ML13206A088
ML13206A088 | |
Person / Time | |
---|---|
Site: | Millstone, Surry, North Anna |
Issue date: | 07/19/2013 |
From: | Blasioli P Dominion, Dominion Resources Services, Dominion Nuclear Connecticut, Virginia Electric & Power Co (VEPCO) |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
RIS-13-378 | |
Download: ML13206A088 (6) | |
Text
Dominion Resources Services, Inc.
Innsbrook Technical Center 5000 Dominion Boulevard, 2SE, Glen Allen, VA 23060 NDominion July 19, 2013 U. S. Nuclear Regulatory Commission Serial No.: 13-378 Attention: Document Control Desk NLOS/vIh One White Flint North Docket Nos.: 50-336/423 11555 Rockville Pike 50-338/339 Rockville, MD 20852-2738 50.280/281 License Nos.: DPR-65 NPF-49 NPF-4/7 DPR-32/37 DOMINION NUCLEAR CONNECTICUT, INC. (DNC)
VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)
MILLSTONE POWER STATION UNITS 2 AND 3 NORTH ANNA POWER STATION UNITS 1 AND 2 SURRY POWER STATION UNITS 1 AND 2 NRC REGULATORY ISSUE
SUMMARY
2013-06 PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS In response to NRC Regulatory Issue Summary 2013-06, enclosed is the requested information on proposed site-specific operator licensing examination schedules and the estimated number of applicants planning to take those examinations and/or the NRC's generic fundamentals examinations (GFEs).
No new commitments are intended by this letter. If you have any questions concerning this information, please contact Mr. Frank Winks at (804) 273-4610.
Very truly yours, SP. A. Blasioli, Director
ý Nuclear Support Services Dominion Resources Services, Inc. for Dominion Nuclear Connecticut, Inc. and Virginia Electric and Power Company
Enclosures:
NRC Form 536 for Millstone, North Anna and Surry Power Stations cc: U. S. Nuclear Regulatory Commission Region I 2100 Renaissance Boulevard Suite 100 King of Prussia, Pennsylvania 19406-2713 U. S. Nuclear Regulatory Commission Region II Marquis Tower 245 Peachtree Center Avenue, NE Suite 1200 Atlanta, Georgia 30303-1257 VcoDB
SN 13-378 Scheduling of Operator Licensing Examinations Page 2 of 2 Mr. J. S. Kim United States Nuclear Regulatory Commission One White Flint North Mail Stop 08 C-2A 11555 Rockville Pike Rockville, MD 20852-2738 Dr. V. Sreenivas United States Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 Ms. K. R. Cotton United States Nuclear Regulatory Commission One White Flint North Mail Stop 0-8 G9A 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Millstone Power Station NRC Senior Resident Inspector North Anna Power Station NRC Senior Resident Inspector Surry Power Station
NRC FORM 536 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 0913012014 (09-2011) Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Information Services Branch OPERATOR LICENSING (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet -
EXAMINATION DATA mail to Infocotlects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. Ifa means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person isnot required to respond to, the information collection.
FACILITY NRC REGION Millstone Unit 2 1 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2015 CY 2016 CY 2017 CY 2018 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2015 CY 2016 CY 2017 CY 2018 NUMBER OF REACTOR OPERATORS NUMBER OF SENIOR REACTOR OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 0 3 3 0 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 3/21/2016 12/4/2017 ALTERNATE DATE 3/28/2016 12/11/2017 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2015 CY 2016 PROPOSED _
NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 12 CANDIDATES NRC FORM 536 (09-2011)
NRC FORM 536 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NOi. 3160-0131 EXPIRES: 0913012014 (09-20,11) Estimated burden per response to comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Information Services Branch OPERATOR LICENSING (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-EXAMINATION DATA mail to lnfocotlects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRC REGION Millstone Unit 3 1 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2015 CY 2016 CY 2017 CY 2018 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2015 CY 2016 CY 2017 CY 2018 NUMBER OF REACTOR 6 6 6 OPERATORS NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 3 3 3 0 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 3 NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 9/7/2015 9/5/2016 9/18/2017 ALTERNATE DATE 9/14/2015 9/12/2016 9/25/2017 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2015 CY 2016 PROPOSED _ _
NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 12 12 CANDIDATES NRC FORM 536 (09-2011)
NRC FORM 536 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3160-0131 EXPIRES: 09/3012014 (09 i1) Einarý burden per response to compny with this voutary hfo*aon owiec*nm request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This infomralon ooltetiort is used to pkunbudgets and meources mm operat ePRamInaTons.
i LSend N ommens *r*rdmg burden esfimate to the In*bomatin Servies Brnch OPERATOR LICENSING (r-5) uFs. NUde. -Regulatoq Commission, Washigton, DC 20*554301, or by bitemet e-EXAMINATION DATA m to Affahs, NEOB-102Q2Z ReguWaMz II ofa Mmgeet mid (3150-131), Offime fbVo m and
&ig.Wt and Budget waskg DC20M03.Ifa means used to imWose an mbnmai conlectom does not dispfay a currently vad O1B =onid mume, the NRC may not ciot orsporror, and a person is not aqued to respond Io the brntoWnacCleeon.
FACILITY NRC REGION North Anna Power Station 2 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER cY 2015 cY 2016 cy 201 7 Cy 2018 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2015 CY 2016 CY 2017 CY 2018 NUMBER OF REACTOR OPERATORS 0 8 0 8 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 0 3 0 3 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 0 4 0 4 NUMBER OF SENIOR REACTOR OPERATORS - UMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 06/06/2016 06/04/2018 ALTERNATE DATE 06/20/2016 06/18/2018 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED cY 2015 cY 2017 NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED ~ETME NUMBER OF 11 11 CANDIDATES NRC FORM 535 (09-2011)
NRC FoORM 536 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 0913012014 fo9-2I1) Estimate burden per response to comiol with ths votuntay Information collecton request I hour. This Information collectilo Is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Information Servmes Branch OPERATOR LICENSING (-5 F53), U.S. Nucle*r Ragulalory Commssio, Washington, DC 20555001, or by Inte*net-EXAMINATION DATA mal to Intocollects.Resourcenc.gov. and to the Desk Officer, Office of Information and Regulatory Affais, NEOB-10202, (3150-0131). Ofte of Management and Budget. Washington, DC 20503. If a means used to knIpose an Information collection does not display a curuntly valid OMB control number, the NRC may not conduct or sponsor, and a person Isnot required to respond to, the ifoni ion collection.
FACUTY NRC REGION Surry Power Station 2
A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2015 CY 2016. CY 2017 CY 2018 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2015 CY 2016 CY 2017 CY 2018 NUMBER OF REACTOR 10 8 8 0 OPERATORS NUMBER OF SENIOR REACTOR 2 2 2 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR 1 2 2 0 OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 9/21/2015 9/19/2016 9/18/2017 ALTERNATE DATE 9/28/2015 9/26/2016 9/25/2017 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2015 CY 2016 PROPOSED _____________. .... _______ ____ ___
NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 12 10 CANDIDATES NRC FORM 536 (09-2011)