ML023260419

From kanterella
Jump to navigation Jump to search

Correction Letter Issuance of Amendments 232 & 174
ML023260419
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 11/22/2002
From: Joseph Colaccino
NRC/NRR/DLPM/LPD2
To: Sumner H
Southern Nuclear Operating Co
COLACCINO J 415-2276
References
TAC MB2965, TAC MB2967
Download: ML023260419 (3)


Text

November 22, 2002 Mr. H. L. Sumner, Jr.

Vice President - Nuclear Hatch Project Southern Nuclear Operating Company, Inc.

Post Office Box 1295 Birmingham, Alabama 35201-1295

SUBJECT:

CORRECTION LETTER TO EDWIN I. HATCH NUCLEAR PLANT, UNITS 1AND 2 RE: ISSUANCE OF AMENDMENTS (TAC NOS. MB2965 AND MB2967)

Dear Mr. Sumner:

On July 12, 2002, the Commission issued Amendment No. 232 to Renewed Facility Operating License DPR-57 and Amendment No. 174 to Renewed Facility Operating License NPF-5 for the Edwin I. Hatch Nuclear Station, Units 1 and 2. However, Technical Specification (TS)

Page 3.3-8 for Unit 2 was issued with the response time surveillance requirement for the reactor vessel water level low-3 reactor protection system (RPS) trip and the reactor vessel steam dome pressure high RPS trip inadvertently put back as a requirement for the two aforementioned functions. A correction has been made to TS Page 3.3-8 removing these two requirements. This correction is purely editorial. The correct page is enclosed.

We regret any inconvenience this oversight may have caused. If you have any questions on this action, please call me at 301-415-2753.

Sincerely,

/RA/

Joseph Colaccino, Project Manager, Section 1 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-321 and 50-366

Enclosure:

Technical Specification Page 3.3-8 cc w/encl: See next page

ML023260419 OFFICE PDII-1/PM PDII-1/LA PDII-1/SC NAME JColaccino CHawes JNakoski DATE 11/22/02 11/22/02 11/22/02 Edwin I. Hatch Nuclear Plant Charles A. Patrizia, Esquire cc: Paul, Hastings, Janofsky & Walker Mr. Ernest L. Blake, Jr. 10th Floor Shaw, Pittman, Potts 1299 Pennsylvania Avenue and Trowbridge Washington, DC 20004-9500 2300 N Street, NW.

Washington, DC 20037 Chairman Appling County Commissioners Mr. D. M. Crowe County Courthouse Manager, Licensing Baxley, Georgia 31513 Southern Nuclear Operating Company, Inc. Mr. J. D. Woodard P. O. Box 1295 Executive Vice President Birmingham, Alabama 35201-1295 Southern Nuclear Operating Company, Inc.

Resident Inspector P. O. Box 1295 Plant Hatch Birmingham, Alabama 35201-1295 11030 Hatch Parkway N.

Baxley, Georgia 31531 Mr. P. W. Wells General Manager, Edwin I. Hatch Mr. Charles H. Badger Nuclear Plant Office of Planning and Budget Southern Nuclear Operating Room 610 Company, Inc.

270 Washington Street, SW. U.S. Highway 1 North Atlanta, Georgia 30334 P. O. Box 2010 Baxley, Georgia 31515 Harold Reheis, Director Department of Natural Resources Mr. L. M. Bergen 205 Butler Street, SE., Suite 1252 Resident Manager Atlanta, Georgia 30334 Oglethorpe Power Corporation Edwin I. Hatch Nuclear Plant Steven M. Jackson P. O. Box 2010 Senior Engineer - Power Supply Baxley, Georgia 31515 Municipal Electric Authority of Georgia 1470 Riveredge Parkway, NW Atlanta, Georgia 30328-4684