Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML031050221 | 19 December 2002 | Request for License Amendment Measurement Uncertainty Recapture Power Uprate, Enclosures 7 | |
ML031050264 | 19 December 2002 | Request for License Amendment Measurement Uncertainty Recapture Power Uprate, Enclosures 1 - 6 | Reactor Vessel Water Level Ultimate heat sink Anticipated operational occurrence Feedwater Controller Failure Fuel cladding Fire Protection Program Flow Induced Vibration Coast down |
ML031050209 | 19 December 2002 | Request for License Amendment Measurement Uncertainty Recapture Power Uprate | |
ML023530428 | 18 December 2002 | License Amendment, Issuance of Amendments | Grab sample |
TAC:MB5484 | 18 December 2002 | ||
ML023530595 | 18 December 2002 | Technical Specification for Amendment 235 & 177 | |
ML030060093 | 18 December 2002 | Letter Providing Information Sufficient to Supplement Georgia Power'S Prior Response to the Notice of Violation | |
ML023510265 | 11 December 2002 | November 2002 Monthly Operating Report for Edwin I. Hatch, Unit 1 | |
ML023440276 | 6 December 2002 | ISFSI Registration of Spent Fuel Cask Use | |
ML023440232 | 5 December 2002 | Emergency Implementing Procedure Revision | |
ML023470521 | 4 December 2002 | Technical Specification Revision to the Allowable Value for the Turbine Building Area Temperature High Primary Containment Isolation Setpoint | |
ML023450559 | 4 December 2002 | February 5, 2003 Generic Fundamentals Examination Section, Administration of Written Operator Licensing Exam | Generic Fundamentals Examination |
ML023450276 | 2 December 2002 | Technical Specifications Revision to Secondary Containment Access Door Surveillance | |
ML023330442 | 25 November 2002 | Spectrum Technologies, Part 21 Initial Notification - Cutler-Hammer A200 NEMA Size 1 Starters | MELLLA |
ML023290259 | 22 November 2002 | Technical Specifications, Correction, Removing Response Time Surveillance Requirement for Reactor Vessel Water Level low-3 Reactor Protection System (RPS) Trip & Reactor Vessel Steam Dome Pressure High RPS Trip | Reactor Vessel Water Level |
ML023260419 | 22 November 2002 | Correction Letter Issuance of Amendments 232 & 174 | Reactor Vessel Water Level |
ML023360069 | 22 November 2002 | Reportable Condition Stability Option III: Period Based Algorithm T Specification | |
ML023310569 | 22 November 2002 | Part 21 Report Re General Electric Identified the Stability Option III Period Based Detection Algorithm T-Min Specification Has a Defect | |
ML023250522 | 21 November 2002 | BWR VIP ISP - Application Date: August 9, 2002 | |
TAC:MB6106 | 21 November 2002 | ||
ML023300324 | 21 November 2002 | Third 10-Year Interval Inservice Inspection (ISI) Program, Response to Request for Additional Information for Requests for Relief RR-34 & RR-37 | |
ML023290162 | 18 November 2002 | Final Report, Stability Option III: Possible Successive Confirmation Count Resets - Not Reportable | MELLLA |
ML023250388 | 13 November 2002 | HI-STROM 100 Certificate of Compliance 1014 Report Pursuant to 10CFR 72.242(d) | Time of Discovery Liquid penetrant |
ML023170071 | 13 November 2002 | Report on the Status of Open TIAs Assigned to NRR | |
ML023120447 | 8 November 2002 | RAI: Hatch Relief Request RR-34, Revision 1, and RR-37 | |
TAC:MB5009 | 8 November 2002 | ||
ML023180246 | 8 November 2002 | Independent Spent Fuel Storage Installation Registration of Spent Fuel Cask Use | |
ML023180058 | 5 November 2002 | October 2002 Monthly Operating Report for Edwin I. Hatch Units 1 & 2 | |
ML023090220 | 4 November 2002 | Level 1, Revision 3i Standardized Plant Analysis Risk (SPAR) Model for Hatch 1 & 2 | Probabilistic Risk Assessment |
ML023160038 | 1 November 2002 | Editorial Correction to Technical Specification Table 3.3.1.1-1 | Reactor Vessel Water Level Scram Discharge Volume |
ML023090356 | 1 November 2002 | Third 10-Year Interval Inservice Inspection (ISI) Program, Revision of Relief Request RR-11 | Nondestructive Examination |
ML023090323 | 30 October 2002 | Third 10-Year Interval Inservice Testing Program, Revision to Existing Relief Request RR-V-11 | Stroke time |
ML023010288 | 25 October 2002 | Tech Spec Pages, Amendment No. 176, Turbine Bypass System Respones Time | |
ML023010066 | 25 October 2002 | Correction Letter Issuance of Amendments | |
IR 05000321/2002006 | 24 October 2002 | IR 05000321-02-006, IR 05000366-02-006, on 08/26/2002 - 08/30/2002 & 09/09/2002 - 09/13/2002, E. I. Hatch Nuclear Plant, Units 1 & 2; Safety System Design and Performance Capability Inspection | Stroke time Probabilistic Risk Assessment Significance Determination Process |
ML022980295 | 23 October 2002 | Request to Revise Technical Specifications: Correction to Quarterly Surveillance Extension Technical Specifications Page | |
ML022870008 | 16 October 2002 | Enclosures 1 & 2, Order for Interim Safeguards & Compensatory Measures for Dry Independent Spent Fuel Storage Installation & Regulatory Issuance Summary 2002-12D | |
ML023010320 | 15 October 2002 | Letter from NEI Transmitting Draft Revision D of NEI 00-01, Guidance for Post-Fire Safe Shutdown Analysis, a Marion, NEI, to J Hannon, NRC | Hot Short Safe Shutdown Thermoset |
ML022880461 | 8 October 2002 | September 2002 Monthly Operating Report for Edwin I. Hatch | |
ML022880452 | 8 October 2002 | Edwin Hatch Independent Spent Fuel Storage Installation Registration of Spent Fuel Cask Use | |
ML022890343 | 4 October 2002 | .3 to Emergency Implementing Procedure 73EP-EIP-023-0S, Core Damage Assessment. | Grab sample |
ML022820026 | 4 October 2002 | Third 10-Year Interval Inservice Inspection Program, Response to Request for Additional Information (RAI) | Weld Overlay |
ML022830278 | 1 October 2002 | Part 21.21 Report Involving Stability Option III: Possible Successive Confirmation Count Resets | |
ML022820032 | 1 October 2002 | Stability Option III: Possible Successive Confirmation Count Resets |