RA-08-116, Unit 1 - Notification of Expected Date of Transfer of Nuclear Units to Exelon Generation Company, LLC | 29 December 2008 | Unit 1 - Notification of Expected Date of Transfer of Nuclear Units to Exelon Generation Company, LLC | |
ML082750072 | 23 December 2008 | Unit 1 - Public Safety Evaluation by the Office of Nuclear Reactor Regulation Direct Transfer of Facility Operating Licenses from Amergen Energy Co., LLC to Exelon Generation Co., LLC | |
ML083640237 | 23 December 2008 | Public Letter and Order Notice - Order Approving Transfer of the Operating License and Conforming Amendment | |
ML082750176 | 23 December 2008 | Order Approving Transfer of the Operating License and Conforming Amendment | |
ML082750192 | 23 December 2008 | Draft Amendment to Facility Operating License | Safe Shutdown Safeguards Contingency Plan Fire Protection Program |
ML083470393 | 11 December 2008 | Local Outreach Initiative Letter - Dewitt County Board of Commissioners - Clinton, Il | |
ML083450161 | 4 December 2008 | GFE Annual Registration Letter - 2009 Examinations | Generic Fundamentals Examination |
ML083380415 | 3 December 2008 | Relief Request CR-26 Acceptance Review | |
RS-08-157, Request to Use Later Edition and Addenda to the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code | 3 December 2008 | Request to Use Later Edition and Addenda to the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code | Incorporated by reference |
TAC:ME0217 | 3 December 2008 | ||
RS-08-156, Proposed Alternative to 10CFR 50.55a Examination Requirements for Reactor Pressure Vessel Weld Inspections | 3 December 2008 | Proposed Alternative to 10CFR 50.55a Examination Requirements for Reactor Pressure Vessel Weld Inspections | |
RA-08-115, Request for NRC Written Consent to Proposed Amendments to Trust Agreement the Merger of Amergen Energy Company, LLC Into Its Parent, Exelon Generation Company, LLC | 3 December 2008 | Request for NRC Written Consent to Proposed Amendments to Trust Agreement the Merger of Amergen Energy Company, LLC Into Its Parent, Exelon Generation Company, LLC | |
ML083310073 | 26 November 2008 | Summary of Meeting with Exelon to Review the Results of Security Organization Safety Conscious Work Environment (SCWE) Surveys at Exelon Nuclear Operating Reactors | |
ML083300365 | 25 November 2008 | Final Medical Services Drill Report | |
ML083260340 | 19 November 2008 | IR 05000461-08-403, (Drs), on 10/27/2008, for Clinton, Security Baseline Inspection | Significance Determination Process |
IR 05000461/2008403 | 19 November 2008 | NRC Security Baseline Inspection Report 05000461-08-403(DRS) Preliminary Greater than Green Finding | Enforcement Discretion Significance Determination Process |
TAC:ME0044 | 14 November 2008 | ||
ML082890184 | 14 November 2008 | Closeout of Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients. | |
ML083190288 | 14 November 2008 | Acceptance Review of Clinton Relief Request No. 2210 from OM Code 5-year Test Interval for Safety Relief Valves | |
RA-08-107, Unit 1, 2008 Annual Report -Guarantees of Payment of Deferred Premiums | 13 November 2008 | Unit 1, 2008 Annual Report -Guarantees of Payment of Deferred Premiums | |
IR 05000461/2008004 | 10 November 2008 | IR 05000461-08-004; on 07/01/08 - 09/30/08; Clinton Power Station, Unit 1; Maintenance Effectiveness, Operability Evaluations | Reactor Vessel Water Level Ultimate heat sink Fire Barrier Internal Flooding Past operability Probabilistic Risk Assessment Temporary Modification Emergency Lighting Significance Determination Process Operability Determination Flow Induced Vibration Power Uprate |
ML083110593 | 7 November 2008 | Notice of Closed Meeting to Exelon Generation Company for SCWE Survey Review | Inattentive |
RS-08-144, Request for Relief from ASME OM Code 5-Year Test Interval for Safety Relief Valves (Relief Request No. 2210) | 3 November 2008 | Request for Relief from ASME OM Code 5-Year Test Interval for Safety Relief Valves (Relief Request No. 2210) | Scaffolding Grace period |
TAC:ME1546 | 3 November 2008 | ||
RS-08-141, Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors | 31 October 2008 | Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors | |
ML082940010 | 30 October 2008 | Issuance of Amendment Technical Specification Change as Part of Implementation of TSTF-374, Revision to TS 5.5.9 for Diesel Fuel Oil | |
ML083080225 | 29 October 2008 | Letter Submittal of Knowledge and Abilities Statements That Will Be Excluded from the Random Exam Generation Process | |
ML083030141 | 21 October 2008 | Engine Systems, Inc., Transmittal of 10CFR21-0095, Rev. 0 Reporting of Defects and Non-Compliance, Ingersoll-Rand Series 89 Air Start Motors, P/N 8367694-ESI | |
ML082960885 | 21 October 2008 | Ltr Clinton MOD 50.59 Request for Information | Commercial Grade Dedication |
RS-08-131, General Company, LLC and Amergen Energy Company, LLC, Nine-Month Response to Generic Letter 2008-01 | 14 October 2008 | General Company, LLC and Amergen Energy Company, LLC, Nine-Month Response to Generic Letter 2008-01 | Surveillance Frequency Control Program Generic Issues Program GOTHIC |
ML082760116 | 2 October 2008 | Acceptance Review for Clinton LAR and Per LIC-109 |