14.3940 0.05 87 50 2
10270.00 14.3930 0.67 96 58 1
3024.00 14.3930 0.55 101 62 1
3024.00 14.3930 0.55 111 64 1
25758.00 14.3930 0.08 112 64 2
25758.00 14.3930 0.08 115 65 1
1216.30 14.3920 0.55 116 66 1
2214.70 14.3920 0.61 Form 3.1-3 Rev. 2
Automated CALCULATION SHEET Page: B3-4 of B-26 SEngineering Caic. No.:
Services Corp.
PBNP-994-2 1 -10 Client: FP&L Energy Revision:
0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.
Title:
HELB Reconstitution Program Task 10-GOTHIC Pressure Analy ses Reviewed By: CD Henry Safety Related Yes
[N]
No El Date: 11/12/2008 118 68 1
3951.10 14.3920 0.55 122 72 1
2214.70 14.3920 0.55 148 95 4
88754.00 14.3920 0.05 106 63 4
34800.00 14.3910 0.07 117 67 1
1038.80 14.3910 0.55 119 69 1
2625.90 14.3910 0.55 121 71 1
1507.10 14.3910 0.55 126 76 1
905.71 14.3910 0.55 128 78 1
905.71 14.3910 0.55 129 79 1
1038.80 14.3910 0.55 136 86 1
4558.20 14.3910 0.50 144 94 1
2023.40 14.3910 10.00 147 95 3
42461.00 14.3910 0.04 120 70 1
21941.00 14.3900 0.55 127 77 1
98439.00 14.3900 0.55 135 85 1
3517.70 14.3900 0.55 146 95 2
28097.00 14.3900 0.02 137 87 1
10100.00 14.3890 0.55 142 92 1
7670.00 14.3890 0.55 143 93 1
1778.40 14.3890 0.55 89 51 2
10270.00 14.3880 0.67 97 58 2
4368.00 14.3880 0.55 102 62 2
4368.00 14.3870 0.55 141 91 1
9934.60 14.3870 0.55 157 96 1
4031.80 14.3870 0.21 160 99 1
1169.60 14.3830 10.00 195 130 1
1000000.00 14.3810 10.00 159 98 1
5936.10 14.3800 0.17 161 100 1
1251.60 14.3800 10.00 83 48 1
8654.10 14.3790 10.00 95 57 1
13874.00 14.3780 10.00 169 108 1
258090.00 14.3780 0.34 191 126 1
1000000.00 14.3780 10.00 98 59 1
9999.00 14.3770 10.00 99 60 1
9999.00 14.3770 10.00 164 103 1
59208.00 14.3770 0.17 192 127 1
1000000.00 14.3770 2.16 196 131 1
1000000.00 14.3760 5.89 22 12 1
939.09 14.3750 0.00 35 19 2
939.09 14.3750 0.00 40 21 1
3520.80 14.3750 0.00 48 25 2
3520.80 14.3750 0.00 67 42 1
3200.00 14.3750 0.00 75 47 1
2388.80 14.3750 0.00 76 47 2
1706.30 14.3750 0.00 79 47 5
3241.90 14.3750 0.00 107 63 5
34362.00 14.3750 0.00 108 63 6
43326.00 14.3750 0.00 109 63 7
28635.00 14.3750 0.00 110 63 8
36105.00 14.3750 0.00 Form 3.1-3 Rv Rev. 2
AIM Automated CALCULATION SHEET Page: B-5 of B-26 I
Engineering Cale. No.:
Services Corp.
PBNP-994-2 1-10 Client: FP&L Energy Revision:
0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.
Title:
HELB Reconstitution Program Task 10-GOTHIC Pressure Analyses Reviewed By: CD Henry Safety Related Yes El No 0
Date: 11/12/2008 149 95 5
21609.00 14.3750 0.00 150 95 6
45170.00 14.3750 0.00 151 95 7
27892.00 14.3750 0.00 152 95 8
58302.00 14.3750 0.00 153 95 9
88106.00 14.3750 0.00 154 95 10 184160.00 14.3750 0.00 155 95 11 44840.00 14.3750 0.00 156
- 95.
12 93727.00 14.3750 0.00 158 97 1
5021.10 14.3750 1.00 162 101 1
38741.00 14.3750 0.02 166 105 1
41586.00 14.3750 0.10 167 106 1
97427.00 14.3750 0.00 168 107 1
258090.00 14.3750 0.16 170 109 1
1000000000.00 14.3750 10.00 171 110 1
1000000000.00 14.3750 10.00 172 111 1
1000000000.00 14.3750 10.00 173 112 1
1000000000.00 14.3750 10.00 174 113 1
1000000000.00 14.3750 10.00 175 114 1
1000000000.00 14.3750 10.00 176 115 1
1000000000.00 14.3750 10.00 177 116 1
1000000000.00 14.3750 10.00 178 117 1
1000000000.00 14.3750 10.00 187 124 3
1396400.00 14.3750 0.00 193 128 1
1000000.00 14.3750 10.00 194 129 1
1000000.00 14.3750 10.00 197 132 1
1000000.00 14.3750 10.00 B.2 PB-PAB-301_P Max Pressure Filename Cell Vol L Cell Volume Max Value Max Time 198 133 1
2025000.00 14.9840 1.06 199 134 1
3931000.00 14.9250 1.18 181 120 1
2400.00 14.4780 1.08 183 122 1
5000.00 14.4440 1.09 184 123 1
5000.00 14.4440 1.09 179 118 1
2900.00 14.4350 1.22 180 119 1
2900.00 14.4280 1.10 1
1 1
614.25 14.4260 0.40 4
2 1
614.25 14.4260 0.40 15 10 1
614.25 14.4260 0.44 19 11 1
614.25 14.4260 0.44 185 124 1
627740.00 14.4260 0.09 188 125 1
629770.00 14.4260 0.09 77 47 3
514.50 14.4250 1.06 Form 3.1-3 Rev. 2
Automated CALCULATION SHEET Page: B-6 of B-26 Engineering Calc. No.:
Services Corp.
PBNP-994-21-10 Client: FP&L Energy Revision:
0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Cale.
Title:
HELB Reconstitution Program Task 10-GOTHIC Pressure Analyses Reviewed By: CD Henry Safety Related Yes Nl No EL Date: 11/12/2008 78 2
5 12 16 20 10 80 81 82 138 94 8
9 13 14 68 3
6 11 17 21 23 34 26 31 7
18 69 70 60 58 59 64 65 66 71 90 91 163 165 73 182 24 25 28 29 30 33 36 47 1
2 7
10 11 5
47 47 47 88 56 3
4 8
9 42 1
2 6
10 11 12 19 13 17 2
10 42 42 35 33 34 39 40 41 43 52 53 102 104 45 121 12 12 14 15 16 18 19 367.50 614.25 614.25 291.53 614.25 614.25 56.25 2315.60 698.25 498.75 1257.30 42982.00 1698.30 1698.30 1698.30 1792.60 2400.00 921.38 921.38 5404.20 921.38 921.38 1147.80 1147.80 1182.60 1182.60 241.31 241.31 2880.00 2160.00 2954.20 2776.80 2844.50 2954.20 2706.90 2706.90 19199.00 10883.00 1719.10 57058.00 59956.00 14460.00 4000.00 1151.70 1407.70 1399.80 5589.70 543.38 522.11 1407.70 14.4250 14.4230 14.4230 14.4220 14.4220 14.4220 14.4210 14.4210 14.4210 14.4210 14.4210 14.4200 14,4190 14.4190 14.4190 14.4190 14.4190 14.4180 14.4180 14.4180 14.4180 14.4180 14.4170 14.4170 14.4160 14.4160 14.4150 14.4150 14.4150 14.4140 14.4130 14.4120 14.4120 14.4120 14.4120 14.4120 14.4120 14.4120 14.4120 14.4120 14.4120 14.4110 14.4110 14.4100 14.4100 14.4100 14.4100 14.4100 14.4100 14.4100 1.06 0.40 0.40 0.54 0.44 0.44 0.54 1.03 1.06 1.06 1.00 1.01 0.59 0.59 0.59
- 0. 59 0.78 0.40 0.40 0.54 0.44 0.44 0.40 0.44 0.40 0.44 0.40 0.44 0.78 0.78 0.76 0.76 0.76 0.90 0.90 0.90 0.76 0.76 0.76 1.00 1.00 0.93 0.54 0.40 0.40 0.54 0.54 0.54 0.54 0.44 Form 3.1-3 Rev. 2
Automated CALCULATION SHEET Page: B-7 of B-26 ZI Engineering Cale. No.:
Services Corp.
PBNP-994-2 1 -10 Client: FP&L Energy Revision:. 0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Cale.
