 Issue dateTitleTopic
ML03105022119 December 2002Request for License Amendment Measurement Uncertainty Recapture Power Uprate, Enclosures 7
ML03105026419 December 2002Request for License Amendment Measurement Uncertainty Recapture Power Uprate, Enclosures 1 - 6Reactor Vessel Water Level
Ultimate heat sink
Anticipated operational occurrence
Feedwater Controller Failure
Fuel cladding
Fire Protection Program
Flow Induced Vibration
Coast down
ML03105020919 December 2002Request for License Amendment Measurement Uncertainty Recapture Power Uprate
ML02353042818 December 2002License Amendment, Issuance of AmendmentsGrab sample
TAC:MB548418 December 2002
ML02353059518 December 2002Technical Specification for Amendment 235 & 177
ML03006009318 December 2002Letter Providing Information Sufficient to Supplement Georgia Power'S Prior Response to the Notice of Violation
ML02351026511 December 2002November 2002 Monthly Operating Report for Edwin I. Hatch, Unit 1
ML0234402766 December 2002ISFSI Registration of Spent Fuel Cask Use
ML0234402325 December 2002Emergency Implementing Procedure Revision
ML0234705214 December 2002Technical Specification Revision to the Allowable Value for the Turbine Building Area Temperature High Primary Containment Isolation Setpoint
ML0234505594 December 2002February 5, 2003 Generic Fundamentals Examination Section, Administration of Written Operator Licensing ExamGeneric Fundamentals Examination
ML0234502762 December 2002Technical Specifications Revision to Secondary Containment Access Door Surveillance
ML02333044225 November 2002Spectrum Technologies, Part 21 Initial Notification - Cutler-Hammer A200 NEMA Size 1 StartersMELLLA
ML02329025922 November 2002Technical Specifications, Correction, Removing Response Time Surveillance Requirement for Reactor Vessel Water Level low-3 Reactor Protection System (RPS) Trip & Reactor Vessel Steam Dome Pressure High RPS TripReactor Vessel Water Level
ML02326041922 November 2002Correction Letter Issuance of Amendments 232 & 174Reactor Vessel Water Level
ML02336006922 November 2002Reportable Condition Stability Option III: Period Based Algorithm T Specification
ML02331056922 November 2002Part 21 Report Re General Electric Identified the Stability Option III Period Based Detection Algorithm T-Min Specification Has a Defect
ML02325052221 November 2002BWR VIP ISP - Application Date: August 9, 2002
TAC:MB610621 November 2002
ML02330032421 November 2002Third 10-Year Interval Inservice Inspection (ISI) Program, Response to Request for Additional Information for Requests for Relief RR-34 & RR-37
ML02329016218 November 2002Final Report, Stability Option III: Possible Successive Confirmation Count Resets - Not ReportableMELLLA
ML02325038813 November 2002HI-STROM 100 Certificate of Compliance 1014 Report Pursuant to 10CFR 72.242(d)Time of Discovery
Liquid penetrant
ML02317007113 November 2002Report on the Status of Open TIAs Assigned to NRR
ML0231204478 November 2002RAI: Hatch Relief Request RR-34, Revision 1, and RR-37
TAC:MB50098 November 2002
ML0231802468 November 2002Independent Spent Fuel Storage Installation Registration of Spent Fuel Cask Use
ML0231800585 November 2002October 2002 Monthly Operating Report for Edwin I. Hatch Units 1 & 2
ML0230902204 November 2002Level 1, Revision 3i Standardized Plant Analysis Risk (SPAR) Model for Hatch 1 & 2Probabilistic Risk Assessment
ML0231600381 November 2002Editorial Correction to Technical Specification Table 3.3.1.1-1Reactor Vessel Water Level
Scram Discharge Volume
ML0230903561 November 2002Third 10-Year Interval Inservice Inspection (ISI) Program, Revision of Relief Request RR-11Nondestructive Examination
ML02309032330 October 2002Third 10-Year Interval Inservice Testing Program, Revision to Existing Relief Request RR-V-11Stroke time
ML02301028825 October 2002Tech Spec Pages, Amendment No. 176, Turbine Bypass System Respones Time
ML02301006625 October 2002Correction Letter Issuance of Amendments
IR 05000321/200200624 October 2002IR 05000321-02-006, IR 05000366-02-006, on 08/26/2002 - 08/30/2002 & 09/09/2002 - 09/13/2002, E. I. Hatch Nuclear Plant, Units 1 & 2; Safety System Design and Performance Capability InspectionStroke time
Probabilistic Risk Assessment
Significance Determination Process
ML02298029523 October 2002Request to Revise Technical Specifications: Correction to Quarterly Surveillance Extension Technical Specifications Page
ML02287000816 October 2002Enclosures 1 & 2, Order for Interim Safeguards & Compensatory Measures for Dry Independent Spent Fuel Storage Installation & Regulatory Issuance Summary 2002-12D
ML02301032015 October 2002Letter from NEI Transmitting Draft Revision D of NEI 00-01, Guidance for Post-Fire Safe Shutdown Analysis, a Marion, NEI, to J Hannon, NRCHot Short
Safe Shutdown
Thermoset
ML0228804618 October 2002September 2002 Monthly Operating Report for Edwin I. Hatch
ML0228804528 October 2002Edwin Hatch Independent Spent Fuel Storage Installation Registration of Spent Fuel Cask Use
ML0228903434 October 2002.3 to Emergency Implementing Procedure 73EP-EIP-023-0S, Core Damage Assessment.Grab sample
ML0228200264 October 2002Third 10-Year Interval Inservice Inspection Program, Response to Request for Additional Information (RAI)Weld Overlay
ML0228302781 October 2002Part 21.21 Report Involving Stability Option III: Possible Successive Confirmation Count Resets
ML0228200321 October 2002Stability Option III: Possible Successive Confirmation Count Resets