Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
TAC:MF259230 September 2013
ML13238A06830 September 2013Review of Updated Final Safety Analysis Report, Revision 19 (MF2592 and MF2593)Incorporated by reference
ML13193A04330 September 2013Request for Additional Information Regarding Review of Core Operating Limits Report, Cycle 15, Revision 0
TAC:MF239630 September 2013
ML13273A19230 September 2013Notification of NRC Inspection
ML13309A23030 September 2013Transcript of 10 CFR Petition Review Board Re(Garding) General Electric Mark I and II (Boiling Water Reactors) Bwrs, 09-30-2013, Pages 1-98(100)Safe Shutdown
Ultimate heat sink
Internal Flooding
Enforcement Discretion
Earthquake
Hardened vent
Backfit
ML13268A50925 September 2013NRR E-mail Capture - Seismic Walkdown Delayed Items
RA-13-094, Proposed Alternative to Utilize Code Case N-649, Alternative Requirements for IWE-5240 Visual Examination Section XI, Division 125 September 2013Proposed Alternative to Utilize Code Case N-649, Alternative Requirements for IWE-5240 Visual Examination Section XI, Division 1
RS-13-237, Request to Use a Provision of a Later Addenda of the ASME Boiler and Pressure Vessel Code, Section XI25 September 2013Request to Use a Provision of a Later Addenda of the ASME Boiler and Pressure Vessel Code, Section XIIncorporated by reference
TAC:MF279120 September 2013
RS-13-207, License Amendment Request to Revise Loss of Voltage Relay Settings for 4.16 Kv ESF Buses20 September 2013License Amendment Request to Revise Loss of Voltage Relay Settings for 4.16 Kv ESF BusesSafe Shutdown
Design basis earthquake
RA-13-081, Proposed Resolution for Completion of the Seismic Walkdowns Associated with NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term.16 September 2013Proposed Resolution for Completion of the Seismic Walkdowns Associated with NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term.Fukushima Dai-Ichi
Foreign Material Exclusion
RA-13-075, Response to NRC Request for Information Per 10 CFR 50.54(f) Re the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident- 1.5 Year Response for CEUS Sites12 September 2013Response to NRC Request for Information Per 10 CFR 50.54(f) Re the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident- 1.5 Year Response for CEUS SitesFukushima Dai-Ichi
Earthquake
Press Release-13-073, NRC Issues Mid-Cycle Assessments for Nation'S Nuclear Plants6 September 2013Press Release-13-073: NRC Issues Mid-Cycle Assessments for Nation'S Nuclear Plants
RS-13-092, License Amendment Request to Revise Peak Calculated Primary Containment Internal Pressure5 September 2013License Amendment Request to Revise Peak Calculated Primary Containment Internal Pressure
ML13254A1195 September 2013Attachment 5 - Updated Evacuation Time Estimates for LaSalle County Station Plume Exposure Pathway and ETE Review Criteria Checklist
TAC:MF26905 September 2013
RA-13-085, 10 CFR 50, Appendix E, Evacuation Time Estimate Analysis Supplemental Response for Braidwood, Byron, Clinton, Dresden, LaSalle, Limerick, Oyster Creek, Peach Bottom, Quad Cities and Three Mile Island5 September 201310 CFR 50, Appendix E, Evacuation Time Estimate Analysis Supplemental Response for Braidwood, Byron, Clinton, Dresden, LaSalle, Limerick, Oyster Creek, Peach Bottom, Quad Cities and Three Mile Island
RS-13-137, Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Using the Consolidated Line Item Improvement Process3 September 2013Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Using the Consolidated Line Item Improvement ProcessSurveillance Frequency Control Program
Recently irradiated fuel
ML13246A2363 September 20132013 LaSalle County Station Mid-Cycle Letter Combined
TAC:MF264029 August 2013
ML13234A50328 August 2013Nuclear Regulatory Commission Audits of Licensee Responses to Mitigation Strategies Order EA-12-049FLEX
RS-13-121, First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)28 August 2013First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)FLEX
B.5.b Mitigating Strategies
Hardened vent
RS-13-120, First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)28 August 2013First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)FLEX
Spent Fuel Pool Instrumentation
RA13-053, Core Operating Limits Report, Cycle 15, Revision 128 August 2013Core Operating Limits Report, Cycle 15, Revision 1Minimum Critical Power Ratio
MELLLA