Title:
HELB Reconstitution Program Task 10O-GOTHI C Pressure Analyses Reviewed By: CD Henry_
Safety Related Yes
[K]
No D Date: 11/12/2008 37 19 4
1151.70 14.4100 0.44 84 49 1
10874.00 14.4100 0.65 92 54 1
1703.40 14.4100 0.93 93 55 1
11245.00 14.4100 0.93 27 13 2
1450.30 14.4090 0.40 32 17 2
1450.30 14.4090 0.44 100 61 1
14847.00 14.4070 0.18 39 20 2
5096.00 14.4060 0.44 38 20 1
10400.00 14.4050 0.44 47 25 1
1947.70 14.4050 0.54 131 81 1
1422.00 14.4050 0.13 4.1 21 2
1947.70 14.4040 0.59 63 38 1
25676.00 14.4040 0.83 74 46 1
2172.70 14.4040 0.85 139 89 1
1070.10 14.4040 0.12 44 22 1
3138-.S0 14.4020 0.54 46 24 1
3138.80 14.4020 0.54 51 26 1
2771.50 14.4020 0.59 57 32 1
2771.50 14.4020 0.59 61 36 1
8107.80 14.4020 0.59 86 50 1
10874.00 14.4020 0.65 45 23 1
9063.00 14.4010 0.54 52 27 1
1512.00 14.4010 0.59 53 28 1
1054.80 14.4010 0.59 54 29 1
29469.00 14.4010 0.59 55 30 1
1135.80 14.4010 0.59 56 31 1
1512.00 14.4010 0.65 62 37 1
3010.20 14.4010 0.59 72 44 1
1659.40 14.4010 0.59 85 49 2
10270.00 14.4010 0.65 125 75 1
4334.30 14.4010 0.72 42 21 3
3392.80 14.4000 0.54 43 21 4
1876.90 14.4000 0.54 49 25 3
1876.90 14.4000 0.54 50 25 4
3392.80 14.4000 0.54 132 82 1
1419.30 14.4000 1.00 186 124 2
894670.00 14.4000 0.09 123 73 1
5110.70 14.3990 0.65 124 74 1
5060.50 14.3990 0.65 134 84 1
1292.50 14.3990 0.65 189 125 2
895990.00 14.3990 0.09 88 51 1
10874.00 14.3970 0.65 103 63 1
33120.00 14.3970 0.08 113 64 3
5620.90 14.3970 0.09 114 64 4
5620.90 14.3970 0.09 133 83 1
10478.00 14.3970 0.65 140 90 1
8612.50 14.3970 0.65 105 63 3
27600.00 14.3960 0.08 104 63 2
41760.00 14.3950 0.07 130 80 1
3947.40 14.3940 0.49 Form 3.1-3 Rv Rev. 2
Automated CALCULATION SHEET Page: B3-8 of B-26 SEngineering Caic. No.:
Services Corp.
PBNP-994-2 1 -10 Client: FP&L Energy Revision:
0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.
Title:
HELB Reconstitution Program Task 10-GOTHIC Pressure Analyses Reviewed By: CD Henry Safety Related Yes El1 No ED Date: 11/12/2008 145 95 1
13442.00 14.3940 0.05 87 50 2
10270.00 14.3930 0.65 96 58 1
3024.00 14.3930 0.59 101 62 1
3024.00 14.3930 0.59 ill 64 1
25758.00 14.3930 0.08 112 64 2
25758.00 14.390 0.08 115 65 1
1216.30 14.3920 0.54 116 66 1
2214.70 14.3920 0.59 122 72 1
2214.70 14.3920 0.54 148 95 4
88754.00 14.3920 0.05 106 63 4
34800.00 14.3910 0.07 117 67 1
1038.80 14.3910 0.59 118 68 1
3951.10 14.3910 0.54 119 69 1
2625.90 14.3910 0.54 121 71 1
1507.10 14.3910 0.54 126 76 1
905.71 14.3910 0.59 128 78 1
905.71 14.3910 0.59 129 79 1
1038.80 14.3910 0.59 136 86 1
4558.20 14.3910 0.54 144 94 1
2023.40 14.3910 10.00 147 95 3
42461.00 14.3910 0.04 120 70 1
21941.00 14.3900 0.54 127 77 1
98439.00 14.3900 0.59 135 85 1
3517.70 14.3900 0.59 146 95 2
28097.00 14.3900 0.02 137 87 1
10100.00 14.3890 0.54 142 92 1
70.014.3890 0.54 143 93 1
1778.40 14.3890 0.54 89 51 2
10270.00 14.3880 0.65 97 58 2
4368.00 14.3870 0.59 102 62 2
4368.00 14.3870 0.59 141 91 1
9934.60 14.3870 0.54 157 96 1
4031.80 14.3870 0.22 160 99 1
1169.60 14.3830 10.00 195 130 1
1000000.00 14.3810 10.00 159 98 1
5936.10 14.3800 0.16 161 100 1
1251.60 14.3800 10.00 83 48 1
8654.10 14.3790 10.00 95 57 1
13874.00 14.3780 10.00 191 126 1
1000000.00 14.3780 10.00 98 59 1
9999.00 14.3770 10.00 99 60 1
9999.00 14.3770 10.00 164 103 1
59208.00 14.3770 0.18 192 127 1
1000000.00 14.3770 2.16 196 131 1
1000000.00 14.3760 5.45 22 12 1
939.09 14.3750 0.00 35 19 2
939.09 14.3750 0.00 40 21 1
3520.80 14.3750 0.00 48 25 2
3520.80 14.3750 0.00 67 42 1
3200.00 14.3750 0.00 Form 3.1-3 Rv Rev. 2
/ Automated CALCULATION SHEET Page: 13B-9 of B-26 Engineering Caic. No.:
Services Corp.
PBNP-994-2 1-10 Client: FP&L Energy Revision:
0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.
Title:
HELB Reconstitution Program Task I 0-GOTHIC Pressure Analyses Reviewed By: CD Henry Safety Related Yes
[I]
No Eli Date: 11/12/2008 75 47 1
2388.80 14.3750 0.00 76 47 2
1706.30 14.3750 0.00 79 47 5
3241.90 14.3750 0.00 107 63 5
34362.00 14.3750 0.00 108 63 6
43326.00 14.3750 0.00 109 63 7
28635.00 14.3750 0.00 110 63 8
36105.00 14.3750 0.00 149 95 5
21609.00 14.3750 0.00 150 95 6
45170.00 14.3750 0.00 151 95 7
27892.00 14.3750 0.00 152 95 8
58302.00 14.3750 0.00 153 95 9
88106.00 14.3750 0.00 154 95 10 184160.00 14.3750 0.00 155 95 11 44840.00 14.3750 0.00 156 95 12 93727.00 14.3750 0.00 158 97 1
5021.10 14.3750 1.00 162 101 1
38741.00 14.3750 0.01 166 105 1
41586.00 14.3750 0.09 167 106 1
97427.00 14.3750 0.00 168 107 1
258090.00 14.3750 0.00 169 108 1
258090.00 14.3750 0.00 170 109 1
1000000000.00 14.3750 10.00 171 110 1
1000000000.00 14.3750 10.00 172 111 1
1000000000.00 14.3750 10.00 173 112 1
1000000000.00 14.3750 10.00 174 113 1
1000000000.00 14.3750 10.00 175 114 1
1000000000.00 14.3750 10.00 176 115 1
1000000000.00 14.3750 10.00 177 116 1
1000000000.00 14.3750 10.00 178 117 1
1000000000.00 14.3750 10.00 187 124 3
1396400.00 14.3750 0.00 190 125 3
1393100.00 14.3750 0.00 193 128 1
1000000.00 14.3750 10.00 194 129 1
1000000.00 14.3750 10.00 197 132 1
1000000.00 14.3750 10.00 Form 3.1-3 Rev. 2
Automated CALCULATION SHEET Page: B-10 of B-26 Engineering Calc. No.:
Services Corp.
PBNP-994-2 1-10 Client: FP&L Energy Revision:
0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.
Title:
HELB Reconstitution Program Task 10-GOTHIC. Pressure Analyses Reviewed By: CD Henry Safety Related Yes El No D
Date: 11/12/2008 B.3 PB-PAB-140_P Max Pressure Filename Cell Vol L Cell 47 5o 49 181 12 10 1
4 15 19 8
9 11 13 14 183 184 2
5 16 20 3
6 17 21 28 29 30 33 182 23 26 31 34 7
18 179 41 68 77 78 57 25 25 25 120 7
5 1
2 10 11 3
4 6
8 9
122 123 1
2 10 11 1
2 10 11 14 15 16 18 121 12 13 17 19 2
10 118 21 42 47 47 32 Volume 1947.70 3392.80 1876.90 2400.00 291.53 56.25 614.25 614.25 614.25 614.25 1698.30 1698.30 5404.20 1698.30 1792.60 5000.00 5000.00 614.25 614.25 614.25 614.25 921.38 921.38 921.38 921.38 1399.80 5589.70 543.38 522.11 4000.00 1147.80 1182.60 1182.60 1147.80 241.31 241.31 2900.00 1947.70 2400.00 514.50 367.50 2771.50 Max Value 14.5100
- 14. 5100 14.5060 14.4830 14.4480 14.4470 14.4450 14.4450 14.4450 14.4450 14.4440 14.4440 14.4440 14.4440 14.4440 14.4430 14.4430 14.4410 14.4410 14.4410 14.4410 14.4370 14.4370 14.4370 14.4370 14.4370 14.4370 14.4370 14.4370 14.4370 14.4360 14.4360 14.4360 14.4360 14.4340 14.4340 14.4330 14.4320 14.4320 14.4320 14.4320 14.4310 Max Time 0.12 0.13 0.12 1.08 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 1.09 1.09 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 1.22 10.00 10.00 0.96 0.96 10.00 Form 3.1-3 Rev. 2
{Automated CALCULATION SHEET Page:
11I of B-26 jJ/jL Engineering Cale. No.:
Services Corp.
PBNP-994-2 1-10 Client: FP&L Energy Revision:
0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Cale.
