October 21, 2008 Mr. Charles G. Pardee Chief Nuclear Officer and Senior Vice President Exelon Generating Company, LLC 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

CLINTON POWER STATION INFORMATION REQUEST FOR AN NRC BIENNIAL PERMANENT MODIFICATIONS AND 10 CFR 50.59 (MOD/50.59)

BASELINE INSPECTION

Dear Mr. Pardee:

On January 26, 2009, the NRC will begin a Modifications and 10 CFR 50.59 (MOD/50.59) baseline inspection at the Clinton Power Station. This inspection will be performed in accordance with the NRC baseline Inspection Procedure IP 71111.17. The on-site portion of the inspection will take place on January 26 through January 30, 2009, and February 9 through February 13, 2009.

Experience has shown that these baseline inspections are extremely resource intensive, both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site and to ensure a productive inspection for both parties, we have enclosed a request for documents needed for the inspection. These documents have been divided into three groups.

The first group is necessary to ensure that the inspection team is adequately prepared for the inspection. This information should be made available via compact disc to the Regional Office no later than November 21, 2008. The inspection team will review this information and, by December 12, 2008, will request specific items that should be available for review by January 12, 2008. The second group of requested documents contains additional items that the team will review, or need access to, during the inspection. Certain documents in Group II, will be requested for review in the Regional Office prior to the inspection. The remaining documents should be available by the first day of the on-site inspection, January 26, 2008. The third group lists information necessary to aid the inspection team in tracking issues identified as a result of the inspection. It is requested that this information be provided to the lead inspector as the information is generated during the inspection. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the on-site portions of the inspection.

C. Pardee The lead inspector for this inspection is Alan Dahbur. We understand that our regulatory contact for this inspection is Ron Frantz; (217) 937-2813 of your organization. If there are any questions about the inspection or the material requested, please contact the lead inspector at (630) 829-9810 or via e-mail at alan.dahbur@nrc.gov.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

David E. Hills, Chief Engineering Branch 1 Division of Reactor Safety Docket No. 50-461 License No. NPF - 62

Enclosure:

Modification and 50.59 Inspection Document Request w/Enclosure (Information for Preparation Week and Information Available On-site During Inspection) cc w/encl:

Site Vice President - Clinton Power Station Plant Manager - Clinton Power Station Regulatory Assurance Manager - Clinton Power Station Chief Operating Officer and Senior Vice President Senior Vice President - Midwest Operations Senior Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director - Licensing and Regulatory Affairs Manager Licensing - Clinton, Dresden and Quad Cities Associate General Counsel Document Control Desk - Licensing Assistant Attorney General J. Klinger, State Liaison Officer, Illinois Emergency Management Agency Chairman, Illinois Commerce Commission

C. Pardee The lead inspector for this inspection is Alan Dahbur. We understand that our regulatory contact for this inspection is Ron Frantz; (217) 937-2813 of your organization. If there are any questions about the inspection or the material requested, please contact the lead inspector at (630) 829-9810 or via e-mail at alan.dahbur@nrc.gov.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response, will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

David E. Hills, Chief Engineering Branch 1 Division of Reactor Safety Docket No. 50-461 License No. NPF-62

Enclosure:

Modification and 50.59 Inspection Document Request w/Enclosure (Information for Preparation Week and Information Available On-site During Inspection) cc w/encl:

Site Vice President - Clinton Power Station Plant Manager - Clinton Power Station Regulatory Assurance Manager - Clinton Power Station Chief Operating Officer and Senior Vice President Senior Vice President - Midwest Operations Senior Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director - Licensing and Regulatory Affairs Manager Licensing - Clinton, Dresden and Quad Cities Associate General Counsel Document Control Desk - Licensing Assistant Attorney General J. Klinger, State Liaison Officer, Illinois Emergency Management Agency Chairman, Illinois Commerce Commission DOCUMENT NAME: Ltr. 102108 CLINTON MOD 50 59 RFI LJJ.doc Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME DHills for Alan Dahbur:ls DHills DATE 10/21/08 10/21/08 OFFICIAL RECORD COPY

Letter to Mr. Charles G. Pardee from Mr. David E. Hills dated October 21, 2008.

SUBJECT:

CLINTON POWER STATION, INFORMATION REQUEST FOR AN NRC BIENNIAL PERMANENT MODIFICATIONS AND 10 CFR 50.59 (MOD/50.59)

BASELINE INSPECTION DISTRIBUTION Tamara Bloomer RidsNrrDorlLpl3-2 RidsNrrPMClinton Resource RidsNrrDirsIrib Resource Mark Satorius Kenneth OBrien Jared Heck Roland Lickus Carole Ariano Linda Linn DRSIII DRPIII Patricia Buckley Tammy Tomczak ROPreports@nrc.gov

MODIFICATIONS AND 50.59 INSPECTION DOCUMENT REQUEST INITIAL DOCUMENT REQUEST Enclosure 1

Inspection Report: 05000461/2009006(DRS)

Inspection Dates:

January 26 through January 30, 2009 and February 9 through February 13, 2009 Inspection Procedures:

IP 71111-17, Evaluation of changes, Tests or Experiments and Permanent Plant Modifications Lead Inspector:

Alan Dahbur, Lead Inspector (630) 829-9810 I.

