MONTHYEARNL-16-2274, Southern Nuclear Operating Company - Standard Emergency Plan Implementation Date2016-11-0202 November 2016 Southern Nuclear Operating Company - Standard Emergency Plan Implementation Date NL-16-0868, Edwin I. Hatch Nuclear Plant, and Vogtle Electric Generating Plant - Report of Changes to Emergency Plan2016-06-17017 June 2016 Edwin I. Hatch Nuclear Plant, and Vogtle Electric Generating Plant - Report of Changes to Emergency Plan ML12172A4142012-02-15015 February 2012 Transmittal of Final Exercise Report for the 02/02/2011, Partial Participation Plume Pathway Exercise of the Offsite Radiological Emergency Response Plant Site-Specific to Hatch NL-03-1661, Transmittal of Edwin I. Hatch Revised Emergency Plan Implementing Procedures 73EP-EIP-054-0, Version 6.0 & 73EP-EIP-073-0, Version 15.22003-08-11011 August 2003 Transmittal of Edwin I. Hatch Revised Emergency Plan Implementing Procedures 73EP-EIP-054-0, Version 6.0 & 73EP-EIP-073-0, Version 15.2 NL-03-1257, Emergency Implementing Procedure Revisions2003-06-10010 June 2003 Emergency Implementing Procedure Revisions NL-03-0939, Revised Epips, Including 73EP-EIP-004-0, Version 9.0, 73EP-EIP-005-0, Version 8.0, 73EP-EIP-018-0, Version 7.0, 73EP-EIP-023-0S, Version 0.4 & 73EP-EIP-073-0. Version 15.12003-04-30030 April 2003 Revised Epips, Including 73EP-EIP-004-0, Version 9.0, 73EP-EIP-005-0, Version 8.0, 73EP-EIP-018-0, Version 7.0, 73EP-EIP-023-0S, Version 0.4 & 73EP-EIP-073-0. Version 15.1 NL-03-0835, Emergency Implementing Procedure Revision, 73EP-RAD-001-0, Version 1.22003-04-18018 April 2003 Emergency Implementing Procedure Revision, 73EP-RAD-001-0, Version 1.2 NL-03-0322, Emergency Implementing Procedure Revisions2003-02-0404 February 2003 Emergency Implementing Procedure Revisions ML0234402322002-12-0505 December 2002 Emergency Implementing Procedure Revision ML0228903432002-10-0404 October 2002 .3 to Emergency Implementing Procedure 73EP-EIP-023-0S, Core Damage Assessment. ML0222801912002-08-0909 August 2002 Emergency Implementing Procedure Revision, Revision 3.0 to 73EP-EIP-022-0, Alternate Emergency Operations Facility (EOF) Activation ML0222801702002-08-0909 August 2002 Emergency Implementing Procedure Revision ML0220602152002-07-19019 July 2002 Emergency Implementing Procedures Revision ML0208605272002-03-20020 March 2002 Emergency Implementing Procedures Revision, Revision 8 to 73EP-EIP-004-0 and Revision 6 to 73EP-EIP-005-0 ML0203701192002-01-30030 January 2002 Emergency Implementing Procedure Revision 0.2 to 73EP-EIP-023-0S 2016-06-17
[Table view] Category:Letter
MONTHYEARIR 05000321/20230042024-01-31031 January 2024 Integrated Inspection Report 05000321/2023004 and 05000366/2023004 NL-24-0014, Revised Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical.2024-01-30030 January 2024 Revised Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical. ML24012A0652024-01-30030 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) IR 05000321/20233012024-01-17017 January 2024 NRC Operator License Examination Report 05000321/2023301 and 05000366/2023301 ML23341A2042024-01-12012 January 2024 Request for Additional Information Exemption Requests for Physical Barriers (EPID L-2023-LLE-0018 & L-2023-LLE-0021) ML23345A1312024-01-0303 January 2024 Withholding Letter - SNC Fleet - Physical Barriers Exemption (L-2023-LLE-0018 and L-2023-LLE-0021) NL-23-0889, Units 1 and 2 - License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water (RHRSW) and Plant Service Water (Psw) Systems2023-12-0606 December 2023 Units 1 and 2 - License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water (RHRSW) and