Title:
HELB Reconstitution Program Task 10-GOTHIC Pressure Analyses Reviewed By: CD Henry Safety Related Yes El No ED Date: 11/12/2008 51 26 1
2771.50 14.4300 10.00 61 36 1
8107.80 14.4300 10.00 62 37 1
3010.20 14.4300 10.00 72 44 1
1659.40 14.4300 10.00 24 12 3
1151.70 14.4290 10.00 25 12 4
1407.70 14.4290 10.00 27 13 2
1450.30 1.2010.00 32 17 2
1450.30 14.4290 10.00 36 19 3
1407.70 14.4290 10.00 37 19 4
1151.70 14.4290 10.00 38 20 1
10400.00 14.4290 10.00 39 20
.2 5096.00 14.4290 10.00 44 22 1
3138.80 14.4290 10.00 45 23 1
9063.00 14.4290 10.00 46 24 1
3138.80 14.4290 10.00 52 27 1
1512.00 14.4290 10.00 53 28 1
1054.80 14.4290 10.00 54 29 1
29469.00 14.4290 10.00 55 30 1
1135.80 14.4290 10.00 56 31 1
1512.00 14.4290 10.00 58 33 1
2776.80 14.4290 10.00 59 34 1
2844.50 14.4290 10.00 60 35 1
2954.20 14.4290 10.00 63 38 1
25676.00 14.4290 10.00 64 39 1
2954.20 14.4290 10.00 65 40 1
2706.90 14.4290 10.00 66 41 1
2706.90 14.4290 10.00 71 43 1
19199.00 14.4290 10.00 73 45 1
14460.00 14.4290 10.00 74 46 1
2172.70 14.4290 10.00 80 47 6
2315.60 14.4290 0.96 90 52 1
10883.00 14.4290 10.00 91 53 1
1719.10 14.4290 10.00 92 54 1
1703.40 14.4290 10.00 93 55 1
11245.00 14.4290 10.00 180 119 1
2900.00 14.4290 1.10 42 21 3
3392.80 14.4280 10.00 43 21 4
1876.90 14.4280 10.00 81 47 7
698.25 14.4280 0.96 82 47 8
498.75 14.4280 0.96 84 49 1
10874.00 14.4280 10.00 86 50 1
10874.00 14.4280 10.00 88 51 1.
10874.00 14.4280 10.00 94 56 1
42982.00 14.4280 10.00 69 42 3
2880.00 14.4270 10.00 70 42 4
2160.00 14.4270 10.00 185 124 1
627740.00 14.4260 0.09 188 125 1
629770.00 14.4250 0.09 96 58 1
3024.00 14.4220 10.00 101 62 1
3024.00 14.4220 10.00 Form 3.1-3 Rv Rev. 2
Automated CALCULATION SHEET Page: B-12 of B-26 Engineering Calc. No.:
Services Corp.
PBNP-994-21 -10 Client: FP&L Energy Revision:
0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.
Title:
HELB Reconstitution Program Task 10-GOTHIC Pressure Analyses Reviewed By: CD Henry Safety Related Yes El]
No El Date: 11/12/2008 138 88 1
1257.30 14.4210 1.00 85 49 2
10270.00 14.4200 10.00 87 50 2
10270.00 14.4200 10.00 115 65 1
1216.30 14.4200 10.00 116 66 1
2214.70 14.4200 10.00 117 67 1
1038.80 14.4200 10.00 118 68 1
3951.10 14.4200 10.00 119 69 1
2625.90 14.4200 10.00 120 70 1
21941.00 14.4200 10.00 121 71 1
1507.10 14.4200 10.00 122 72 1
2214.70 14.4200 10.00 124 74 1
5060.50 14.4200 10.00 125 75 1
4334.30 14.4200 10.00 126 76 1
905.71 14.4200 10.00 127 77 1
98439.00 14.4200 10.00 128 78 I
905.71 14.4200 10.00 129 79 1
1038.80 14.4200 10.00 130 80 1
3947.40 14.4200 10.00 135 85 1
3517.70 14.4200 10.00 136 86 1
4558.20 14.4200 10.00 137 87 1
10100.00 14.4200 10.00 89 51 2
10270.00 14.4190 10.00 123 73 1
5110.70 14.4190 10.00 133 83 1
10478.00 14.4190 10.00 134 84 1
1292.50 14.4190 10.00 140 90 1
8612.50 14.4190 10.00 141 91 1
9934.60 14.4190 10.00 142 92 1
7670.00 14.4190 10.00 143 93 1
1778.40 14.4190 10.00 100 61 1
14847.00 14.4180 10.00 97 58 2
4368.00 14.4170 10.00 102 62 2
4368.00 14.4170 10.00 111 64 1
25758.00 14.4140 10.00 112 64 2
25758.00 14.4140 10.00 113 64 3
5620.90 14.4140 10.00 114 64 4
5620.90 14.4140 10.00 103 63 1
33120.00 14.4130 10.00 104 63 2
41760.00 14.4130 10.00 105 63 3
27600.00 14.4130 10.00 106 63 4
34800.00 14.4130 10.00 163 102 1
57058.00 14.4110 1.00 165 104 1
59956.00 14.4110 1.00 192 127 1
1000000.00 14.4110 10.00 145 95 1
13442.00 14.4090 10.00 146 95 2
28097.00 14.4090 10.00 147 95 3
42461.00 14.4090 10.00 148 95 4
88754.00 14.4090 10.00 157 96 1
4031.80 14.4090 10.00 159 98 1
5936.10 14.4090 10.00 131 81 1
1422.00 14.4050 0.13 Form 3.1-3 Rev. 2
Automated CALCULATION SHEET Page: B-13 of B-26 Z
j Engineering Calc. No.:
Services Corp.
PBNP-994-21-10 Client: FP&L Energy Revision:
0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.
Title:
HELB Reconstitution Program Task 10-GOTHIC Pressure Analyses Reviewed By: CD Henry Safety Related Yes El No D]
Date: 11/12/2008 139 89 1
1070.10 14.4040 0.12 132 82 1
1419.30 14.4010 1.00 186 124 2
894670.00 14.4000 0.09 189 125 2
895990.00 14.3990 0.09 196 131 1
1000000.00 14.3990 10.00 164 103 1
59208.00 14.3980 10.00 107 63 5
34362.00 14.3930 10.00 108 63 6
43326.00 14.3930 10.00 109 63 7
28635.00 14.3930 10.00 110 63 8
36105.00 14.3930 10.00 151 95 7
27892.00 14.3930 10.00 152 95 8
58302.00 14.3930 10.00 153 95 9
88106.00 14.3930 10.00 154 95 10 184160.00 14.3930 10.00
_155 95 11 44840.00 14.3930 10.00 156 95 12 93727.00 14.3930 10.00 167 106 1
97427.00 14.3930 10.00 144 94 1
2023.40 14.3910 10.00 160 99 1
1169.60 14.3830 10.00 195 130 1
1000000.00 14.3810 10.00 161 100 1
1251.60 14.3800 10.00 83 48 1
8654.10 14.3790 10.00 95 57 1
13874.00 14.3780 10.00 191 126 1
1000000.00 14.3780 10.00 98 59 1
9999.00 14.3770 10.00 99 60 1
9999.00 14.3770 10.00 22 12 1
939.09 14.3750 0.00 35 19 2
939.09 14.3750 0.00 40 21 1
3520.80 14.3750 0.00 48 25 2
3520.80 14.3750 0.00 67 42 1
3200.00 14.3750 0.00 75 47 1
2388.80 14.3750 0.00 76 47 2
1706.30 14.3750 0.00 79 47 5
3241.90 14.3750 0.00 149 95 5
21609.00 14.3750 0.00 150 95 6
45170.00 14.3750 0.00 158 97 1
5021.10 14.3750 1.00 162 101 1
38741.00 14.3750 0.02 166 105 1
41586.00 14.3750 0.10 168 107 1
258090.00 14.3750 0.01 169 108 1
258090.00 14.3750 0.00 170 109 1
1000000000.00 14.3750 10.00 171 110 1
1000000000.00 14.3750 10.00 172 111 1
1000000000.00 14.3750 10.00 173 112 1
1000000000.00 14.3750 10.00 174 113 1
1000000000.00 14.3750 10.00 175 114 1
1000000000.00 14.3750 10.00 176 115 1
1000000000.00 14.3750 10.00 177 116 1
1000000000.00 14.3750 10.00 178 117 1
1000000000.00 14.3750 10.00 Form 3.1-3 Rev. 2
Automated CALCULATION SHEET Page: B-14 of B-26 z
Engineering Calc. No.:
Services Corp.
PBNP-994-2 1-10 Client: FP&L Energy Revision:
0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Cale.
Title:
HELB Reconstitution Program Task 10-GOTHIC Pressure Analyses Reviewed By: CD Henry Safety Related Yes El]
No D
Date: 11/12/2008 187 124 3
1396400.00 14.3750 0.00 190 125 3
1393100.00 14.3750 0.00 193 128 1
1000000.00 14.3750 10.00 194 129 1
1000000.00 14.3750 10.00 197 132 1
1000000.00 14.3750 10.00 B.4 PB-PAB-237_P Max Pressure Filename Cell Vol L Cell Volume Max Value Max Time 16-4 103 1
59208.00 14.8370 1.27 196 131 1
1000000.00 14.5320 10.00 181 120 1
2400.00 14.4770 1.08 12 7
1 291.53 14.4550 10.00 10 5
1 56.25 14.4540 10.00 1
1 1
614.25 14.4510 10.00 4
2 1
614.25 14.4510 10.00 15 10 1
614.25 14.4510 10.00 19 11 1
614.25 14.4510 10.00 8
3
.1 1698.30 14.4500 10.00 9
4 1
1698.30 14.4500 10.00 11 6
1 5404.20 14.4500 10.00 13 8
1 1698.30 14.4500 10.00 14 9
1 1792.60 14.4500 10.00 2
1 2
614.25 14.4480 10.00 5
2 2
614.25 14.4480 10.00 16 10 2
614.25 14.4480 10.00 20 11 2
614.25 14.4480 10.00 3
1 3
921.38 14.4440 10.00 6
2 3
921.38 14.4440 10.00 17 10 3
921.38 14.4440 10.00 21 11 3'
921.38 14.4440 10.00 28 14 1
1399.80 14.4440 10.00 29 15 1
5589.70 14.4440 10.00 30 16 1
543.38 14.4440 10.00 33 18 1
522.11 14.4440 10.00 182 121 1
4000.00 14.4440 10.00 23 12 2
1147.80 14.4430 10.00 26 13 1
1182.60 14.4430 10.00 31 17 1
1182.60 14.4430 10.00 34 19 1
1147.80 14.4430 10.00 183 122 1
5000.00 14.4430 1.09 184 123 1
5000.00 14.4430 1.09 7
2 4
241.31 14.4400 10.00 18 10 4
241.31 14.4400 10.00 Form 3.1-3 Rev. 2 Form 3.1-3 Rev. 2
Automated CALCULATION SHEET Page: B-15 1of B-26 SEngineering Calc. No.:
Z -L
ý Services Corp.
