Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
IR 05000416/2008402 | 22 December 2008 | NRC Security Team Inspection Report 05000416-08-402 | Significance Determination Process Affidavit |
GNRO-2008/00065, Exemption Request for Holtec HI-STORM 100 System | 22 December 2008 | Exemption Request for Holtec HI-STORM 100 System | Exemption Request Fuel cladding |
TAC:L24296 | 22 December 2008 | ||
ML083650181 | 19 December 2008 | Letter to Elmo E. Collins, RA, Riv, from Lisa Hammond, Rac Chair, U.S. Dept of Homeland Security, FEMA Region 6, Grand Gulf Nuclear Station Drill Report - 2008-11-20, Final Report, Radiological Emergency Preparedness (REP) Program 2008-12-1 | |
ML083650185 | 19 December 2008 | Drill Report - 2008-11-20, Final Report - Radiological Emergency Preparedness (REP) Program 2008-12-19, Pgs 1-31 | |
ML083650187 | 19 December 2008 | Drill Report - 2008-11-20, Final Report - Radiological Emergency Preparedness (REP) Program 2008-12-19, Pgs 1-39 | |
IR 05000416/2008007 | 18 December 2008 | IR 05000416-08-007, 11/06/2008, for Grand Gulf, Specific Implementation of B.5.B Phase 2 and 3, Mitigating Strategies Temporary Instruction Inspection | B.5.b |
ML12018A062 | 18 December 2008 | Drawing M-1085D (LRA-M-1085D), Rev. 004 Piping & Instrumentation Diagram Residual Heat Removal System, Unit 1 | |
ML083570174 | 16 December 2008 | IR 05000416-09-006, on February 2-6, 2009, February 16-27, 2009, Grand Gulf Nuclear Station - Information Request for NRC Triennial Baseline Component Design Basses Inspection | Temporary Modification |
ML083500243 | 15 December 2008 | Emergency Preparedness Procedure 10-S-01-12, Revision 39, Radiological Assessment and Protective Action Recommendations | Met Tower |
IR 05000416/2008008 | 15 December 2008 | IR 05000416-08-008 & 07200050-08-002 on 11/17/2008 - 11/19/2008 for Grand Gulf Nuclear Station | Unanalyzed Condition Exemption Request Fuel cladding |
ML083440700 | 9 December 2008 | IR 05000416-08-404, on 12/02/2008, Response to Notice of Violation and NRC Inspection | |
ML083390752 | 4 December 2008 | Response to Notice of Violation and NRC Integrated Inspection Report 05000416/2008004 | |
ML12019A036 | 2 December 2008 | Drawing M-0049, (LRA-M-0049), Rev. 044, P & I Diagram Control Room HVAC System Unit 1 | |
ML083360755 | 1 December 2008 | Assessment Followup Letter-Grand Gulf Nuclear Station | |
GNRO-2008/00068, Nine-Month Supplemental Response to NRC Generic Letter 2008-01. Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems | 20 November 2008 | Nine-Month Supplemental Response to NRC Generic Letter 2008-01. Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems | |
ML12019A025 | 18 November 2008 | Drawing M-0035E (LRA-M-0035E), Rev. 022, P & I Diagram Fire Protection System, Unit 1. | |
ML083230540 | 18 November 2008 | Emergency Preparedness Procedure 10-S-01-30, Revision 15, Technical Support Center (TSC) Operations | Health Physics Network Emergency Lighting |
ML083230658 | 18 November 2008 | Emergency Preparedness Procedure 10-S-01-34, Revision 15, Public Information and Enmc/Eic Operations | |
ML083230665 | 18 November 2008 | Emergency Preparedness Procedure 10-S-01-33, Revision 17, Emergency Operations Facility (EOF) Operation | Fitness for Duty Health Physics Network |
ML12019A024 | 18 November 2008 | Drawing M-0035B (LRA-M-0035B), Rev. 047, P & I Diagram Fire Protection System, Unit 1. | |
ML12018A202 | 18 November 2008 | Drawing M-1109F (LRA-M-1109F), Rev. 18, Piping & Instrumentation Diagram Plant Chilled Water System. | |
GNRO-2008/00073, Reply to Notice of Violation EA-98-295 | 13 November 2008 | Reply to Notice of Violation EA-98-295 | |
GNRO-2008/00072, Report of Changes and Errors to 1OCFR50.46 | 12 November 2008 | Report of Changes and Errors to 1OCFR50.46 | |
ML082490768 | 5 November 2008 | Staff Evaluation Providing Basis for Partial Denial of License Amendment Request, Technical Specifications Changes for Condensate Storage Tank Level-Low Instrumentation | Safe Shutdown Unanalyzed Condition Reactor Vessel Water Level |
ML083080445 | 3 November 2008 | Final Significance Determination for a Greater than Green Finding and Notice of Violation (NRC Physical Security Special Inspection Report 05000416-08-404) | |