Plant Service Water (Psw) Systems IR 05000321/20234022023-11-29029 November 2023 Security Baseline Inspection Report 05000321/2023402, 05000366/2023402, and 07200036/2023401 NL-23-0879, Request for Exemption from Security Event Notification Implementation2023-11-29029 November 2023 Request for Exemption from Security Event Notification Implementation NL-23-0841, Update to Notice of Intent to Pursue Subsequent License Renewal2023-11-20020 November 2023 Update to Notice of Intent to Pursue Subsequent License Renewal IR 05000321/20230112023-11-17017 November 2023 Biennial Problem Identification and Resolution Inspection Report 050003212023011 and 050003662023011 ML23324A4472023-11-14014 November 2023 302 Exam Approval Letter IR 05000321/20230032023-11-0202 November 2023 Integrated Inspection Report 05000321/2023003, and 05000366/2023003 IR 05000321/20234032023-10-26026 October 2023 Cyber Security Inspection Report 05000321/2023403 and 05000366/2023403 IR 05000321/20234012023-10-17017 October 2023 Security Baseline Inspection Report 05000321 2023401 and 05000366 2023401 ML23250A0472023-09-20020 September 2023 Request for Additional Information Regarding License Amendment Request to Relax Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts in Technical Specifications Table 1.1-1, Modes ML23241B0212023-09-12012 September 2023 Review of Quality Assurance Topical Report IR 05000321/20230052023-08-27027 August 2023 Updated Inspection Plan for Edwin I. Hatch Nuclear Plant, Units 1 & 2 - Report 05000321/2023005 and 05000366/2023005 NL-23-0658, Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal2023-08-11011 August 2023 Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal NL-23-0542, CFR 50.46 ECCS Evaluation Model Annual Report for 20222023-08-0909 August 2023 CFR 50.46 ECCS Evaluation Model Annual Report for 2022 IR 05000321/20230022023-08-0808 August 2023 Integrated Inspection Report 07200036/2023001, 05000321/2023002, and 05000366/2023002 NL-23-0624, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2023-08-0404 August 2023 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis ML23202A1122023-08-0202 August 2023 Units, 1 and 2; and Vogtle Units 1 and 2 - Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML23201A0292023-07-20020 July 2023 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection NL-23-0566, ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use2023-07-13013 July 2023 ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use NL-23-0555, Request for Exemption from Physical Barrier Requirement2023-07-0707 July 2023 Request for Exemption from Physical Barrier Requirement ML23178A0012023-06-27027 June 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000321 2023403 and 05000366 2023403 NL-23-0444, Quality Assurance Topical Report Submittal2023-06-15015 June 2023 Quality Assurance Topical Report Submittal NL-23-0457, ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use2023-06-12012 June 2023 ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use IR 05000321/20230102023-06-0909 June 2023 Focused Engineering Inspection Report 05000321 2023010 and 05000366 2023010 NL-23-0422, Inservice Inspection Program Owner'S Activity Report for Refueling Outage 2R272023-05-30030 May 2023 Inservice Inspection Program Owner'S Activity Report for Refueling Outage 2R27 NL-23-0383, SNC Response to Regulatory Issue Summary 2023-01:Preparation And.2023-05-19019 May 2023 SNC Response to Regulatory Issue Summary 2023-01:Preparation And. ML23136B2942023-05-19019 May 2023 Summary of May 02, 2023, Observation Public Meeting Held with Southern Nuclear Operating