Enclosure 1, Including Attachments 1 to 8: Licensing Summary of Walkdown Report. Part 7 of 7
ML13252A159
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 09/04/2013
From:
Southern Nuclear Operating Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML13252A148 List:
References
NL-13-1555
Download: ML13252A159 (139)


Text

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet I of 4 Status: YN No- uFr Seismic Walkdown Checklist (SWC)

Equipment ID No. 02R18B0030 Equip. Class, 14 Equipment Description Power Disconnect Switch Location: Bldg. AB Floor El. 139 Room, Area 2332 Manufacturer, Model. Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage I. Is the anchorage configuration verification required (i.e., is the item one YS NEI of the 50% of SWEL items requiring such verification)?

Anchorage verified in original walkdown on 8/28/12.

2. Is the anchorage free of bent, broken, missing or loose hardware? YN NO UC NIAO The anchorageis free from potentially adverse seismic conditions. The paneldoor is missing one of four bolts on outerpanel however this is judged to not be a seismically adverse condition.
3. Is the anchorage free of corrosion that is more than mild surface Y[@ NO U- N/AQ oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YO NOI UO N/AO
5. Is the anchorage configuration consistent with plant documentation? Y0 NO UO N/AO (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Anchorage verifiedon 8/28/12 per SEWS package dated 3/20/95.

6. Based on the above anchorage evaluations, is the anchorage free of YE NO UO potentially adverse seismic conditions?

Enter the equipment class name from Appendix B: Classes of Equipment.

Page 120 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 2 of 4 Status: YV NE"] UM]

Seismic Walkdown Checklist (SWC)

Equipment ID No. Q2R18BO030 Equip.

Equipment Description Power Disconnect Switch Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YN ND UD N/AD
8. Are overhead equipment. distribution systems, ceiling tiles and lighting, YN ND UD N/AD and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YO NEI UD N/AD
10. Based on the above seismic interaction evaluations, is equipment free YEND U'-

of potentially adverse seismic interaction effects?

Other Adverse Conditions I1. Have you looked for and found no other seismic conditions that could YZ ND"I UD adversely affect the safety functions of the equipment?

All equipment inside the power disconnectswitch was adequately restrainedwith no loose connections and no missing bolts.

Comments (Additional pages may be added as necessary)

SWC originally completed on 8/28112. Final walkdown performed to inspect power disconnect switch internalsand complete anchorageverification.

Area walk-by completed 8128112.

Evaluated by: I, Maclall YýQJUA P--a CLL-00ak-A Date: _-- _i____ _ ___

L..'a Ter 'Alan Mullen Page 121 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 3 of 4 Page 122 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 4 of 4 Page 123 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet I of 4 Status: YS NEI UM Seismic Walkdown Checklist (SWC)

Equipment ID No.A 188r0032 - Equip. Class, 1 34 Equipment Description Circuit Breaker Box Location: Bldg. AB Floor El. 139 Room, Area 2332 Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage I. Is the anchorage configuration verification required (i.e., is the item one YU NO of the 50% of SWEL items requiring such verification)?

Anchorage verified in original walkdown on 8/28/12.

2. Is the anchorage free of bent, broken, missing or loose hardware? YN NOI UO N/AI The anchorageis free from potentiallyadverse seismic conditions.
3. Is the anchorage free of corrosion that is more than mild surface YE NO UO N/AQ oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YU NO UO N/A-
5. Is the anchorage configuration consistent with plant documentation? YZ NEI UO N/AO (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Anchorage verified on 8/28/12 per SEWS package dated 7/1/93 6, Based on the above anchorage evaluations, is the anchorage free of YZ NEI UO potentially adverse seismic conditions?

Enter the equipment class name from Appendix B: Classes of Equipment.

0 Page 124 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 2 of 4 Status: Yo N[] UM Seismic Walkdown Checklist (SWC)

Equipment ID No. Q2R18B0032 Equip. Class' 14 Equipment Description Circuit Breaker Box Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YZ NO UO N/A-
8. Are overhead equipment, distribution systems. ceiling tiles and lighting, YN NO U" N/A-and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? Y0 NO UD N/A[l
10. Based on the above seismic interaction evaluations, is equipment free YO NEI UD of potentially adverse seismic interaction effects?