PBNP-994-2 1-10 Client: FP&L Energy Revision:
0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Cale.
Title:
14ELB Reconstitution Program Task 10-GOTHIC Pressure Analyses Reviewed By: CD Henry Safety Related Yes El No ED Date: 11/12/2008 41 47 68 77 78 51 57 24 25 27 32 36 37 38 39 44 45 46 52 53 54 55 56 58 59 60 61 62 63 64 65 66 71 72 73 74 90 91 92 93 94 84 86 88 42 43 49 50 69 70 21 25 42 47 47 26 32 12 12 13 17 19 19 20
.20 22 23 24 27 28 29 30 31 33 34 35 36 37 38 39 40 41 43 44 45 46 52 53 54 55 56 49 50 51 21 21 25 25 42 42 1947.70 1947.70 2400.00 514.50 367.50 2771.50 2771.50 1151.70 1407.70 1450.30 1450.30 1407.70 1151.70 10400.00 5096.00 3138.80 9063.00 3138.80 1512.00 1054.80 29469.00 1135.80 1512.00 2776.80 2844.50 2954.20 8107.80 3010.20 25676.00 2954.20 2706.90 2706.90 19199.00 1659.40 14460.00 2172.70 10883.00 1719.10 1703.40 11245.00 42982.00 10874.00 10874.00 10874.00 3392.80 1876.90 1876.90 3392.80 2880.00 2160.00 14.4390 14.4390 14.4390 14.4380 14.4380 14.43 70 14.43 70 14.4360 14.4360 14.4360 14.4360 14.4360 14.4360 14.4360 14.4360 14.4360 14.4360 14.4360 14.4360 14.4360 14.4360 14.4360 14.4360 14.4360 14.4360 14.4360 14.4360 14.4360 14.4360 14.4360 14.4360 14.4360 14.4360 14.4360 14.4360 14.4360 14.4360 14.4360 14.4360 14.4360 14.4360
- 14. 4350
- 14. 4350
- 14. 4350 14.4340 14.4340 14.4340 14.4340 14.4340 14.4340 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10-. 00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 Form 3.1-3 Rv Rev. 2
Automated I CALCULATION SHEET Page: B3-16 1of B-26 j/j ~
Engineering Cale. No.:
Services Corp._
PBNP-994-2 1 -10 Client: FP&L Energy Revision:
0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Cale.
Title:
HELB Reconstitution Program Task 10-GOTHIC Pressure Analyses Reviewed By: CD Henry Safety Related Yes El1 No 0I Date: 11/12/2008 80 47 6
2315.60 14.4340 10.00 81 47 7
698.25 14.4340 10.00 82 47 8
498.75 14.4340 10.00 179 118 1
2900.00 14.4330 1.22 96 58 1
3024.00 14.4290 10.00 101 62 1
3024.00 14.4290 10.00 180 119 1
2900.00 14.4290 1.10 85 49 2
10270.00 14.4270 10.00 87 50 2
10270.00 14.4270 10.00 89 51 2
10270.00 14.4270 10.00 115 65 1
1216.30 14.4270 10.00 116 66 1
2214.70 14.4270 10.00 118 68 13951.10 14.4270 10.00 119 69 1
2625.90 14.4270 10.00 121 71 1
1507.10 14.4270 10.00 122 72 1
2214.70 14.4270 10.00 124 74 1
5060.50 14.4270 10.00 125 75 1
4334.30 14.4270 10.00 126 76 1
905.71 14.4270 10.00 128 78 1
905.71 14.4270 10.00 130 80 1
3947.40 14.4270 10.00 135 85 1
3517.70 14.4270 10.00 136 86 1
4558.20 14.4270 10.00 137 87 1
10100.00 14.4270 10.00 100 61 1
14847.00 14.4260 10.00 117 67 1
1038.80 14.4260 10.00 120 70 1
21941.00 14.4260 10.00 123 73 1
5110.70 14.4260 10.00 127 77 1
98439.00 14.4260 10.00 129 79 1
1038.80 14.4260 10.00 133 83 1
10478.00 14.4260 10.00 134 84 1
1292.50 14.4260 10.00 140 90 1
8612.50 14.4260 10.00 141 91 1
9934.60 14.4260 10.00 142 92 1
7670.00 14.4260 10.00 143 93 1
1778.40 14.4260 10.00 185 124 1
627740.00 14.4260 0.09 188 125 1
629770.00 14.4250 0.09 97 58 2
4368.00 14.4230 10.00 102 62 2
4368.00 14.4230 10.00 ill 64 1
25758.00 14.4220 10.00 112 64 2
25758.00 14.4220 10.00 113 64 3
5620.90 14.4220 10.00 114 64 4
5620.90 14.4220 10.00 103 63 1
33120.00 14.4210 10.00 104 63 2
41760.00 14.4210 10.00 105 63 3
27600.00 14.4210 10.00 106 63 4
34800.00 14.4210 10.00 138 88 1
1257.30 14.4210
.1.00 192 127 1
1000000.00 14.4180 10.00 Form 3.1-3 Rv Rev. 2
Automated CALCULATION SHEET Page: B-17 of B-26 f ~ Engineering Cale. No.:
Services Corp.
PBNP-994-21 1-10 Client: FP&L Energy Revision:
0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Caic.
Title:
HELB Reconstitution Program Task 10-GOTHIC Pressure Analyses Reviewed By: CD Henry Safety Related Yes No LZDate:
11/12/2008 145 95 1
13442.00 14.4170 10.00 157 96 1
4031.80 14.4170 10.00 159 98 1
5936.10 14.4170 10.00 146 95 2
28097.00 14.4160 10.00 147 95 3
42461.00 14.4160 10.00 148 95 4
88754.00 14.4160 10.00 163 102 1
57058.00 14.4110 1.00 165 104 1
59956.00 14.4110 1.00 131 81 1
1422.00 14.4050 0.13 139 89 1
1070.10 14.4040 0.12 107 63 5
34362.00 14.4010 10.00
.108 63 6
43326.00 14.4010 10.00 109 63 7
28635.00 14.4010 10.00 110 63 8
36105.00 14.4010 10.00 132 82 1
1419.30 14.4010 1.00 151 95 7
2-7892.00 14.4010 10.00 152 95 8
58302.00 14.4010 10.00 153 95 9
88106.00 14.4010 10.00 154 95 10 184160.00 14.4010 10.00 155 95 11 44840.00 14.4010 10.00 156 95 12 93727.00 14.4010 10.00 167 106 1
97427.00 14.4010 10.00 186 124 2
894670.00 14.4000 0.09 189 125 2
895990.00 14.3990 0.09 144 94 1
2023.40 14.3910 10.00 160 99 1
1169.60 14.3830 10.00 195 130 1
1000000.00 14.3810 10.00 161 100 1
1251.60 14.3800 10.00 83 48 1
8654.10 14.3790 10.00 95 57 1
13874.00 14.3780 10.00 191 126 1
1000000.00 14.3780 10.00 98 59 1
9999.00 14.3770 10.00 99 60 1
9999.00 14.3770 10.00 22 12 1
939.09 14.3750 0.00 35 19 2
939.09 14.3750 0.00 40 21 1
3520.80 14.3750 0.00 48 25 2
3520.80 14.3750 0.00 67 42 1
3200.00 14.3750 0.00 75 47 1
2388.80 14.3750 0.00 76 47 2
1706.30 14.3750 0.00 79 47 5
3241.90 14.3750 0.00 149 95 5
21609.00 14.3750 0.00 150 95 6
45170.00 14.3750 0.00 158 97 1
5021.10 14.3750 1.00 162 101 1
38741.00 14.3750 0.02 166 105 1
41586.00 14.3750 0.10 168 107 1
258090.00 14.3750 0.01 169 108 1
289.014.3750 0.00 170 109 1 1000000000.00 14.3750 10.00 171 110 1 1000000000.00 14.3750 10.00 Form 3.1-3 Rv Rev. 2
Automated CALCULATION SHEET Page: B-18 of B-26 Z
Engineering Calc. No.:
Services Corp.
PBNP-994-2 1-] 0 Client: FP&L Energy Revision:
0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.