Company, Inc., Regarding a LAR for the Reactor Pressure Vessel Head Closure Bolts for Edwin I. Hatch Nuclear Plant, Units 1 and 2 NL-23-0372, Units 1 & 2, Joseph M. Farley Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant - Units 1 & 2, Annual Radiological Environmental Operating Reports for 20222023-05-10010 May 2023 Units 1 & 2, Joseph M. Farley Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant - Units 1 & 2, Annual Radiological Environmental Operating Reports for 2022 ML23123A2222023-05-0101 May 2023 Notification of Licensed Operator Initial Examination 05000321/2023301, and 05000366/2023301 IR 05000321/20230012023-04-26026 April 2023 Integrated Inspection Report 05000321/2023001 and 05000366/2023001 NL-23-0310, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20222023-04-25025 April 2023 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2022 NL-23-0019, GEN-ISI-ALT-2023-01, Request to Use Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2023-04-12012 April 2023 GEN-ISI-ALT-2023-01, Request to Use Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI NL-23-0263, Southern Nuclear Company Submittal of Drug and Alcohol Testing Errors Identified 10 CFR 26.719(c) 30-Day Report2023-04-0505 April 2023 Southern Nuclear Company Submittal of Drug and Alcohol Testing Errors Identified 10 CFR 26.719(c) 30-Day Report NL-23-0014, Southern Nuclear Operating Co Submittal of Report on Status of Decommissioning Funding2023-03-29029 March 2023 Southern Nuclear Operating Co Submittal of Report on Status of Decommissioning Funding NL-23-0208, Independent Spent Fuel Storage Installation ISFSI, Decommissioning Funding Plan Triennial Update2023-03-29029 March 2023 Independent Spent Fuel Storage Installation ISFSI, Decommissioning Funding Plan Triennial Update NL-23-0228, Nuclear Property Insurance Coverage as of April 1, 2023 and Licensee Guarantees of Payment of Deferred Premiums (10 CFR 140.21)2023-03-20020 March 2023 Nuclear Property Insurance Coverage as of April 1, 2023 and Licensee Guarantees of Payment of Deferred Premiums (10 CFR 140.21) NL-23-0179, National Pollutant Discharge Elimination System (NPDES) Permit Renewal2023-03-13013 March 2023 National Pollutant Discharge Elimination System (NPDES) Permit Renewal ML23065A1092023-03-0808 March 2023 Correction of Relief Request HNP-ISI-RR-05-02 Allowing to Continue Operation with a Flaw Indication on One Reactor Pressure Vessel Closure Bolt Until December 31, 2025 ML23053A2182023-03-0303 March 2023 Correction of Amendment Nos. 321 and 266 Regarding License Amendment Request to Revise the (National Fire Protection Association) NFPA-805 Fire Protection Program IR 05000321/20220062023-03-0101 March 2023 Annual Assessment Letter Edwin I. Hatch Nuclear Plant, Units 1 and 2 - NRC Inspection Report 05000321/2022006 and 05000366/2022006 NL-23-0101, Cycle 28 Core Operating Limits Report Version 12023-02-23023 February 2023 Cycle 28 Core Operating Limits Report Version 1 ML23034A2462023-02-21021 February 2023 Audit Summary for License Amendment Request to Relax Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs ML22363A3932023-02-15015 February 2023 Issuance of Amendments Nos. 321 and 266, Regarding License Amendment Request to Revise the (National Fire Protection Association) NFPA-805 Fire Protection Program ML22346A1482023-02-0909 February 2023 Issuance of Amendments 320 and 265, Regarding LAR to Revise Technical Specifications to Adopt TSTF-208 and Administrative Correction for Duplicate Technical Specifications 3.4.10 2024-01-31
[Table view] |
Text
Lewis Sumner Southern Nuclear Vice President Operating Company, Inc.
