Issue date | Title | Topic | |
---|---|---|---|
TAC:MF2592 | 30 September 2013 | ||
ML13238A068 | 30 September 2013 | Review of Updated Final Safety Analysis Report, Revision 19 (MF2592 and MF2593) | Incorporated by reference |
ML13193A043 | 30 September 2013 | Request for Additional Information Regarding Review of Core Operating Limits Report, Cycle 15, Revision 0 | |
TAC:MF2396 | 30 September 2013 | ||
ML13273A192 | 30 September 2013 | Notification of NRC Inspection | |
ML13309A230 | 30 September 2013 | Transcript of 10 CFR Petition Review Board Re(Garding) General Electric Mark I and II (Boiling Water Reactors) Bwrs, 09-30-2013, Pages 1-98(100) | Safe Shutdown Ultimate heat sink Internal Flooding Enforcement Discretion Earthquake Hardened vent Backfit |
ML13268A509 | 25 September 2013 | NRR E-mail Capture - Seismic Walkdown Delayed Items | |
RA-13-094, Proposed Alternative to Utilize Code Case N-649, Alternative Requirements for IWE-5240 Visual Examination Section XI, Division 1 | 25 September 2013 | Proposed Alternative to Utilize Code Case N-649, Alternative Requirements for IWE-5240 Visual Examination Section XI, Division 1 | |
RS-13-237, Request to Use a Provision of a Later Addenda of the ASME Boiler and Pressure Vessel Code, Section XI | 25 September 2013 | Request to Use a Provision of a Later Addenda of the ASME Boiler and Pressure Vessel Code, Section XI | Incorporated by reference |
TAC:MF2791 | 20 September 2013 | ||
RS-13-207, License Amendment Request to Revise Loss of Voltage Relay Settings for 4.16 Kv ESF Buses | 20 September 2013 | License Amendment Request to Revise Loss of Voltage Relay Settings for 4.16 Kv ESF Buses | Safe Shutdown Design basis earthquake |
RA-13-081, Proposed Resolution for Completion of the Seismic Walkdowns Associated with NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term. | 16 September 2013 | Proposed Resolution for Completion of the Seismic Walkdowns Associated with NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term. | Fukushima Dai-Ichi Foreign Material Exclusion |
RA-13-075, Response to NRC Request for Information Per 10 CFR 50.54(f) Re the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident- 1.5 Year Response for CEUS Sites | 12 September 2013 | Response to NRC Request for Information Per 10 CFR 50.54(f) Re the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident- 1.5 Year Response for CEUS Sites | Fukushima Dai-Ichi Earthquake |
Press Release-13-073, NRC Issues Mid-Cycle Assessments for Nation'S Nuclear Plants | 6 September 2013 | Press Release-13-073: NRC Issues Mid-Cycle Assessments for Nation'S Nuclear Plants | |
RS-13-092, License Amendment Request to Revise Peak Calculated Primary Containment Internal Pressure | 5 September 2013 | License Amendment Request to Revise Peak Calculated Primary Containment Internal Pressure | |
ML13254A119 | 5 September 2013 | Attachment 5 - Updated Evacuation Time Estimates for LaSalle County Station Plume Exposure Pathway and ETE Review Criteria Checklist | |
TAC:MF2690 | 5 September 2013 | ||
RA-13-085, 10 CFR 50, Appendix E, Evacuation Time Estimate Analysis Supplemental Response for Braidwood, Byron, Clinton, Dresden, LaSalle, Limerick, Oyster Creek, Peach Bottom, Quad Cities and Three Mile Island | 5 September 2013 | 10 CFR 50, Appendix E, Evacuation Time Estimate Analysis Supplemental Response for Braidwood, Byron, Clinton, Dresden, LaSalle, Limerick, Oyster Creek, Peach Bottom, Quad Cities and Three Mile Island | |
RS-13-137, Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Using the Consolidated Line Item Improvement Process | 3 September 2013 | Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Using the Consolidated Line Item Improvement Process | Surveillance Frequency Control Program Recently irradiated fuel |
ML13246A236 | 3 September 2013 | 2013 LaSalle County Station Mid-Cycle Letter Combined | |
TAC:MF2640 | 29 August 2013 | ||
ML13234A503 | 28 August 2013 | Nuclear Regulatory Commission Audits of Licensee Responses to Mitigation Strategies Order EA-12-049 | FLEX |
RS-13-121, First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | 28 August 2013 | First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | FLEX B.5.b Mitigating Strategies Hardened vent |
RS-13-120, First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) | 28 August 2013 | First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) | FLEX Spent Fuel Pool Instrumentation |
RA13-053, Core Operating Limits Report, Cycle 15, Revision 1 | 28 August 2013 | Core Operating Limits Report, Cycle 15, Revision 1 | Minimum Critical Power Ratio MELLLA |