ML13262A27128 August 2013Cycle 15 Core Operating Limits Report
ML13242A00023 August 2013NRR E-mail Capture - Acceptance Review for License Amendment Request to Adopt TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel DesignsShutdown Margin
ML13233A36423 August 2013Establishment of Mitigation Strategies Directorate for Nuclear Regulatory Commission Review of Order EA-12-049Fukushima Dai-Ichi
RA13-044, Triennial Chlorine Survey Report16 August 2013Triennial Chlorine Survey Report
ML13228A30916 August 2013Assessment Follow-Up Letter for LaSalle County Station, Unit 2
RS-13-209, Response to Request for Additional Information Re 2013 Report on Status of Decommissioning Funding for Reactors15 August 2013Response to Request for Additional Information Re 2013 Report on Status of Decommissioning Funding for Reactors
RS-13-202, Response to Request for Additional Information Regarding License Amendment Request to Remove License Conditions Associated with Unit 2 Spent Fuel Pool12 August 2013Response to Request for Additional Information Regarding License Amendment Request to Remove License Conditions Associated with Unit 2 Spent Fuel Pool
ML13225A55712 August 2013Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit
ML13228A39912 August 2013Letter to Holders of Independent Spent Fuel Storage Installation (ISFSI) Licenses Re Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit - Rin 3150-AI64 (NRC-2009-0163) EA-02-109
RS-13-203, Registration of Use of Casks to Store Spent Fuel8 August 2013Registration of Use of Casks to Store Spent Fuel
IR 05000373/20130032 August 2013IR 05000373-13-003, 05000374-13-003, 07200020-13-001; 04/01/2013 - 06/30/2013; LaSalle County Station, Units 1 and 2; Maintenance Risk Assessments and Emergent Work ControlHigh winds
High Radiation Area
Ultimate heat sink
Offsite Dose Calculation Manual
Probabilistic Risk Assessment
Temporary Modification
Significance Determination Process
Annual Radiological Environmental Operating Report
Operability Determination
Control of Heavy Loads
Pressure boundary leak
Fire Protection Program
RS-13-070, Application to Revise Technical Specifications to Adopt TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs2 August 2013Application to Revise Technical Specifications to Adopt TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel DesignsShutdown Margin
Recently irradiated fuel
ML13161A2862 August 2013Acknowledgement Letter for 60 Day Response to Issuance of Seismic Guidance Related to the NTTF Recommendation 2.1, Seismic ReevaluationsProbabilistic Risk Assessment
Earthquake
RA13-043, County, Units I and 2, Notification of NPDES Permit Renewal No. 1L00481512 August 2013County, Units I and 2, Notification of NPDES Permit Renewal No. 1L0048151Grab sample
Incorporated by reference
ML13206A4271 August 2013Online Reference Portal for Nuclear Regulatory Commission Review of Fukushima Near Term Task Force Related Documents
NEI 01-01, NRC NEI-01-01 Meeting Presentation on 7/31/13 Digital I&C Meeting31 July 2013NRC NEI-01-01 Meeting Presentation on 7/31/13 Digital I&C Meeting
ML13212A33731 July 2013NRC NEI-01-01 Meeting Presentation on 7/31/13 Digital I&C Meeting
RS-13-198, Advisement of Leadership Changes for Exelon Generation Company, LLC31 July 2013Advisement of Leadership Changes for Exelon Generation Company, LLC
ML13301A67830 July 2013NRR E-mail Capture - Responses to Questions Regarding Review of LaSalle Unit 1 Evaluation of Reactor Vessel Capsule Surveillance (MF0500)
ML13211A37830 July 20137/31/2013 NRC Public Meeting Presentation on NEI 01-01
NEI 01-01, 7/31/2013 NRC Public Meeting Presentation on NEI 01-0130 July 20137/31/2013 NRC Public Meeting Presentation on NEI 01-01
ML13193A05223 July 2013Request for Additional Information Related to Administrative Change to Remove Obsolete License Condition Related to Boraflex Degradation
ML14311A57518 July 2013Exelon Nuclear Standardized Radiological Emergency Plan Implementing Procedure Revisions
ML14311A64318 July 2013Exelon Nuclear Standardized Radiological Emergency Plan Implementing Procedure Revisions. (Version ML13200A124)
IR 05000373/201300918 July 2013Inspection Report (IR) 05000373-13-009, 05000374-13-009, on 04/22/2013 - 06/03/2013, LaSalle County Station, Units 1 and 2, Inspection Procedure (IP) 93812, Special InspectionTime of Discovery
Offsite Dose Calculation Manual
Significance Determination Process
Through-Wall Leak