Hatch Project Support 40 Inverness Parkway Post Office Box 1295 Birmingham, Alabama 35201 Tel 205 992.7279 Fax 205 992 0341 4 A SSOUTHERNNi COMPANY Energy to Serve Your Wo rld December 5, 2002 Docket Nos. 50-321 HL-6334 50-366 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Edwin I. Hatch Nuclear Plant Emergency Implementing Procedure Revision Ladies and Gentlemen:
In accordance with 10 CFR 50, Appendix E, Section V, Southern Nuclear Operating Company hereby submits the following revision to the Plant Hatch Emergency Implementing Procedure (EIP):
EIP No. Version Effective Date 73EP-EIP-064-0 4.0 11/11/02 This revision incorporates changes to enhance information flow to offsite agencies and other editorial changes.
By copy of this letter, Mr. L. A. Reyes, NRC Region II Administrator, will receive two copies of the revised procedure.
Should you have any questions in this regard, please contact this office.
Respectfully submitted, H. L. Sumner, Jr.
CKB/eb
Enclosure:
73EP-EIP-064-0, Emergency Operations Facility Activation
'1%cl5
U.S. Nuclear Regulatory Commission Page 2 December 5, 2002 cc: Southern Nuclear Operating Company (w/o)
Mr. P. H. Wells, Nuclear Plant General Manager SNC Document Management (R-Type A02.001)
U.S. Nuclear Remulatory Commission, Washington, D.C.(w/o)
Mr. Joseph Colaccino, Project Manager - Hatch U.S. Nuclear Regulatory Commission, Region II Mr. L. A. Reyes, Regional Administrator (with 2 copies)
Mr. J. T. Munday, Senior Resident Inspector - Hatch (w/o)
HL-6334
SOUTHERN NUCLEAR DOCUMENT TYPE: PAGE PLANT E.I. HATCH EMERGENCY PREPAREDNESS PROCEDURE 1 OF 6 DOCUMENT TITLE: DOCUMENT NUMBER: REVISIONNERSION EMERGENCY OPERATIONS FACILITY ACTIVATION 73EP-EIP-064-0 NO:
4.0 EXPIRATION APPROVALS: EFFECTIVE DATE: DEPARTMENT MANAGER JCL DATE 11/7/2002 DATE:
11/11/2002 N/A NPGM/POAGM/PSAGM JAB DATE 11/11/2002 1.0 OBJECTIVE This procedure addresses and delineates the actions required to bring the Emergency Operations Facility (EOF) to a state of readiness and provides guidelines for manning the facility. The Emergency Operations Facility (EOF) is an onsite facility for the management of overall licensee emergency response (including coordination with federal, state, and local officials, coordination of radiological and environmental assessments, and determination of recommended public protective actions).
TABLE OF CONTENTS Section Title Paae 2.0 APPLICABILITY 1
3.0 REFERENCES
1 4.0 REQUIREMENTS 2 5.0 PRECAUTIONS/LIMITATIONS 2 6.0 PREREQUISITES 2 7.0 PROCEDURE 3 2.0 APPLICABILITY This procedure is applicable to all personnel who would respond to the EOF during an emergency condition, drill, AND/OR exercises.
3.0 REFERENCES
3.1 Edwin I. Hatch Nuclear Plant, Unit 1 and 2 Emergency Plan 3.2 10AC-MGR-006-0, Hatch Emergency Plan 3.3 73EP-EIP-015-0, Offsite Dose Assessment 3.4 60AC-HPX-007-0, Radiation Exposure Limits 3.5 Emergency Response Position Matrix MGR-0002 Rev. 8
SOUTHERN NUCLEAR PLANT E.I. HATCH IPAGE 22 OF 6 DOCUMENT TITLE: DOCUMENT NUMBER: REVISIONNERSION EMERGENCY OPERATIONS FACILITY ACTIVATION 73EP-EIP-064-0 NO:
4.0 3.6 FULL SIZE FORMS
"* TRN-0072, Plant Parameters
"* TRN-0073, Major Events/Inop Equipment
"* TRN-0085, Field Team Data
"* TRN-0086, Meteorological/Radiological Data
"* TRN-0088, EOF Communications Checks
"* TRN-0153, Emergency Response Facility Sign-In Sheet
"* TRN-0154, Protective Action Status 4.0 REQUIREMENTS 4.1 PERSONNEL REQUIREMENTS The first person responding to the EOF will be responsible for initiating this procedure. The EOF Manager OR his/her designee, upon arrival, will be responsible for ensuring completion of this procedure.