Title:
HELB Reconstitution Program Task 10-GOTHIC Pressure Analyses Reviewed By: CD Henry Safety Related Yes El No D
Date: 11/12/2008 172 111 1
1000000000.00 14.3750 10.00 173 112 1
1000000000.00 14.3750 10.00 174 113 1
1000000000.00 14.3750 10.00 175 114 1
1000000000.00 14.3750 10.00 176 115 1
1000000000.00 14.3750 10.00 177 116 1
1000000000.00 14.3750 10.00 178 117 1
1000000000.00 14.3750 10.00 187 124 3
1396400.00 14.3750 0.00 190 125 3
1393100.00 14.3750 0.00 193 128 1
1000000.00 14.3750 10.00 194 129 1
1000000.00 14.3750 10.00 197 132 1
1000000.00 14.3750 10.00 B.5 PB-PAB-271_P Max Pressure Filename Cell Vol L Cell Volume Max Value Max Time 181 120 1
2400.00 14.4790 1.08 183 122 1
5000.00 14.4430 1.09 184 123 1
5000.00 14.4430 1.09 179 118 1
2900.00 14.4330 1.22 180 119 1
2900.00 14.4290 1.10 1
1 1
614.25 14.4260 0.40 4
2 1
614.25 14.4260 0.40 15 10 1
614.25 14.4260 0.44 19 11 1
614.25 14.4260 0.44 185 124 1
627740.00 14.4260 0.09 188 125 1
629770.00 14.4250 0.09 2
1 2
614.25 14.4230 0.40 5
2 2
614.25 14.4230 0.40 12 7
1 291.53 14.4230 0.59 16 10 2
614.25 14.4230 0.44 20 11 2
614.25 14.4230 0.44 77 47 3
514.50 14.4230 1.06 78 47 4
367.50 14.4230 1.06 10 5
1 56.25 14.4220 0.59 138 88 1
1257.30 14.4210 1.00 8
3 1
1698.30 14.4200 0.59 9
4 1
1698.30 14.4200 0.59 13 8
1 1698.30 14.4200 0.59 14 9
1 1792.60 14.4200 0.59 80 47 6
2315.60 14.4200 1.03 82 47 8
498.75 14.4200 1.06 81 47 7
698.25 14.4190 1.06 3
1 3
921.38 14.4180 0.40 6
2 3
921.38 14.4180 0.40 Form 3.1-3 Rev. 2
Automated CALCULATION SHEET Page: B-19 of B-26 1zV~
Engineering Cale. No.:
Services Corp.
PBNP-994-2 I-10 Client: FP&L Energy Revision:
0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Cale.
Title:
HELB Reconstitution Program Task 10-GOTHIC Pressure Analyses Reviewed By: CD Henry Safety Related Yes lIZ No ElI Date: 11/12/2008 11 17 21 23 68 94 34 26 31 7
18 69 70 58 59 60 91 65 66 71 90 28 29 30 33 64 84 163 165 182 24 25 36 37 73 92 27 32 93 100 39 38 41 47 74 131 63 139 51 57 6
10 11 12 42 56 19 13 17 2
10 42 42 33 34 35 53 40 41 43 52 14 15 16 18 39 49 102 104 121 12 12 19 19 45 54 13 17 55 61 20 20 21 25 46 81 38 89 26 32 5404.20 921.38 921.38 1147.80 2400.00 42982.00 1147.80 1182.60 1182.60 241.31 241.31 2880.00 2160.00 2776.80 2844.50 2954.20 1719.10 2706.90 2706.90 19199.00 10883.00 1399.80 5589.70 543.38 522.11 2954.20 10874.00 57058.00 59956.00 4000.00 1151.70 1407.70 1407.70 1151.70 14460.00 1703.40 1450.30 1450.30 11245.00 14847.00 5096.00 10400.00 1947.70 1947.70 2172.70 1422.00 25676.00 1070.10 2771.50 2771.50 14.4180 14.4180 14.4180 14.4180 14.4180 14.4180 14.4170 14.4160 14.4160 14.4150 14.4150 14-4A140 14.4140 14.4130 14.4130
-14.4130 14.4130 14.4120 14.4120 14.4120 14.4120 14.4110 14.4110 14.4110 14.4110 14.4110 14.4110 14.4110 14.4110 14.4110 14.4100 14.4100 14.4100 14.4100 14.4100 14.4100 14.4090 14.4090 14.4090 14.4070 14.4060 14.4050 14.40 50 14.40 50 14.40 50 14.40 50 14.4040 14.4040 14.4030 14.4030 0.59 0.44 0.44 0.40 0.79 1.01 0.44 0.40 0.44 0.40 0.44 0.79 0.79 0.72 0.72 0.72 0.72 1.04 1.04 0.72 0.72 0.54 0.54 0.54 0.54 1.04 0.72 1.00 1.00 0.54 0.40 0.40 0.44 0.44 0.96 1.04 0.40 0.44 0.87
- 0. 18 0.44 0.44 0.59 0.59 0.79 0.13 0.79 0.12 0.65 0.65 Form 3.1-3 Rv Rev. 2
Automated I CALCULATION SHEET Page: B3-20 of B-26 j ~Engineering Calc. No.:
Services Corp._____________________
PBNP-994-2 1-10 Client: FP&L Energy Revision:
0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Cale.
Title:
HELB Reconstitution Program Task 10-GOTHIC Pressure Analyses Reviewed By: CD Henry Safety Related Yes El No 0I Date: 11/12/2008 86 50 1
10874.00 14.4030 0.65 44 22 1
3138.80 14.4020 0.54 45 23 1
9063.00 14.4020 0.54 46 24 1
3138.80 14.4020 0.54 52 27 1
1512.00 14.4020 0.65 53 28 1
1054.80 14.4020 0.59 55 30 1
1135.80 14.4020 0.65 56 31 1
1512.00 14.4020 0.65 61 36 1
8107.80 14.4020 0.59 62 37 1
3010.20 14.4020 0.65 72 44 1
1659.40 14.4020 0.65 85 49-2 10270.00 14.4020 0.72 125 75 1
4334.30 14.4020 0.72 42 21 3
3392.80 14.4010 0.59 43 21 4
1876.90 14.4010 0.59 49 25 3
1876.90 14.4010 0.59 50 25 4
3392.80 14.4010 0.54 54 29 1
29469.00 14.4010 0.65 132 82 1
1419.30 14.4010 1.00 123 73 1
5110.70 14.4000 0.65 124 74 1
5060.50 14.4000 0.65 186 124 2
894670.00 14.4000 0.09 134 84 1
1292.50 14.3990 0.65 189 125 2
895990.00 14.3990 0.09 88 51 1
10874.00 14.3980 10.00 133 83 1
10478.00 14.3980 0.65 140 90 1
8612.50 14.3980 0.65 103 63 1
33120.00 14.3970 0.08 113 64 3
5620.90 14.3970
.0.09 114 64 4
5620.90 14.3970 0.09 105 63 3
27600.00 14.3960 0.08 104 63 2
41760.00 14.3950 0.07 130 80 1
3947.40 14.3950 0.49 87 50 2
10270.00 14.3940 0.65 145 95 1
13442.00 14.3940 0.05 96 58 1
3024.00 14.3930 0.59 101 62 1
3024.00 14.3930 0.59 ill 64 1
25758.00 14.3930 0.08 112 64 2
25758.00 14.3930 0.08 115 65 1
1216.30 14.3920 0.59 116 66 1
2214.70 14.3920 0.59 118 68 1
3951.10 14.3920 0.59 121 71 1
1507.10 14.3920 0.59 122 72 1
2214.70 14.3920 0.54 148 95 4
88754.00 14.3920 0.05 106 63 4
34800.00 14.3910 0.07 117 67 1
1038.80 14.3910 0.59 119 69 1
2625.90 14.3910 0.54 120 70 1
21941.00 14.3910 0.54 126 76 1
905.71 14.3910 0.59 Form 3.1-3 Rv Rev. 2
Automated CALCULATION SHEET Page: B-21 of B-26 I
Engineering Calc. No.:
Services Corp.
PBNP-994-2 1-10 Client: FP&L Energy Revision:
0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.
Title:
HELB Reconstitution Program Task 10-GOTHIC Pressure Analyses Reviewed By: CD Henry Safety Related Yes El No LII Date: 11/12/2008 127 77 1
98439.00 14.3910 0.59 128 78 1
905.71 14.3910 0.59 129 79 1
1038.80 14.3910 0.59 136 86 1
4558.20 14.3910 0.54 144 94 1
2023.40 14.3910 10.00 147 95 3
42461.00 14.3910 0.04 135 85 1
3517.70 14.3900 0.59 137 87 1
10100.00 14.3900 0.54 146 95 2
28097.00 14.3900 0.02 89 51 2
10270.00 14.3890 10.00 141 91 1
9934.60 14.3890 10.00 142 92 1
7670.00 14.3890 0.54 143 93 1
1778.40 14.3890 10.00 97 58 2
4368.00 14.3880 0.59 102 62 2
4368.00 14.3880 0.59 157 96 1
4031.80 14.3870 0.22 160 99 1
1169.60 14.3830 10.00 192 127 1
1000000.00 14.3820 10.00 195 130 1
1000000.00 14.3810 10.00 196 131 1
1000000.00 14.3810 10.00 159 98 1
5936.10 14.3800 0.18 161 100 1
1251.60 14.3800 10.00 83 48 1
8654.10 14.3790 10.00 164 103 1
59208.00 14.3790 10.00 95 57 1
13874.00 14.3780 10.00 191 126 1
1000000.00 14.3780 10.00 98 59 1
9999.00 14.3770 10.00 99 60 1
9999.00 14.3770 10.00 22 12 1
939.09 14.3750 0.00 35 19 2
939.09 14.3750 0.00 40 21 1
3520.80 14.3750 0.00 48 25 2
3520.80 14.3750 0.00 67 42 1
3200.00 14.3750 0.00 75 47 1
2388.80 14.3750 0.00 76 47 2
1706.30 14.3750 0.00 79 47 5
3241.90 14.3750 0.00 107 63 5
34362.00 14.3750 0.00 108 63 6
43326.00 14.3750 0.00 109 63 7
28635.00 14.3750 0.00 110 63 8
36105.00 14.3750 0.00 149 95 5
21609.00 14.3750 0.00 150 95 6
45170.00 14.3750 0.00 151 95 7
27892.00 14.3750 0.00 152 95 8
58302.00 14.3750 0.00 153 95 9
88106.00 14.3750 0.00 154 95 10 184160.00 14.3750 0.00 155 95 11 44840.00 14.3750 0.01 156 95 12 93727.00 14.3750 0.02 158 97 1
5021.10 14.3750 1.00 162 101 1
38741.00 14.3750 0.02 Form 3.1-3
.Rev. 2
Automated CALCULATION SHEET Page: B-22 of B-26 ja Engineering Calc. No.:
Services Corp.
