Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML13267A274 | 23 September 2013 | NRC Office of Investigations Case No. 1-2012-041 | |
ML14010A037 | 20 September 2013 | Draft Written Exam (Folder 2) | Hot Short Safe Shutdown Unanalyzed Condition Shutdown Margin Slow transfer Reserve Station Service Transformer Condition Adverse to Quality Pressure Boundary Leakage Continuous fire watch Fire Protection Program Fire Watch Hourly Fire Watch Power change |
ML13275A240 | 19 September 2013 | Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 6.8.4.F for Peak Calculated Containment Internal Pressure | |
IR 05000336/2013010 | 16 September 2013 | IR 05000336-13-010, 05000423-13-010; 07/22/2013 - 08/08/2013; Dominion Nuclear Connecticut, Inc.; Millstone Power Station Units 2 and 3; Triennial Fire Protection Baseline Inspection | Hot Short Safe Shutdown Fire Barrier Reserve Station Service Transformer Operator Manual Action Emergency Lighting B.5.b Significance Determination Process Time Critical Operator Action Reasonable doubt of operability Fire Protection Program Fire Watch |
ML13259A043 | 12 September 2013 | Response to March 12, 2012 Information Request Regarding Seismic Aspects of Recommendation 2.1 - 1.5 Year Response for CEUS Sites | Safe Shutdown Earthquake Fukushima Dai-Ichi |
IR 05000245/2013009 | 12 September 2013 | IR 05000245-13-009, on 6/4/13 - 8/2/13, Dominion Nuclear Connecticut, Inc., Millstone Power Station Unit 1, Inspection Review of Operations, Management Oversight Maintenance, CAP Implementation, Fire Protection, Support Activities in Safsto | Annual Radiological Environmental Operating Report |
ML14010A034 | 11 September 2013 | NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2) | Boric Acid Job Performance Measure Downpower |
TAC:MF3968 | 10 September 2013 | ||
TAC:MF3707 | 10 September 2013 | ||
ML13260A251 | 9 September 2013 | Day Report for Emergency Core Cooling System Model Changes Pursuant to the Requirements of 10 CFR 50.46 | |
TAC:U01874 | 3 September 2013 | ||
ML14010A036 | 3 September 2013 | Draft - Outlines (Folder 2) | Downpower |
IR 05000336/2013006 | 3 September 2013 | Mid-Cycle Performance Review and Inspection Plan 2013 (ROP-14) - Millstone Power Station Units 2 and 3 (Report 05000336-13-006 and 05000423-13-006) | License Renewal |
ML13234A503 | 28 August 2013 | Nuclear Regulatory Commission Audits of Licensee Responses to Mitigation Strategies Order EA-12-049 | FLEX |
ML13239A318 | 26 August 2013 | Requalification Program Inspection - Millstone Power Station Unit 3 | |
ML13219B067 | 26 August 2013 | Extension of Branch Chief Reassignment | |
ML13233A364 | 23 August 2013 | Establishment of Mitigation Strategies Directorate for Nuclear Regulatory Commission Review of Order EA-12-049 | Fukushima Dai-Ichi |
ML13242A014 | 23 August 2013 | Connecticut, Inc. & Millstone Power Station Units 2 and 3 Six-Month Status Report in Response to Letter Dated March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool | Spent Fuel Pool Instrumentation |
ML13242A011 | 23 August 2013 | Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049) | Boric Acid Tornado Missile Safe Shutdown Earthquake Hydrostatic FLEX |
ML13233A284 | 22 August 2013 | Request for Additional Information Regarding Relief Request RR-04-15 | Dissimilar Metal Weld |
ML13238A253 | 21 August 2013 | Notification of Potential Part 21 Report - Foxboro Power Supply Potential Failures Due to Defective the Wraps and Holders | |
ML13234A230 | 14 August 2013 | LER 13-S06-00 for Millstone Power Station Unit 3, Unescorted Access Granted Improperly | |
ML13228A399 | 12 August 2013 | Letter to Holders of Independent Spent Fuel Storage Installation (ISFSI) Licenses Re Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit - Rin 3150-AI64 (NRC-2009-0163) EA-02-109 | |
ML13225A557 | 12 August 2013 | Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit | |
ML13218A310 | 8 August 2013 | Request for Additional Information Regarding Amendment for a Revised Calculated Peak Containment Internal Pressure | |
ML13224A247 | 6 August 2013 | Isfsis, Submittal of Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program - Rev. 18 | |
ML13220A623 | 6 August 2013 | NRC Office of Investigations Case No. 1-2012-033 | |