4.2 MATERIAL AND EQUIPMENT N/A - Not applicable to this procedure.
4.3 SPECIAL REQUIREMENTS The EOF will be placed in standby for an Alert emergency and must be activated at a Site Area Emergency, General Emergency. Standby denotes the EOF is ready to be activated and personnel and equipment are ready to function. All or portions of this procedure will be implemented as appropriate based on the desired function of the EOF. Activation is achieved WHEN, in the judgement of the EOF Manager, staffing and equipment are sufficient to carry out the purpose of the EOF.
5.0 PRECAUTIONS/LIMITATIONS N/A - Not applicable to this procedure 6.0 PREREQUISITES Adequate resources shall be in place for the EOF to perform its intended function PRIOR to activation. Adequate resources are defined as minimum staffing per Table B-1 of the Emergency Plan and as described in step 7.3 of this procedure.
MGR-0001 Rev. 3
SOUTHERN NUCLEAR
-PLANT E.t. HATCH PAGE 3 OF 6 DOCUMENT TITLE: DOCUMENT NUMBER: REVISIONNERSION EMERGENCY OPERATIONS FACILITY ACTIVATION 73EP-EIPLO64-0 NO:
4.0 I REFERENCE I 7.0 PROCEDURE NOTE This procedure is intended to be guidance for activating the EOF in emergency situations. Deviations from the listed sequence are permitted WHEN plant conditions warrant a more expedient order of completion.
7.1 Obtain the necessary keys from the EOF key box to open the EOF doors and cabinets.
7.2 Establish personnel accountability of EOF emergency responders. Sign-in will be established at the west entrance of the EOF and all personnel will sign in/out on form TRN-01 53, Emergency I
Response Facility Sign-In Sheet. Emergency response position badges may be obtained and worn by EOF emergency responders to identify their emergency response position. The badges may be obtained from the EOF badge cabinet located at the west entrance to the EOF, if available. I 7.3 The minimum functions and staffing required for EOF activation are listed below. The EOF Manager may activate the EOF WHEN these functions and personnel are available (minimum staffing as defined in Table B-1 of the Hatch Emergency Plan):
TASK/FUNCTION PERSONNEL # REQ'D.
Offsite interface in the EOF EOF Manager (1)
Dose Assessment support to Emergency Dose Assessment (2)
Director Manager/Staff Offsite monitoring Health Physics or Chemistry (4)
Technicians (sent from OSC)
MGR-0001 Rev. 3
SOUTHERN NUCLEAR PLANT E.I. HATCH PAGE 4 OF 6 DOCUMENT TITLE: DOCUMENT NUMBER: REVISIONNERSION EMERGENCY OPERATIONS FACILITY ACTIVATION 73EP-EIP-064-0 NO:
1 4.0 7.4 Set up Dose Assessment computer in accordance with 73EP-EIP-015-0.
7.5 Ensure the HVAC filter system is activated by pushing the red button located on the EOF HVAC panel located in the Simulator Building (2nd floor) HVAC room.
7.6 Synchronize all clocks with Control Room time.
7.7 Upon completion of the above steps, the EOF Manager will declare the EOF activated and inform the Control Room, Emergency Director, OSC Manager, TSC Manager and Corporate Emergency Operations Center (CEOC) of the activation status. Note any exceptions in staffing and resources, as appropriate.
