Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
NL-13-1936, 10 CFR 71.95 Report on Potential Issues Involving Radwaste Cask 8-120B30 September 201310 CFR 71.95 Report on Potential Issues Involving Radwaste Cask 8-120B
NL-13-2090, Special Report 2013-002-00. Nonfunctional Radiation Monitor R-60C27 September 2013Special Report 2013-002-00. Nonfunctional Radiation Monitor R-60C
ML13218B27426 September 2013Issuance of Amendments Regarding Steam Generator Tube Inspection ProgramPost Accident Monitoring
Nondestructive Examination
Surveillance Frequency Control Program
Liquid penetrant
NL-13-2123, Request to Obtain U. S. Army Corps of Engineers (Usace) Information Required to Provide Response to March 12, 2012 Request for Information, Recommendation 2.126 September 2013Request to Obtain U. S. Army Corps of Engineers (Usace) Information Required to Provide Response to March 12, 2012 Request for Information, Recommendation 2.1Fukushima Dai-Ichi
NL-13-1503, Farley, Units 1 and 2, Calculation Number: SE-C051326701-008, NFPA 805 Fire Risk Evaluations, Version 1.0. Part 3 of 524 September 2013Farley, Units 1 and 2, Calculation Number: SE-C051326701-008, NFPA 805 Fire Risk Evaluations, Version 1.0. Part 3 of 5Hot Short
Safe Shutdown
Mission time
Fire Barrier
Probabilistic Risk Assessment
Large early release frequency
ML14038A02024 September 2013Calculation Number: SE-C051326701-008, NFPA 805 Fire Risk Evaluations, Verion 1.0. Part 1 of 5Hot Short
Safe Shutdown
Boric Acid
Shutdown Margin
Mission time
Fire Barrier
Probabilistic Risk Assessment
Operator Manual Action
Large early release frequency
Fire Protection Program
NL-13-1503, Farley, Units 1 and 2, Calculation Number: SE-C051326701-008, NFPA 805 Fire Risk Evaluations, Verion 1.0. Part 1 of 524 September 2013Farley, Units 1 and 2, Calculation Number: SE-C051326701-008, NFPA 805 Fire Risk Evaluations, Verion 1.0. Part 1 of 5Hot Short
Safe Shutdown
Boric Acid
Shutdown Margin
Mission time
Fire Barrier
Probabilistic Risk Assessment
Operator Manual Action
Large early release frequency
Fire Protection Program
NL-13-1503, Farley, Units 1 and 2, Calculation Number: SE-C051326701-008, NFPA 805 Fire Risk Evaluations, Version 1.0. Part 4 of 524 September 2013Farley, Units 1 and 2, Calculation Number: SE-C051326701-008, NFPA 805 Fire Risk Evaluations, Version 1.0. Part 4 of 5Hot Short
Safe Shutdown
Boric Acid
Shutdown Margin
Mission time
Fire Barrier
Probabilistic Risk Assessment
Large early release frequency
ML14038A02124 September 2013Calculation Number: SE-C051326701-008, NFPA 805 Fire Risk Evaluations, Version 1.0. Part of 5Hot Short
Safe Shutdown
Shutdown Margin
Mission time
Fire Barrier
Probabilistic Risk Assessment
Large early release frequency
NL-13-1503, Farley, Units 1 and 2, Calculation Number: SE-C051326701-008, NFPA 805 Fire Risk Evaluations, Version 1.0. Part of 524 September 2013Farley, Units 1 and 2, Calculation Number: SE-C051326701-008, NFPA 805 Fire Risk Evaluations, Version 1.0. Part of 5Hot Short
Safe Shutdown
Shutdown Margin
Mission time
Fire Barrier
Probabilistic Risk Assessment
Large early release frequency
ML14038A02224 September 2013Calculation Number: SE-C051326701-008, NFPA 805 Fire Risk Evaluations, Version 1.0. Part 3 of 5Hot Short
Safe Shutdown
Mission time
Fire Barrier
Probabilistic Risk Assessment
Large early release frequency
ML14038A02424 September 2013Calculation Number: SE-C051326701-008, NFPA 805 Fire Risk Evaluations, Version 1.0. Part 4 of 5Hot Short
