Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML13267A27423 September 2013NRC Office of Investigations Case No. 1-2012-041
ML14010A03720 September 2013Draft Written Exam (Folder 2)Hot Short
Safe Shutdown
Unanalyzed Condition
Shutdown Margin
Slow transfer
Reserve Station Service Transformer
Condition Adverse to Quality
Pressure Boundary Leakage
Continuous fire watch
Fire Protection Program
Fire Watch
Hourly Fire Watch
Power change
ML13275A24019 September 2013Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 6.8.4.F for Peak Calculated Containment Internal Pressure
IR 05000336/201301016 September 2013IR 05000336-13-010, 05000423-13-010; 07/22/2013 - 08/08/2013; Dominion Nuclear Connecticut, Inc.; Millstone Power Station Units 2 and 3; Triennial Fire Protection Baseline InspectionHot Short
Safe Shutdown
Fire Barrier
Reserve Station Service Transformer
Operator Manual Action
Emergency Lighting
B.5.b
Significance Determination Process
Time Critical Operator Action
Reasonable doubt of operability
Fire Protection Program
Fire Watch
ML13259A04312 September 2013Response to March 12, 2012 Information Request Regarding Seismic Aspects of Recommendation 2.1 - 1.5 Year Response for CEUS SitesSafe Shutdown Earthquake
Fukushima Dai-Ichi
IR 05000245/201300912 September 2013IR 05000245-13-009, on 6/4/13 - 8/2/13, Dominion Nuclear Connecticut, Inc., Millstone Power Station Unit 1, Inspection Review of Operations, Management Oversight Maintenance, CAP Implementation, Fire Protection, Support Activities in SafstoAnnual Radiological Environmental Operating Report
ML14010A03411 September 2013NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2)Boric Acid
Job Performance Measure
Downpower
TAC:MF396810 September 2013
TAC:MF370710 September 2013
ML13260A2519 September 2013Day Report for Emergency Core Cooling System Model Changes Pursuant to the Requirements of 10 CFR 50.46
TAC:U018743 September 2013
ML14010A0363 September 2013Draft - Outlines (Folder 2)Downpower
IR 05000336/20130063 September 2013Mid-Cycle Performance Review and Inspection Plan 2013 (ROP-14) - Millstone Power Station Units 2 and 3 (Report 05000336-13-006 and 05000423-13-006)License Renewal
ML13234A50328 August 2013Nuclear Regulatory Commission Audits of Licensee Responses to Mitigation Strategies Order EA-12-049FLEX
ML13239A31826 August 2013Requalification Program Inspection - Millstone Power Station Unit 3
ML13219B06726 August 2013Extension of Branch Chief Reassignment
ML13233A36423 August 2013Establishment of Mitigation Strategies Directorate for Nuclear Regulatory Commission Review of Order EA-12-049Fukushima Dai-Ichi
ML13242A01423 August 2013Connecticut, Inc. & Millstone Power Station Units 2 and 3 Six-Month Status Report in Response to Letter Dated March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel PoolSpent Fuel Pool Instrumentation
ML13242A01123 August 2013Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049)Boric Acid
Tornado Missile
Safe Shutdown Earthquake
Hydrostatic
FLEX
ML13233A28422 August 2013Request for Additional Information Regarding Relief Request RR-04-15Dissimilar Metal Weld
ML13238A25321 August 2013Notification of Potential Part 21 Report - Foxboro Power Supply Potential Failures Due to Defective the Wraps and Holders
ML13234A23014 August 2013LER 13-S06-00 for Millstone Power Station Unit 3, Unescorted Access Granted Improperly
ML13228A39912 August 2013Letter to Holders of Independent Spent Fuel Storage Installation (ISFSI) Licenses Re Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit - Rin 3150-AI64 (NRC-2009-0163) EA-02-109
ML13225A55712 August 2013Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit
ML13218A3108 August 2013Request for Additional Information Regarding Amendment for a Revised Calculated Peak Containment Internal Pressure
ML13224A2476 August 2013Isfsis, Submittal of Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program - Rev. 18
ML13220A6236 August 2013NRC Office of Investigations Case No. 1-2012-033
IR 05000336/20130036 August 2013IR 05000336-13-003, 05000423-13-003, on 04/01/2013-06/30/2013, Millstone, Units 2 and 3, Refueling and Other Outage Activities, Follow-Up of Events and Notices of Enforcement Discretion, Maintenance Risk Assessments and Emergent Work ControBoric Acid
Time of Discovery
High Radiation Area
Non-Destructive Examination
Offsite Dose Calculation Manual
Fire Barrier
Water Inventory Control
Time to boil