IR 05000416/2008404 | 3 November 2008 | Final Significance Determination for a Greater than Green Finding and Notice of Violation (NRC Physical Security Special Inspection Report 05000416-08-404) | |
GNRO-2008/00071, Inservice Inspection (ISI) Program Third 10-Year Interval, Rev. 0 | 29 October 2008 | Inservice Inspection (ISI) Program Third 10-Year Interval, Rev. 0 | Hydrostatic Nondestructive Examination VT-2 Incorporated by reference Aging Management Large early release frequency Scaffolding |
ML12019A083 | 28 October 2008 | Drawing M-1051D, (LRA-M-1051D), Rev. 011, P & I Diagram Main & Reheat Steam System | |
GNRO-2008/00070, Cycle 17 Update to the Core Operating Limits Report (COLR) | 28 October 2008 | Cycle 17 Update to the Core Operating Limits Report (COLR) | |
ML12019A100 | 28 October 2008 | Drawing M-1057B, (LRA-M-1057B), Rev. 014, P & I Diagram Main and RFP Turbine Seal Steam and Drains System | |
IR 05000416/2008401 | 24 October 2008 | IR 05000416-08-401, on 10/01/2008, Grand Gulf Nuclear Station - NRC Security Inspection Report | Affidavit |
ML12018A059 | 23 October 2008 | Drawing M-1085A (LRA-M-1085A), Rev. 068 Piping & Instrumentation Diagram Residual Heat Removal System, Unit 1 | |
ML12019A298 | 23 October 2008 | Drawing M-1065 (LRA-M-1065), Rev. 043, Piping & Instrumentation Diagram Condensate & Refueling Water Storage & Transfer System, Unit 1 | |
ML12019A089 | 23 October 2008 | Drawing M-1053E, (LRA-M-1053E), Rev. 012, P & I Diagram Condensate System Unit 1 | |
GNRO-2008/00069, Technical Specification Bases and Technical Requirements Manual Update to the NRC for Period Dated October 22, 2008 | 22 October 2008 | Technical Specification Bases and Technical Requirements Manual Update to the NRC for Period Dated October 22, 2008 | |
ML082960538 | 22 October 2008 | Emergency Preparedness Procedure 01-S-10-3, Revision 15, Emergency Preparedness Department Responsibilities. | |
ML12018A063 | 21 October 2008 | Drawing M-1086 (LRA-M-1086), Rev. 031 Piping & Instrumentation Diagram High Pressure Core Spray System, Unit 1 | |
ML12018A294 | 21 October 2008 | Drawing M-1117D (LRA-M-1117D), Rev. 013, Piping & Instrumentation Diagram Control Fluid System (Turbine Generator). | |
ML082910566 | 17 October 2008 | IR 05000416-08-004, on 06/22/2008 - 09/21/2008, Grand Gulf, Maintenance Effectiveness, Maintenance Risk Assessments and Emergent Work Control, and Problem Identification and Resolution | High winds Packing leak Internal Flooding Enforcement Discretion Probabilistic Risk Assessment Temporary Modification Tornado-Generated Missile Significance Determination Process Maintenance Rule Program Incremental Core Damage Probability Deficit Coast down |
IR 05000416/2008004 | 17 October 2008 | IR 05000416-08-004, on 06/22/2008 - 09/21/2008, Grand Gulf, Maintenance Effectiveness, Maintenance Risk Assessments and Emergent Work Control, and Problem Identification and Resolution | High winds Packing leak Internal Flooding Probabilistic Risk Assessment Temporary Modification Tornado-Generated Missile Significance Determination Process Maintenance Rule Program Fire Protection Program Incremental Core Damage Probability Deficit Coast down Operability Assessment Siren |
ML082960531 | 16 October 2008 | Revision 4 to Emergency Preparedness Procedure 10-S-01-35, Core Damage Assessment. | Fuel cladding |
ML081760023 | 14 October 2008 | Issuance of Amendment No. 178, Adoption of Technical Specifications Task Force (TSTF) Traveler No. 448, Revision 3, Control Room Envelope Habitability. | Safe Shutdown Earthquake Fire Protection Program |
GNRO-2008/00066, Nine-Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems | 13 October 2008 | Nine-Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems | Hydrostatic Locked High Radiation Area Scaffolding |
ML082960540 | 9 October 2008 | Emergency Preparedness Procedure 10-S-01-11, Revision 19, Evacuation of Onsite Personnel. | |
ML082800074 | 3 October 2008 | Site-Specific Implementation of B.5.B Phase 2 and 3 Mitigating Strategies Temporary Instruction Inspection (NRC Inspection Report 05000416-08-007) | B.5.b Mitigating Strategies |
ML082770147 | 1 October 2008 | Emergency Plan Implementing Procedure, 01-S-10-6, Rev. 21, Emergency Response Organization. | |
ML082770146 | 1 October 2008 | Revision 021 to Emergency Preparedness Procedure 10-S-01-29, Operations Support Center (OSC) Operations | Safe Shutdown |