MGR-0001 Rev. 3
SOU-'HERN NUCLEAR "IPLANT E.I. HATCH PAGE 5 OF 6 DOCUMENT TITLE: DOCUMENT NUMBER: REVISIONNERSION EMERGENCY OPERATIONS FACILITY ACTIVATION 73EP-EIP-064-0 NO:
4.0 7.8 Additional support staff personnel may be utilized as necessary to support the EOF. Refer to the Emergency Response Position Matrix for a listing of qualified emergency responders for all positions. The following is a listing of the EOF support positions:
"* Operations Advisor
"* Support Coordinator
"* Security Manager
"* Dose Assessment Staff
"* Administrative Support
"* General Support
"* License Support
"* Facility Communicator/Recorders 7.9 The following additional steps may be performed after EOF activation:
7.9.1 Ensure the physical arrangement of the facility is similar to the typical EOF layout posted in the EOF. This activity includes arrangement of facility status boards, set-up of facility telephones, fax machines, copy machines and ensuring the P.A. system is on and audible.
The items for arrangement in the EOF are located in the following areas:
I ITEM LOCATION Status boards Behind the false walls in classrooms 174 and 182 of the EOF EOF Telephones Cabinets on north wall of EOF rooms Mats (to cover telephone cords) Top of cabinets on north wall of EOF rooms Fax Machines (2)
Copy Machine EP office (adjacent to the EOF)
Training & EP Manager's office I
7.9.2 Ensure communications checks are performed in accordance with form TRN-0088, EOF Communications Checks, THEN establish communications loops as applicable personnel become available.
MGR-0001 Rev. 3
SOUTHERN NUCLEAR PAGE 6 OF 6 PLANT E.I. HATCH DOCUMENT TITLE: DOCUMENT NUMBER: REVISIONNERSION EMERGENCY OPERATIONS FACILITY ACTIVATION 73EP-EIP-064-0 NO:
4.0 7.9.3 'Check the status boards for similarity to TRN-0072, Plant Parameters, TRN-0073, Major Events/INOP Equipment, TRN-0085, Field Team Data, TRN-0086, Meteorological/Radiological Data and TRN-0154, Protective Action Status. Additional copies of the status board sheets are available in the EOF Storage Room.
7.9.4 Ensure that supervisory emergency response personnel are starting a log.
7.9.5 Assess the adequacy of supplies, equipment AND documents. IF additional supplies/equipment/documents are needed, notify the EOF Support Coordinator Supervisor for assistance.
7.9.6 Ensure that Health Physics (HP) personnel conduct habitability surveys upon facility setup, as necessary AND as conditions warrant.
7.9.7 Ensure radiological monitoring is established for the EOF, as necessary. Radiological monitoring for EOF responders will be established at the EOF entrance by Health Physics, as necessary.
7.10 Radiological precautions for the EOF will be consistent with normal plant procedures. Habitability of the facility will be based on the ability to maintain exposures of individuals within the Federal limits for Total Effective Dose Equivalent (TEDE) and Total Organ Dose Equivalent (TODE) as described in 60AC-HPX-007-0, Radiation Exposure Limits.
7.11 Restrictions on eating, drinking AND smoking will be implemented whenever radiological conditions warrant (e.g., airborne radioactivity, surface contamination, abnormal radiation levels OR significant potential for such conditions exists).
7.12 The decision to evacuate the EOF will be based on the following factors:
7.12.1 Facility dose rates versus available dose margins (TEDE and TODE) of EOF emergency responders.
7.12.2 Concentration of airborne activity versus type of radiological protection taken (i.e.,
respirators, tracking of DAC - hours, etc).
7.12.3 Duration of the event.
7.12.4 Length of time needed to re-establish activities at the alternate EOF versus the importance of EOF activities currently in progress.
7.13 IF the decision is made to evacuate the EOF, the EOF Manager will determine those personnel needed to continue the performance of EOF activities AND relocate to the alternate EOF as outlined in 73EP-EIP-022-0, Alternate EOF Activation. Other EOF personnel may be directed to another emergency facility, rescheduled to return at a later time AND/OR evacuated from plant site.
MGR-0001 Rev. 3