Internal Flooding
Enforcement Discretion
Coatings
Reserve Station Service Transformer
Nondestructive Examination
Temporary Modification
Multiple Spurious Operation
Functionality Assessment
Significance Determination Process
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Operability Determination
Time Critical Operator Action
Liquid penetrant
Through-Wall Leak
DM weld
Scaffolding
Power change
Downpower
Unidentified leakage
IR 05000245/20130036 August 2013IR 05000336-13-003, 05000423-13-003, on 04/01/2013-06/30/2013, Millstone, Units 2 and 3, Refueling and other Outage Activities, Follow-Up of Events and Notices of Enforcement Discretion, Maintenance Risk Assessments and Emergent Work ControlEnforcement Discretion
ML13161A2862 August 2013Acknowledgement Letter for 60 Day Response to Issuance of Seismic Guidance Related to the NTTF Recommendation 2.1, Seismic ReevaluationsProbabilistic Risk Assessment
Earthquake
ML13213A3211 August 2013Senior Reactor and Reactor Operator Initial License Examinations Millstone Unit 3
ML13206A4271 August 2013Online Reference Portal for Nuclear Regulatory Commission Review of Fukushima Near Term Task Force Related Documents
ML13219A1091 August 2013Response to Request for Additional Information Regarding License Amendment Request for Changes to Technical Specification 3/4.7.11, Ultimate Heat Sink.Ultimate heat sink
GOTHIC
ML13220A0191 August 2013Proposed Alternative Request RR-04-16 for the Use of Encoded Phased Array Ultrasonic Examination Techniques (Paut) in Lieu of RadiographyNondestructive Examination
Dissimilar Metal Weld
ML13233A3181 August 2013Inservice Inspection Program - Owner'S Activity Report, Refueling Outage 15
TAC:MF25201 August 2013
ML13218A26031 July 2013Information in Support of License Renewal Commitment #14 Program Description for Alloy 600 Aging Management ProgramBoric Acid
Weld Overlay
Nondestructive Examination
Aging Management
Liquid penetrant
Dissimilar Metal Weld
DM weld
ML13218A26431 July 2013Information in Support of License Renewal Commitment #13 Program Description for Reactor Vessel Internals InspectionsAging Management
EVT-1
Flow Induced Vibration
IR 05000336/201340531 July 2013IR 05000336-13-405 and 05000423-13-405, 06/22/13 - 06/26/13, Millstone Power Station; Temporary Instruction (Ti) 2515/186, Inspection of Procedures and Processes for Responding to Potential Aircraft Threats, Letter OnlyAffidavit
IR 05000245/201340531 July 2013IR 05000336-13-405 and 05000423-13-405, 06/22/13 - 06/26/13, Millstone Power Station; Temporary Instruction (TI) 2515/186, Inspection of Procedures and Processes for Responding to Potential Aircraft Threats, Letter OnlyAffidavit
ML13207A25930 July 20137/17/2013 - Summary of Meeting with Dominion Nuclear Connecticut, Inc. and Areva to Discuss Upgrade to Areva Standard CE14 Htp Fuel Assembly.7/17/2013 - Summary of Meeting with Dominion Nuclear Connecticut, Inc. and Areva to Discuss UpgradeExemption Request
ML13192A24030 July 2013Acceptance Review Results Regarding Ultimate Heat Sink License Amendment RequestsUltimate heat sink
ML13213A02530 July 2013Proto-Power Calculation 98-119, Revision B - Analysis of MP2 EDG Heat Exchanger Thermal Performance Test ResultsUltimate heat sink
ML13213A02430 July 2013Response to Request for Additional Information Regarding License Amendment Request for Changes to Technical Specification 3/4.7.11, Ultimate Heat Sink.Ultimate heat sink
ML13213A01526 July 2013Response to Request for Additional Information to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)High Radiation Area
Locked High Radiation Area
FLEX
Spent Fuel Pool Instrumentation
ML13207A23922 July 2013June 5, 2013, NRC Generic Fundamentals Examination Results for Millstone Power Station (Cover Letter)Generic Fundamentals Examination
ML13204A03519 July 2013Response to Request for Additional Information Regarding License Amendment Request for Changes to Technical Specification 4/4.7.11, Ultimate Heat SinkUltimate heat sink
ML13206A08819 July 2013Response to NRC Regulatory Issue Summary 2013-06 Preparation and Scheduling of Operator Licensing ExaminationsGeneric Fundamentals Examination
ML13197A40118 July 2013Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3/4.7.11 Ultimate Heat Sink.Ultimate heat sink
ML13192A10218 July 2013Closure Evaluation for 30-Day Report for Emergency Core Cooling System Model Changes Pursuant to the Requirements of 10 CFR 50.46Loop seal
Fuel cladding