ML13262A271 | 28 August 2013 | Cycle 15 Core Operating Limits Report | |
ML13242A000 | 23 August 2013 | NRR E-mail Capture - Acceptance Review for License Amendment Request to Adopt TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs | Shutdown Margin |
ML13233A364 | 23 August 2013 | Establishment of Mitigation Strategies Directorate for Nuclear Regulatory Commission Review of Order EA-12-049 | Fukushima Dai-Ichi |
RA13-044, Triennial Chlorine Survey Report | 16 August 2013 | Triennial Chlorine Survey Report | |
ML13228A309 | 16 August 2013 | Assessment Follow-Up Letter for LaSalle County Station, Unit 2 | |
RS-13-209, Response to Request for Additional Information Re 2013 Report on Status of Decommissioning Funding for Reactors | 15 August 2013 | Response to Request for Additional Information Re 2013 Report on Status of Decommissioning Funding for Reactors | |
RS-13-202, Response to Request for Additional Information Regarding License Amendment Request to Remove License Conditions Associated with Unit 2 Spent Fuel Pool | 12 August 2013 | Response to Request for Additional Information Regarding License Amendment Request to Remove License Conditions Associated with Unit 2 Spent Fuel Pool | |
ML13225A557 | 12 August 2013 | Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit | |
ML13228A399 | 12 August 2013 | Letter to Holders of Independent Spent Fuel Storage Installation (ISFSI) Licenses Re Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit - Rin 3150-AI64 (NRC-2009-0163) EA-02-109 | |
RS-13-203, Registration of Use of Casks to Store Spent Fuel | 8 August 2013 | Registration of Use of Casks to Store Spent Fuel | |
IR 05000373/2013003 | 2 August 2013 | IR 05000373-13-003, 05000374-13-003, 07200020-13-001; 04/01/2013 - 06/30/2013; LaSalle County Station, Units 1 and 2; Maintenance Risk Assessments and Emergent Work Control | High winds High Radiation Area Ultimate heat sink Offsite Dose Calculation Manual Probabilistic Risk Assessment Temporary Modification Significance Determination Process Annual Radiological Environmental Operating Report Operability Determination Control of Heavy Loads Pressure boundary leak Fire Protection Program |
RS-13-070, Application to Revise Technical Specifications to Adopt TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs | 2 August 2013 | Application to Revise Technical Specifications to Adopt TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs | Shutdown Margin Recently irradiated fuel |
ML13161A286 | 2 August 2013 | Acknowledgement Letter for 60 Day Response to Issuance of Seismic Guidance Related to the NTTF Recommendation 2.1, Seismic Reevaluations | Probabilistic Risk Assessment Earthquake |
RA13-043, County, Units I and 2, Notification of NPDES Permit Renewal No. 1L0048151 | 2 August 2013 | County, Units I and 2, Notification of NPDES Permit Renewal No. 1L0048151 | Grab sample Incorporated by reference |
ML13206A427 | 1 August 2013 | Online Reference Portal for Nuclear Regulatory Commission Review of Fukushima Near Term Task Force Related Documents | |
NEI 01-01, NRC NEI-01-01 Meeting Presentation on 7/31/13 Digital I&C Meeting | 31 July 2013 | NRC NEI-01-01 Meeting Presentation on 7/31/13 Digital I&C Meeting | |
ML13212A337 | 31 July 2013 | NRC NEI-01-01 Meeting Presentation on 7/31/13 Digital I&C Meeting | |
RS-13-198, Advisement of Leadership Changes for Exelon Generation Company, LLC | 31 July 2013 | Advisement of Leadership Changes for Exelon Generation Company, LLC | |
ML13301A678 | 30 July 2013 | NRR E-mail Capture - Responses to Questions Regarding Review of LaSalle Unit 1 Evaluation of Reactor Vessel Capsule Surveillance (MF0500) | |
ML13211A378 | 30 July 2013 | 7/31/2013 NRC Public Meeting Presentation on NEI 01-01 | |
NEI 01-01, 7/31/2013 NRC Public Meeting Presentation on NEI 01-01 | 30 July 2013 | 7/31/2013 NRC Public Meeting Presentation on NEI 01-01 | |
ML13193A052 | 23 July 2013 | Request for Additional Information Related to Administrative Change to Remove Obsolete License Condition Related to Boraflex Degradation | |
ML14311A575 | 18 July 2013 | Exelon Nuclear Standardized Radiological Emergency Plan Implementing Procedure Revisions | |
ML14311A643 | 18 July 2013 | Exelon Nuclear Standardized Radiological Emergency Plan Implementing Procedure Revisions. (Version ML13200A124) | |
IR 05000373/2013009 | 18 July 2013 | Inspection Report (IR) 05000373-13-009, 05000374-13-009, on 04/22/2013 - 06/03/2013, LaSalle County Station, Units 1 and 2, Inspection Procedure (IP) 93812, Special Inspection | Time of Discovery Offsite Dose Calculation Manual Significance Determination Process Through-Wall Leak |