IR 05000336/2013003 | 6 August 2013 | IR 05000336-13-003, 05000423-13-003, on 04/01/2013-06/30/2013, Millstone, Units 2 and 3, Refueling and Other Outage Activities, Follow-Up of Events and Notices of Enforcement Discretion, Maintenance Risk Assessments and Emergent Work Contro | Boric Acid Time of Discovery High Radiation Area Non-Destructive Examination Offsite Dose Calculation Manual Fire Barrier Water Inventory Control Time to boil Internal Flooding Enforcement Discretion Coatings Reserve Station Service Transformer Nondestructive Examination Temporary Modification Multiple Spurious Operation Functionality Assessment Significance Determination Process Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Operability Determination Time Critical Operator Action Liquid penetrant Through-Wall Leak DM weld Scaffolding Power change Downpower Unidentified leakage |
IR 05000245/2013003 | 6 August 2013 | IR 05000336-13-003, 05000423-13-003, on 04/01/2013-06/30/2013, Millstone, Units 2 and 3, Refueling and other Outage Activities, Follow-Up of Events and Notices of Enforcement Discretion, Maintenance Risk Assessments and Emergent Work Control | Enforcement Discretion |
ML13161A286 | 2 August 2013 | Acknowledgement Letter for 60 Day Response to Issuance of Seismic Guidance Related to the NTTF Recommendation 2.1, Seismic Reevaluations | Probabilistic Risk Assessment Earthquake |
ML13213A321 | 1 August 2013 | Senior Reactor and Reactor Operator Initial License Examinations Millstone Unit 3 | |
ML13206A427 | 1 August 2013 | Online Reference Portal for Nuclear Regulatory Commission Review of Fukushima Near Term Task Force Related Documents | |
ML13219A109 | 1 August 2013 | Response to Request for Additional Information Regarding License Amendment Request for Changes to Technical Specification 3/4.7.11, Ultimate Heat Sink. | Ultimate heat sink GOTHIC |
ML13220A019 | 1 August 2013 | Proposed Alternative Request RR-04-16 for the Use of Encoded Phased Array Ultrasonic Examination Techniques (Paut) in Lieu of Radiography | Nondestructive Examination Dissimilar Metal Weld |
ML13233A318 | 1 August 2013 | Inservice Inspection Program - Owner'S Activity Report, Refueling Outage 15 | |
TAC:MF2520 | 1 August 2013 | ||
ML13218A260 | 31 July 2013 | Information in Support of License Renewal Commitment #14 Program Description for Alloy 600 Aging Management Program | Boric Acid Weld Overlay Nondestructive Examination Aging Management Liquid penetrant Dissimilar Metal Weld DM weld |
ML13218A264 | 31 July 2013 | Information in Support of License Renewal Commitment #13 Program Description for Reactor Vessel Internals Inspections | Aging Management EVT-1 Flow Induced Vibration |
IR 05000336/2013405 | 31 July 2013 | IR 05000336-13-405 and 05000423-13-405, 06/22/13 - 06/26/13, Millstone Power Station; Temporary Instruction (Ti) 2515/186, Inspection of Procedures and Processes for Responding to Potential Aircraft Threats, Letter Only | Affidavit |
IR 05000245/2013405 | 31 July 2013 | IR 05000336-13-405 and 05000423-13-405, 06/22/13 - 06/26/13, Millstone Power Station; Temporary Instruction (TI) 2515/186, Inspection of Procedures and Processes for Responding to Potential Aircraft Threats, Letter Only | Affidavit |
ML13207A259 | 30 July 2013 | 7/17/2013 - Summary of Meeting with Dominion Nuclear Connecticut, Inc. and Areva to Discuss Upgrade to Areva Standard CE14 Htp Fuel Assembly.7/17/2013 - Summary of Meeting with Dominion Nuclear Connecticut, Inc. and Areva to Discuss Upgrade | Exemption Request |
ML13192A240 | 30 July 2013 | Acceptance Review Results Regarding Ultimate Heat Sink License Amendment Requests | Ultimate heat sink |
ML13213A025 | 30 July 2013 | Proto-Power Calculation 98-119, Revision B - Analysis of MP2 EDG Heat Exchanger Thermal Performance Test Results | Ultimate heat sink |
ML13213A024 | 30 July 2013 | Response to Request for Additional Information Regarding License Amendment Request for Changes to Technical Specification 3/4.7.11, Ultimate Heat Sink. | Ultimate heat sink |
ML13213A015 | 26 July 2013 | Response to Request for Additional Information to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) | High Radiation Area Locked High Radiation Area FLEX Spent Fuel Pool Instrumentation |
ML13207A239 | 22 July 2013 | June 5, 2013, NRC Generic Fundamentals Examination Results for Millstone Power Station (Cover Letter) | Generic Fundamentals Examination |
ML13204A035 | 19 July 2013 | Response to Request for Additional Information Regarding License Amendment Request for Changes to Technical Specification 4/4.7.11, Ultimate Heat Sink | Ultimate heat sink |
ML13206A088 | 19 July 2013 | Response to NRC Regulatory Issue Summary 2013-06 Preparation and Scheduling of Operator Licensing Examinations | Generic Fundamentals Examination |
ML13197A401 | 18 July 2013 | Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3/4.7.11 Ultimate Heat Sink. | Ultimate heat sink |
ML13192A102 | 18 July 2013 | Closure Evaluation for 30-Day Report for Emergency Core Cooling System Model Changes Pursuant to the Requirements of 10 CFR 50.46 | Loop seal Fuel cladding |