PBNP-994-2 1-10 Client: FP&L Energy Revision:
0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Caic.
Title:
HELB Reconstitution Program Task 10-GOTHIC Pressure Analyses Reviewed By: CD Henry Safety Related Yes El No
[I Date: 11/12/2008 166 105 1
41586.00 14.3750 0.10 167 106 1
97427.00 14.3750 0.00 168 107 1
258090.00 14.3750 0.01 169 108 1
258090.00 14.3750 0.00 170 109 1
1000000000.00 14.3750 10.00 171 110 1
1000000000.00 14.3750 10.00 172 111 1
1000000000.00 14.3750 10.00 173 112 1
1000000000.00 14.3750 10.00 174 113 1
1000000000.00 14.3750 10.00 175 114 1
1000000000.00 14.3750 10.00 176 115 1
1000000000.00 14.3750 10.00 177 116 1
1000000000.00 14.3750 10.00 178 117 1
1000000000.00 14.3750 10.00 187 124 3
1396400.00 14.3750 0.00 190 125 3
1393100.00 14.3750 0.00 193 128 1
1000000.00 14.3750 10.00 194 129 1
1000000.00 14.3750 10.00 197 132 1
1000000.00 14.3750 10.00 B.6 PB-PAB-272_P Max Pressure Filename Cell Vol L Cell Volume Max Value Max Time 181 120 1
2400.00 14.4770 1.08 183 122 1
5000.00 14.4430 1.09 184 123 1
5000.00 14.4430 1.09 179 118 1
2900.00 14.4330 1.22 180 119 1
2900.00 14.4290 1.10 1
1 1
614.25 14.4260 0.40 4
2 1
614.25 14.4260 0.40 15 10 1
614.25 14.4260 0.44 19 11 1
614.25 14.4260 0.44 185 124 1
627740.00 14.4260 0.09 188 125 1
629770.00 14.4260 0.09 2
1 2
614.25 14.4230 0.40 5
2 2
614.25 14.4230 0.40 12 7
1 291.53 14.4220 0.54 16 10 2
614.25 14.4220 0.44 20 11 2
614.25 14.4220 0.44 77 47 3
514.50 14.4220 1.06 78 47 4
367.50 14.4220 1.06 10 5
1 56.25 14.4210 0.54 138 88 1
1257.30 14.4210 1.00 8
3 1
1698.30 14.4190 0.59 9 -
4 1
1698.30 14.4190 0.59 Form 3.1-3 Rev. 2
Automated I CALCULATION SHEET Page: B3-23 of B-26 ZEngineering Calc. No.:
Services Corp. IPBNP-994-2 1-10 Client: FP&L Energy Revision:
0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.
Title:
HELB Reconstitution Program Task 10-GOTHIC Pressure Analyses Reviewed By: CD Henry Safety Related Yes El No LI Date: 11/12/2008 13 8
1 1698.30 14.4190 0.59 14 9
1 1792.60 14.4190 0.59 80 47 6
2315.60 14.4190 1.03 3
1 3
921.38 14.4180 0.40 6
2 3
921.38 14.4180 0.40 11 6
1 5404.20 14.4180 0.54 17 10 3
921-38 14.4180 0.44 21 11 3
921.'38 14.4180 0.44 68 42 2
2400.00 14.4180 0.72 81 47 7
698.25
.14.4180 1.06 82 47 8
498.75 14.4180 1.06 23 12 2
1147.80 14.4170 0.40 34 19 1
1147.80 14.4170 0.44 94 56 1
42982.00 14.4170 1.01 26 13 1
1182.60 14.4160 0.40 31 17 1
1182.60 14.4160 0.44 7
2 4
241.31 14.4150 0.40 18 10 4
241.31 14.4150 0.44 69 42 3
2880.00 14.4140 0.72 169 108 1
258090.00 14.4140 0.30 70 42 4
2160.00 14.4130 0.72 58 33 1
2776.80 14.4120 0.72 59 34 1
2844.50 14.4120 0.72 60 35 1
2954.20 14.4120 0.72 91 53 1
1719.10 14.4120 0.72 66 41 1
2706.90 14.4110 0.87 71 43 1
19199.00 14.4110 0.72 90 52 1
10883.00 14.4110 0.72 163 102 1
57058.00 14.4110 1.00 165 104 1
59956.00 14.4110 1.00 182 121 1
4000.00 14.4110 0.54 24 12 3
1151.70 14.4100 0.40 25 12 4
1407.70 14.4100 0.40 28 14 1
1399.80 14.4100 0.54 29 15 1
5589.70 14.4100 0.54
.30 16 1
543.38 14.4100 0.54 33 18 1
522.11 14.4100 0.54 36 19 3
1407.70 14.4100 0.44 37 19 4
1151.70 14.4100 0.44 64 39 1
2954.20 14.4100 0.87 65 40 1
2706.90 14.4100 0.87 73 45 1
14460.00 14.4100 0.87 84 49 1
10874.00 14.4100 0.65 27 13 2
1450.30 14.4090 0.40 32 17 2
1450.30 14.4090 0.44 92
.54 1
1703.40 14.4090 0.87 93 55 1
11245.00 14.4080 0.87 100 61 1
14847.00 14.4070 0.18 39 20 2
5096.00 14.4060 0.44 38 20 1
10400.00 14.4050 0.44 Form 3.1-3 Rev. 2 Form 3.1-3 Rev. 2
Automated j CALCULATION SHEET Page: B3-24 of B-26 SEngineering Cale. No.:
Services Corp.
PBNP-994-21 1-10 Client: FP&L Energy Revision:
0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.
Title:
HELD Reconstitution Program Task 10O-GOTHIC Pressure Analyses Reviewed By: CD Henry Safety Related Yes l
No ED Date: 11/12/2008 47 25 1
1947.70 14.4050 0.54 131 81 1
1422.00 14.4050 0.13 41 21 2
1947.70 14.4040 0.59 74 46 1
2172.70 14.4040 0.79 139 89 1
1070.10 14.4040 0.12 63 38 1
25676.00 14.4030 0.79 44 22 1
3138.80 14.4020 0.54 46 24 1
3138.80 14.4020 0.54 51 26 1
2771.50 14.4020 0.59 57 32 1
2771.50 14.4020 0.59 61 36 1
8107.80 14.4020 0.59 86 50 1
10874.00 14.4020 0.65 45 23 1
9063.00 14.4010 0.54 52 27 1
1512.00 14.4010 0.59 53 28 1
1054.80
.14.4010 0.59
-54 29 1
29469.00 14.4010 0.59 55 30 1
1135.80 14.4010 0.59 56 31 1
1512.00 14.4010 0.65 62 37 1
3010.20 14.4010 0.59 72 44 1
1659.40 14.4010 0.59 85 49 2
10270.00 14.4010 0.65 125 75 1
4334.30 14.4010 0.72 132 82 1
1419.30 14.4010 1.00 42 21 3
3392.80 14.4000 0.54 43 21 4
1876.90 14.4000 0.54 49 25 3
1876.90 14.4000 0.54 50 25 4
3392.80 14.4000 0.54 186 124 2
894670.00 14.4000 0.09 189 125 2
895990.00 14.4000 0.09 123 73 1
5110.70 14.3990 0.65 124 74 1
5060.50 14.3990 0.65 134 84 1
1292.50 14.3990 0.65 88 51 1
10874.00 14.3970 0.65 103 63 1
33120.00 14.3970 0.08 113 64 3
5620.90 14.3970 0.09 114 64 4
5620.90 14.3970 0.09 133 83 1
10478.00 14.3970 0.65 140 90 1
8612.50 14.3970 0.65 105 63 3
27600.00 14.3960 0.08 104 63 2
41760.00 14.3950 0.07 130 80 1
3947.40 14.3940 0.49 145 95 1
13442.00 14.3940 0.05 87 50 2
10270.00 14.3930 0.65 96 58 1
3024.00 14.3930 0.59 101 62 1
3024.00 14.3930 0.59 ill 64 1
25758.00 14.3930 0.08 112 64 2
25758.00 14.3930 0.08 115 65 1
1216.30 14.3920 0.54 116 66 1
2214.70 14.3920 0.59 122 72 1
2214.70 14.3920 0.54 Form 3.1-3 Rv Rev. 2
IAutomated CALCULATION SHEET Page: B-25 of B-26 z~ kk Engineering Cale. No.:
Services Corp.
PBNP-994-2 1-10 Client: FP&L Energy Revision:
0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.