Safe Shutdown
Boric Acid
Shutdown Margin
Mission time
Fire Barrier
Probabilistic Risk Assessment
Large early release frequency
ML14038A02524 September 2013Farley, Units 1 and 2, Calculation Number: SE-C051326701-008, NFPA 805 Fire Risk Evaluations, Version 1.0. Part 5 of 5
ML14035A57920 September 2013Single Positive Test Form for Pre-Access, Collected on 09/16/2013
ML14035A58220 September 2013Single Positive Test Form for Pre-Access, Collected on 09/03/2013
ML14035A58520 September 2013Single Positive Test Form for Pre-Access, Collected on 09/04/2013
ML14035A58020 September 2013Single Positive Test Form for Pre-Access, Collected on 09/03/2013
NL-13-1769, Request for Use of Delta Protection Mururoa V4F1 R Supplied Air Suits and the Mururoa Blu Suit Systems17 September 2013Request for Use of Delta Protection Mururoa V4F1 R Supplied Air Suits and the Mururoa Blu Suit SystemsMururoa
ML14038A01916 September 2013Joseph M. Farley, Units 1 and 2, Response to Request for Additional Information Regarding License Amendment Request for Transition to 10 CFR 50.48(c) - NFPA 805 Performance Based Standard for Fire Protection for Light Water Reactor Generati
ML13253A36610 September 2013Notification of Inspection and Request for Information for NRC Problem Identification and Resolution InspectionProbabilistic Risk Assessment
Operator Manual Action
Maintenance Rule Program
ML13249A5619 September 2013Non-Proprietary LTR Re. Draft Transmittal of Draft SE for Proposed Amend. Re. TS Revisions Associated with the Low Temperature Overpressure Protection System and the Pressure and Temperature Limits ReportPressure and Temperature Limits Report
ML13253A4115 September 2013Joseph M Farley Nuclear Generating Station NRC Temporary Instruction 2201/004, Inspection of Implementation of Interim Cyber Security Milestones 1-7 Inspection Report No. 05000348-13404 and 05000364-13-404 - OUO RemovedEnforcement Discretion
Cyber Security
IR 05000348/20134045 September 2013Joseph M Farley Nuclear Generating Station NRC Temporary Instruction 2201/004, Inspection of Implementation of Interim Cyber Security Milestones 1-7 Inspection Report No. 05000348-13404 and 05000364-13-404 - OUO RemovedEnforcement Discretion
Cyber Security
Affidavit
NL-13-1555, Enclosure 1, Including Attachments 1 to 8: Licensing Summary of Walkdown Report. Part 1 of 74 September 2013Enclosure 1, Including Attachments 1 to 8: Licensing Summary of Walkdown Report. Part 1 of 7Safe Shutdown
Probabilistic Risk Assessment
ML13247A4284 September 2013Decommissioning Spot-Check - Farley Unit 2
ML13252A1504 September 2013Updated Seismic Recommendation 2.3 Walkdown Report Requested by NRC Letter, Request for Information Re Recommendations 2.1, 2.3 & 9.3 of the Near-Term Task Force Review of Insights from Fukushima Dai Ichi AccidentUnanalyzed Condition
NL-13-1555, Joseph M. Farley Unit 2, Updated Seismic Recommendation 2.3 Walkdown Report Requested by NRC Letter, Request for Information Re Recommendations 2.1, 2.3 & 9.3 of the Near-Term Task Force Review of Insights from Fukushima Dai Ichi Accident4 September 2013Joseph M. Farley Unit 2, Updated Seismic Recommendation 2.3 Walkdown Report Requested by NRC Letter, Request for Information Re Recommendations 2.1, 2.3 & 9.3 of the Near-Term Task Force Review of Insights from Fukushima Dai Ichi AccidentUnanalyzed Condition
ML13252A1594 September 2013Enclosure 1, Including Attachments 1 to 8: Licensing Summary of Walkdown Report. Part 7 of 7Scaffolding