Information Requested for In-Office Preparation Week The following information is requested by November 21, 2008, or sooner, to facilitate the selection of specific items that will be reviewed during the on-site inspection week. The team will select specific items from the information requested below and submit a list to your staff by December 12, 2008. We will request that certain items be made available to the regional office prior to the inspection by January 12, 2009. We request that the remaining items selected from the lists be available and ready for review on the first day of inspection. All requested information should cover the time frame from the receipt of information for the last Permanent Modification inspection on September 8, 2006, to the present. If you have any questions regarding this information, please call the team leader as soon as possible.

(1)

List of permanent plant modifications to risk significant systems, structures or components that are field work complete. (For the purpose of this inspection, permanent plant modifications include permanent: plant changes, design changes, set point changes, equivalency evaluations, suitability analyses, and commercial grade dedications).

The list should contain the number of each document, the title, the revision (or date), and the affected system. In addition to the list, please provide a description of each modification and a list of associated calculations and affected procedures.

(2)

List of all 10 CFR 50.59 completed evaluations involving: (a) calculations;

MODIFICATIONS AND 50.59 INSPECTION DOCUMENT REQUEST INITIAL DOCUMENT REQUEST Enclosure 2

(b) procedure revisions; (c) changes to the facility (modifications); (d) non-routine operating configurations; or (e) departures in methods of analyses.

This list should only include 50.59 evaluations for the following:

a. UFSAR changes that have been updated in accordance with 10 CFR 50.71(e)(4) since September 8, 2006;
b. Modifications that are field work complete; and
c. Changes to calculations (or initiation of new calculations) that have been Issued.

The list should contain the number and title of each document, a brief description of the change, and the corresponding number and type of the affected document (i.e., the modification or procedure to which the evaluation applies). The list should NOT include any evaluations in which prior NRC approval was sought and obtained.

(3)

List of all 10 CFR 50.59 changes that have been screened out as not requiring a full evaluation involving: (a) calculations; (b) procedure revisions; (c) changes to the facility (modifications); (d) non-routine operating configurations; or (e) departures in methods of analyses.

The list should contain the number and title of each document, a brief description of the change, and the corresponding number and type of the affected document (i.e., the modification or procedure to which the evaluation applies).

(4)

List of any modifications, procedure revisions, or UFSAR changes where it was determined that 10 CFR 50.59 did not apply.

(5)

List of calculation changes that have been issued for use.

(6)

List of corrective action documents (open and closed) that address plant permanent modification or 10 CFR 50.59 issues, concerns, or processes. These documents should also include corrective action documents associated with modification and MOD 50.59 change implementation.

The list should contain the number, title and revision (or date) of each document, the affected system and corresponding documentation (if applicable), and should be sorted in order of significance, (7)

Copies of procedures addressing the following: modifications, design changes, set point changes, equivalency evaluations or suitability analyses, commercial grade dedications, post-modification testing, 10 CFR 50.59 evaluation and screenings, and UFSAR updates.

MODIFICATIONS AND 50.59 INSPECTION DOCUMENT REQUEST INITIAL DOCUMENT REQUEST Enclosure 3

(8)

UFSAR updates submitted in accordance with 10 CFR 50.71(e)(4). Provide copies of the complete submittal.

(9)

Copy of the UFSAR change log (or a synopsis of changes). This should include all of the changes made to the UFSAR that were incorporated in the last 10 CFR 50.71(e)(4) submittal.

(10)

Name(s) and phone numbers for the regulatory and technical contacts.

(11)

Current management and engineering organizational chart.

II.

Information Requested to be Available Prior to Inspection (Request will be made by December 12, 2008 for availability of documents by January 12, 2009) or on First Day of Inspection (January 26, 2009)

(1)

Copies of all selected items from Section I. This includes copies of associated documents such as calculations, post-modification test packages, 10 CFR 50.59 evaluations or screenings, and any corrective action documents.

(2)

Copies of these documents do not need to be solely available to the team as long as the inspectors have easy and unrestrained access to them.

a. Updated Final Safety Analysis Report;
b. Original FSAR Volumes;
c. Original SER and Supplements;
d. FSAR Question and Answers;
e. Quality Assurance Plan;
f.

Technical Specifications;

g. Latest IPE/PRA Report;
h. Vendor Manuals; and
i.

The Latest 10 CFR 50.59 FSAR Update Submittal.

(3)

Please ensure that other supporting documents for the selected items have been located and are readily retrievable as the team will likely be requesting these documents during the inspections. Examples of supporting documents are:

a. Drawings supporting the modifications;
b. Procedures affected by the modifications; and
c. UFSAR change papers generated due to a 10 CFR 50.59 evaluation.

MODIFICATIONS AND 50.59 INSPECTION DOCUMENT REQUEST INITIAL DOCUMENT REQUEST Enclosure 4

(4)

Current management and engineering organizational chart.

III.

Information Requested to be provided throughout the inspection (1)

Copies of any corrective action documents generated as a result of the teams questions or queries during this inspection.

(2)

Copies of the list of questions submitted by the team members and the status/resolution of the information requested (provide daily during the inspection to each team member).

If you have questions regarding the information requested, please contact the team leader.