Title:
I-ELB Reconstitution Program Task 10O-GOTHIC Pressure Analyses Reviewed By: CD Henry Safety Related Yes El No El Date: 11/12/2008 148 95 4
88754.00 14.3920 0.05 106 63 4
34800.00 14.3910 0.07 117 67 1
1038.80 14.3910 0.59 118 68 1
3951.10
~
14.3910 0.54 119 69 1
2625.90 14.3910 0.54 121 71 1
1507.10 14.3910 0.54 126 76 1
905.71 14.3910 0.59 128 78 1
905.71 14.3910 0.59 129 79 1
1038.80 14.3910 0.59 136 86 1
4558.20 14.3910 0.54 144 94 1
2023.40 14.3910 10.00 147 95 3
42461.00 14.3910 0.04 120 70 1
21941.00 14.3900 0.54 127 77 1
98439.00 14.3900 0.59 135 85 1
3517.70 14~3900 0.59 146 95 2
28097.00 14.3900 0.02' 137 87 1
10100.00 14.3890 0.54 142 92 1
7670.00 14.3890 0.54 143 93 1
1778.40 14.3890 0.54 89 51 2
10270.00 14.3880 0.65 97 58 2
4368.00 14.3870 0.59 102 62 2
4368.00 14.3870 0.59 141 91 1
9934.60 14.3870 0.54 157 96 1
4031.80 14.3870 0.22 168 107 1
258090.00 14.3850 0.59 160 99 1
1169.60 14.3830 10.00 195 130 1
1000000.00 14.3810 10.00 159 98 1
5936.10 14.3800 0.16 161 100 1
1251.60 14.3800 10.00 83 48 1
8654.10 14.3790 10.00 95 57 1
13874.00 14.3780 10.00 191 126 1
1000000.00 14.3780 10.00 98 59 1
9999.00 14.3770 10.00 99 60 1
9999.00 14.3770 10.00 164 103 1
59208.00 14.3770 0.18 192 127 1
1000000.00 14.3770 2.16 196 131 1
1000000.00 14.3760 5.89 22 12 1
939.09 14.3750 0.00 35 19 2
939.09 14.3750 0.00 40 21 1
3520.80 14.3750 0.00 48 25 2
3520.80 14.3750 0.00 67 42 1
3200.00 14.3750 0.00 75 47 1
2388.80 14.3750 0.00 76 47 2
1706.30 14.3750 0.00 79 47 5
3241.90 14.3750 0.00 107 63 5
34362.00 14.3750 0.00 108 63 6
43326.00 14.3750 0.00 109 63 7
28635.00 14.3750.
0.00 110 63 8
36105.00 14.3750 0.00 149 95 5
21609.00 14.3750 0.00 Form 3.1-3 Rv Rev. 2
Automated CALCULATION SHEET Page: B-26 of B-26 Z
Engineering Calc. No.:
Services Corp.
PBNP-994-2 1-10 Client: FP&L Energy Revision:
0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.
Title:
HELB Reconstitution Program Task 10-GOTHIC Pressure Analyses Reviewed By: CD Henry Safety Related Yes El No ED Date: 11/12/2008 150 95 6
45170.00 14.3750 0.00 151 95 7
27892.00 14.3750 0.00 152 95 8
58302.00 14.3750 0.00 153 95 9
88106.00 14.3750 0.00 154 95 10 184160.00 14.3750 0.00 155 95 11 44840.00 14.3750 0.00 156 95 12 93727.00 14.3750 0.00 158 97 1
5021.10 14.3750 1.00 162 101 1
38741.00 14.3750 0.02 166 105 1
41586-.00 14.3750 0.10 167 106 1
97427.00 14.3750 0.00 170 109 1
1000000000.00 14.3750 10.00 171 110 1
1000000000.00 14.3750 10.00 172 111 1
1000000000.00 14.3750 10.00 173 112 1
1000000000.00 14-.3.750 10.00 174 1*3 1
1000000000.00 14-.3750 10.00 175 114 1
1000000000.00 14.3750 10.00 176 115 1
1000000000.00 14.3750 10.00 177 116 1
1000000000.00 14.3750 10.00 178 117 1
1000000000.00 14.3750 10.00 187 124 3
1396400.00 14.3750 0.00 190 125 3
1393100.00 14.3750 0.00 193 128 1
1000000.00 14.3750 10.00 194 129 1
1000000.00 14.3750 10.00 197 132 1
1000000.00 14.3750 10.00 Form 3.1-3 Rev. 2
ENCLOSURE 1 ATTACHMENT 11 NEXTERA ENERGY POINT BEACH, LLC POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 LICENSE AMENDMENT REQUEST 261 EXTENDED POWER UPRATE RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION 129187-C-0009, REVISION 0, EVALUATION OF STRUCTURAL INTEGRITY ASSOCIATED WITH HIGH ENERGY PIPE FAILURE OUTSIDE CONTAINMENT 11 pages follow
ShaWs NUCLEAR CALCULATION SHEET A;
- CALCULATIONIDENTIFICATION&NUMBER J.O. OR W.0 NUMBER DIVISION AND GROUP CALCULATION NUMBER REVISION NUMBER 129187 C
0009 0
PAGE#3 TABLE OF CONTENTS CA LC U LAT IO N TITLE PA G E..........................................................................................
1 R EV IEW STATEM ENT................................................................................................
2 TA BLE O F C O NTENTS................................................................................................
3 R EC O R D O F R EV IS IO N S...............................................................................................
4 1.0 C O N C LU S IO N....................................................................................................
5 2.0 P U R P O S E.................................................
5 3.0 R E FE R E N C ES..................................................................................................
5 4.0 CA LC U LATIO N IN PUTS......................................................................................
7 5.0 A S S U M PT IO N S.................................................................................................. 7 6.0 M ET H O D O LO G Y.................................................................................................
7 7.0 CO NFIRM ATIO N REQ UIRED..............................................................................
7 8.0.
COMPUTER CODE IDENTIFICATION.................................................................
7 9.0 C A LC U LA T IO N..................................................................................................
7 10.0 A TTA C H M ENTS................................................................................................
8 10.1 ATTACHMENT A "HELB PRESSURE
SUMMARY
FROM PBNP-994-21-10.........................
0".
1 PGS 10.2 ATTACHMENT B "HELB(HIGH ENERGY LINE BREAKS) AND LOCATION DRAWINGS" 4 PGS
Siaw&
NUCLEAR CALCULATION SHEET RECORD OF REVISIONS Rev.
Pages Pages Pages No.
Description of Changes Revised Added Replaced 0
Original Issue N/A N/A N/A i
- i.
i
Shiaw NUCLEAR CALCULATION SHEET CALCULATION IDENTIFICATION NUMBER J.O. OR W.O NUMBER DIVISION AND GROUP CALCULATION NUMBER REVISION NUMBER 129187 C
0009 0
PAGEA
1.0 CONCLUSION
The PBNP HELB Reconstitution Report [Ref 3.1] identified areas of concern associated with a high energy line break. AES (Automated Engineering Services Corp.) had concluded that only breaks listed in reference 3.2 and provided as Attachments A and B, needed to be evaluated because the other system breaks were bounded by the original calculations. Areas/Rooms evaluated and associated maximum pressures are shown in Attachments A and B. Conclusions are shown in the calculation section (section 13) and are not repeated here. For the pressures and rooms identified it is concluded that the structure would safely limit any damage to the integrity of the structure as a whole.
2.0 PURPOSE The Point Beach FSAR Appendix A.2 [Reference 3.4] identified some of the systems and breaks that would be a part of the High Energy Line Breaks (HELB) but the lists and analysis was deemed incomplete and a new study and analysis made. The results of that study concluded that only the breaks shown in Attachments A and B had not been investigated and included in the FSAR. It is now necessary to determine if these HELB pressures create a structural failure that prevents a safe shut down of the plant.