ML13252A1574 September 2013Enclosure 1, Including Attachments 1 to 8: Licensing Summary of Walkdown Report. Part 6 of 7
ML13252A1564 September 2013Enclosure 1, Including Attachments 1 to 8: Licensing Summary of Walkdown Report. Part 5 of 7
ML13252A1554 September 2013Enclosure 1, Including Attachments 1 to 8: Licensing Summary of Walkdown Report. Part 4 of 7
ML13252A1544 September 2013Enclosure 1, Including Attachments 1 to 8: Licensing Summary of Walkdown Report. Part 3 of 7
ML13252A1534 September 2013Enclosure 1, Including Attachments 1 to 8: Licensing Summary of Walkdown Report. Part 2 of 7
NL-13-1555, Enclosure 2: Updated Farley Unit 2 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic4 September 2013Enclosure 2: Updated Farley Unit 2 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: SeismicSafe Shutdown
Unanalyzed Condition
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Coatings
Operating Basis Earthquake
Fukushima Dai-Ichi
Earthquake
Scaffolding
ML13252A1514 September 2013Enclosure 1, Including Attachments 1 to 8: Licensing Summary of Walkdown Report. Part 1 of 7Safe Shutdown
Probabilistic Risk Assessment
ML13246A1103 September 2013Mid-Cycle Assessment Letter
ML13234A50328 August 2013Nuclear Regulatory Commission Audits of Licensee Responses to Mitigation Strategies Order EA-12-049FLEX
NL-13-1762, First Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049)27 August 2013First Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049)Boric Acid
FLEX
NL-13-1765, First Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Reliable Spent Fuel Pool Instrumentation (EA-12-051)27 August 2013First Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Reliable Spent Fuel Pool Instrumentation (EA-12-051)Spent Fuel Pool Instrumentation
TAC:MF071627 August 2013
ML13233A36423 August 2013Establishment of Mitigation Strategies Directorate for Nuclear Regulatory Commission Review of Order EA-12-049Fukushima Dai-Ichi
ML13247A42522 August 2013Decommissioning Spot-Check - Farley, Unit 1
NL-13-1734, Response to the Request for Additional Information Regarding Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)20 August 2013Response to the Request for Additional Information Regarding Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)FLEX
Spent Fuel Pool Instrumentation
ML13225A55712 August 2013Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit
ML13225A29312 August 20137/23-24/2013, Summary of Meeting 2013 U.S. Nuclear Regulatory Commission (NRC) Initial Exam Writers' Workshop
ML13217A30912 August 2013Proprietary WithholdingNL_13_0545Pressure and Temperature Limits Report
ML13212A1768 August 2013Request for Alternative FNP-ISI-ALT-13 Regarding Deferral of Inservice Inspection of Reactor Pressure Vessel Cold Leg Nozzle Dissimilar Metal Welds (TAC Nos. ME9739 & ME9740)Incorporated by reference
Through Wall Leak
Dissimilar Metal Weld
NL-13-1729, Refueling Outage 2R22 Inservice Inspection Report7 August 2013Refueling Outage 2R22 Inservice Inspection Report
NL-13-1654, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors (10 CFR 50.75(f)(1) and (2)) Response to Request for Additional Information5 August 2013Financial Assurance Requirements for Decommissioning Nuclear Power Reactors (10 CFR 50.75(f)(1) and (2)) Response to Request for Additional Information
ML13199A1585 August 2013Request for Withholding Information from Public Disclosure, Relief Request of Proposed Inservice Inspection Alternative FNP-ISI-ALT-13, Version 1.0