3.0 REFERENCES
3.1 PBNP HELB Reconstitution Program Task 1 Report, December 28,2006, Rev.0 3.2 PBNP-994-21-10, Point Beach Nuclear Plant Calculation, HELB Reconstitution Program Task 10 - GOTHIC Pressure Analyses, Rev 0, 11-12-08, Transmitted on DIT-PB-EPU-08-SSW-0052,12/12/08 3.3 Engineering Evaluation No 2002-0020, HELB Evaluation of Door 19 Windows, 1/25/2003 3.4 PBNP FSAR (08/04) High Energy Pipe Failure Outside Containment, APPENDIX A.2 High Energy Pipe Failure Outside Containment 3.5 DIT-PB-EXT-0642-00, Rev 0,Assessment of Computer Room Windows for HELB Loading 12-7-2002 3.6 PBNP -994-21-05-P06, Rev 0, Point Beach Nuclear Plant Calculation, Point
Shaw NUCLEAR CALCULATION SHEET CALCULATION iDENTIFICATION NUMBERK J.O. OR W.O NUMBER DIVISION AND GROUP CALCULATION NUMBER 129187 C
0009 Beach Steam Supply Piping to AFW Pump and Radwaste GL 87-11 Break Location Determination, 11-13-08, Transmitted on DIT-PB-EPU-08-SSW-0052,12/12/08 3.7 PBNP -6118-47.3-1, Point Beach Nuclear Plant Calculation, Point Beach Tornado Investigation Facade Steel, dated 10/28/69 3.8 PBNP -6118-47.3-2, Point Beach Nuclear Plant Calculation, Point Beach Facade Scheme J, dated 11/3/69 3.9 PBNP -6118-47.3-3, Point Beach Nuclear Plant Calculation, Point Beach Facade Tornado Final, dated 11/11/69 3.10 PBNP -6118-47.2-1, Point Beach Nuclear Plant Calculation, Point Beach Turbine Building - Tornado-Column Line A, dated 11/29/69 3.11 PBNP -6118-47.2-3, Point Beach Nuclear Plant Calculation, Point Beach Auxiliary Building - Tornado-Column Line"6", dated 11/28/69 3.12 PBNP -6118-47.2-5, Point Beach Nuclear Plant Calculation, Point Beach Siding Investigation, dated 10/16/69 3.13 PBNP -6118-47.1-1, Point Beach Nuclear Plant Calculation, Point Beach Turbine Building - Bottbm Chord, dated 11/20/69 3.14 PBNP -6118-47.1-3, Point Beach Nuclear Plant Calculation, Point Beach Turbine Building -. Frames, dated 10/23/69 3.15 PBNP -6118-47.1-4, Point Beach Nuclear Plant Calculation, Point Beach Turbine Building - Tornado Analyses, dated 11/13/69 3.16 PBNP -6118-47.1-5, Point Beach Nuclear Plant Calculation, Point Beach Turbine Building - Tornado-Final, dated 11/13/69 3.17 PBNP -6118-47.1-6, Point Beach Nuclear Plant Calculation, Point Beach Turbine Building - Columns, dated 11/19/69 3.18 Sargent & Lundy calculation, S-09334-357-HE.1, Revision 2, 10-21-99 3.19 Bechtel Drawing, Equipment Location Sections E-E, F-F, G-G & H-H, M-11, Rev 9 3.20 Bechtel Drawing, Equipment Location Plan Intermediate Floor Levels North, M-2005, Rev 15 3.21 Bechtel Drawing, Equipment Location Sections H-H & K-K, M-2009, Rev 8, 9/1/05 3.22 Bechtel Drawing, Equipment Location Plan Ground Floor South Unit 1, M-7, Rev 26, 1/14/08 3.23 PBNP-2002-0053 Rev 0 Point Beach Nuclear Plant Calculation, Turbine
Shaw NUCLEAR CALCULATION SHEET CALCULATION IDEvTiFiCATION NUMBER J.O. OR W.O NUMBER DIVISION AND GROUP CALCULATION NUMBER REVISION NUMBER 129187 C
0009 0
Building Maximum Pressure 3.24 PBNP-2003-0002 Rev 0 Point Beach Nuclear Plant Calculation, Evaluation of CCW Hx Room Walls and Slabs for HELB Loads 4.0 CALCULATION INPUTS See Attachments A and B 5.0 ASSUMPTIONS None (Inherited assumptions from a few of the references are verified to be conservative.)
6.0 METHODOLOGY The loads and locations identified in Attachments A and B are compared against the design calculations for the area identified. It will then be determined by reviewing the existing design criteria and calculations whether the existing design enveloped the HELB parameters or whether new calculations are required.
7.0 CONFIRMATION REQUIRED None 8.0 COMPUTER CODE IDENTIFICATION N/A 9.0 CALCULATION In Attachments A and B, room 596, which also represents room 524, is identified as an area needing evaluation for a 0.561 psig increase in room pressure caused by HELB. This area is called the Containment Facade and has outside walls that are covered by metal wall panels attached to the structural steel with some wall and roof areas. The inner walls are the containment structure and are designed for pressures many times that currently being addressed. The metal wall panels are considered to blow-off at approximately 0.5 psig. Justification can be found on page 2 of ref 3.7 where it was determined that the clips holding the siding will start to fail at between 53 and 64 psf. This equates to a force of 64psf/144in/ft2 =
0.44 psi. References 3.7, 3.8 & 3.9 go on to qualify the steel for 0.5 psi and for
Shaw NUCLEAR CALCULATION SHEET CALCULATION IDENTIFICATI0N~NUMBER
'~i J.O. OR W.O NUMBER DIVISION AND GROUP CALCULATION NUMBER REVISION NUMBER 129187 C
0009 0
PAGE # 8 the higher tornado loads associated with 360 mph considering that 1/3 of the siding had failed and blown away.
In Attachments A and B, room 301, which also represents room 583, is identified as an area needing evaluation for a 0.609 psig increase in room pressure caused by HELB. This area is called the Turbine Building which is also enclosed by metal wall panel attached to the structural steel with some wall and roof areas normally open to the atmosphere. No vent path credit has been taken for these openings. The metal wall panels start failing at approximately 0.24 psig. Page 8 of ref 3.23 indicates this conclusion. Building pressure will be limited to 0.24 psig due to the failure of the metal wall panels. References 3.10, 3.11, 3.13, 3.14, 3.15, 3.16 & 3.17 qualify the framing steel for greater pressures than 0.24 psig on the building frame. Within these reference calculations the.adjacent Auxiliary building wall was also shown to be acceptable for the 0.24 psig.
In Attachments A and-B, rooms 271 and 272-are identified as an area needing-evaluation for a 0.104 psig maximum increase in room pressure caused by HELB. Room 271 and room 272 is evaluated for break which will blow off the metal wall panels attached to the structural steel when the pressure exceeded 0.469 psig. This evaluation can be found in reference 3.18 and in the evaluation it was decided that doors 194 and 191 be modified to permit venting of HELB breaks into the facade area to alleviate the pressure (page 49 of reference).The pressure expected is only 22% of what would cause the panels to start to fail and therefore is considered acceptable.
In Attachments A and B, room 237 needs evaluation for a 0.462 psig maximum increase in room pressure caused by HELB event. Room 237 was evaluated for 0.5 psig and found acceptable by calculation. See reference 3.24.
In Attachments A and B, room 140 which also represents rooms 147, 146, 137, 144, and 145 -The HELB pressure needs evaluation for a 0.135 psig increase in room pressure caused by HELB. The walls, floor and roofs of these rooms are concrete and can resists the small 20 psf load which would be applied by the HELB. Because of the above reason, for this HELB event this area is found to be acceptable.
10.0 ATTACHMENTS 10.1 Attachment A "HELB Pressure Summary from PBNP-994-21-10" 10.2 Attachment B "HELB(High Energy Line Breaks) and Location Drawings"
J.O. OR W.O NUMBER 129187 DIVISION AND GROUP C
Attachment A CALCULATION NUMBER 0009 Rev 0 Page 1 of 1 I Automated CALCULATION SHEET Page: 7 of 8 Engineering Calc. No.:
Services Corp.
PBNP-994-2 1-10 Client: FP&L Energy Revision:
0 Station: Point Beach Nuclear Plant Prepared By: RC Kern Calc.
Title:
HELB Reconstitution Program Task 10-GOTHIC Pressure Analyses Reviewed By: CD Henry Safety Related Yes El No Dl Date: 11/12/2008
- 7.
Analysis Based on a review of the pressure limiting cases identified in DI rooms were not analyzed.
3, HELBs in the following Room 524 - Room 596 is more limiting, since its volume is smaller.
Room 583 - Room 301 is assumed to encompass this room.
Rooms 147, 146, 137, 144, and 145 - The HELB in these rooms is relatively small and does not present a challenge for a limiting pressure response, so the one in Room 140 was chosen as a tvyical case.
Room 238 - The HELB in this room is bounded by the one in Room 271.
Room 273 - The HELB in this room is bounded by the one in Room 272.
The following table presents the summary of the results of the pressure limiting cases that were run. The maximum pressures in this table are for all of the volumes. The distributions of the maximum pressures for all volumes for these cases are shown in Attachment B.
Room GOTHIC Case ID Maximum Pressure and Time [psia(psig)/sec]
596 PB-PAB-596 P 14.936(0.561) / 0.13 301 PB-PAB-301 P 14.984(0.609) / 1.06 140 PB-PAB-140 P 14.510(0.135) / 0.12 237 PB-PAB-237 P 14.837(0.462) / 1.27 271 PB-PAB-271 P 14.479(0.104) / 1.08 272 PB-PAB-272 P 14.477(0.102) / 1.08 Note that all initial pressures are 14.375psia and the gauge pressures listed in the previous table are relative to that pressure.
Form 3.1-3 Rev. 2 HELB Pressure Summary from PBNP-994-21-10
J.O. OR W.O NUMBER 129187 DIVISION AND GROUP C
Attachment B CALCULATION NUMBER 0009 Rev O Page A of 4 HELB(HIGH ENERGY LINE BREAKS) AND LOCATION DRAV\\NGS
J.O. OR W.O NUMBER DIVISION AND GROUP CALCULATION NUMBER 129187 C
Attachment B 0009 Rev 0 Page 2 of 4 583GRP 301GRP 2 31 S-V ~
TURSNt'P 5UIL-D1I4; I~~~~
.2 R
S-3261300 rT L
1 44'40" E3OIV Scle: I = 3,9'- 0" HELB(HIGH ENERGY LINE BREAKS) AND LOCATION DRAWINGS
J.O. OR W.O NUMBER 129187 DIVISION AND GROUP
. C Attachment B CALCULATION NUMBER 0009 Rev 0 Page 3 of 4 663-U E1'vatj1 Sc*1le: I" = 30'. 0" HELB(HIGH ENERGY LINE BREAKS) AND LOCATION DRAWINGS
J.O, OR W.O NUMBER 129187 DIVISION AND GROUP C
Attachment B CALCULATION NUMBER 0009 Rev 0 Page 4 of 4 2
B'.
E I
SOEle-Eli-N S.,ie: 1, = 30" - O, HELB(HIGH ENERGY LINE BREAKS) AND LOCATION DRAWINGS