Other Adverse Conditions 1I. Have you looked for and found no other seismic conditions that could Y21 NE UO adversely affect the safety functions of the equipment?

All equipment inside the circuitbreaker box was adequately restrained with no loose connections and no missing bolts.

Comments (Additional pages may be added as necessary)

SWC originallycompleted on 8/28/12. Final walkdown performed to inspect circuitbreakerbox internalsand complete anchorage verification.

Area walk-by completed 8/28/12.

Evaluated by: Laura Maclay Dat: 'DjIPM Tern3,Alan MullenixL 1.4.f * ,f _ 4 /

VIJ t 12 JZOI1 Page 125 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 3 of 4 Page 126 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 4 of 4 0

0 Page 127 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0

~-Z -cLA'-~ Sheet 1 of 4 Status: YS NEI UM Seismic Walkdown Checklist (SWC)

Equipment ID No. Q2R18B034 Equip. Class:

Equipment Description POWER DISCONNECT SWITC Location: Bldg. AUXILIARY Floor El. 139 Room, Area 2322 Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage I. Is the anchorage configuration verification required (i.e., is the item one Y9 NE of the 50% of SWEL items requiring such verification)?

Reference SEWS package for Q2R18B034, dated 3/20/95.

2. Is the anchorage free of bent, broken, missing or loose hardware? YI NO UFI N/AC Anchorage verfied SAT on 8/24/12.
3. Is the anchorage free of corrosion that is more than mild surface YZ N] UD N/AI oxidation?

Anchorage verfied SAT on 8/24/12.

4. Is the anchorage free of visible cracks in the concrete near the anchors? YO NE US N/AC' Anchorage verfied SAT on 8/24/12.
5. Is the anchorage configuration consistent with plant documentation? YO NC US N/AC (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Anchorage configuration verified to be consistent with SEWS pacakge for 02R 18B034, dated 3/20/95 during walkdown performedon 8/24/12.

6. Based on the above anchorage evaluations, is the anchorage free of Y0 NO UOI potentially adverse seismic conditions?

Anchorage verfied SAT on 8/24/12.

Enter the equipment class name front Appendix B: Classes of Equipment.

Page 128 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 2 of 4 Status: YM NO U-"

Seismic Walkdown Checklist (SWC)

Equipment ID No. 02R18B034 Equip. Class, Equipment Description POWER DISCONNECT SWITCiH Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YIN NEI UO N/AO
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y[9 NEI UO N/A-and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YZ NEI UO N/AO
10. Based on the above seismic interaction evaluations, is equipment free Y21 NO UE-of potentially adverse seismic interaction effects?

Other Adverse Conditions I1. Have you looked for and found no other seismic conditions that could YZ NO UO adversely affect the safety functions of the equipment?

The cabinet internals were inspected and no missing hardwareor fasteners were observed. The cables inside the cabinet had adeqate flex. No other adverseseismic conditions were observed.

Comments (Additional pages may be added as necessary)

SW C completed originallyon 8/24/12 A ,*  %..C ,

,J .i',s F,4 -Re4 '* k '

p A small bit of debris in the bottom of the cabinet was observed, but posed no adverse seismic condition.

Evaluated by: Ryan Harlos Date: - /13

_2/_

Tavlor Youaeblood '~/

07 0

Page 129 of 234

OTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS 0 NO. SNCF164-RPT-02, VERSIO*

Page 130 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Page 131 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 ft4 alsl,.

Sheet i of* '4 F 2- oCl57( Status: YZ NF' UI Seismic Walkdown Checklist (SWC)

Equipment ID No. 02R18B043 Equip. Class' 2 Equipment Description MOV POWER DISCONNECT SWITCH Location: Bldg. AUXILIARY Floor El. 139 Room, Area 2312 Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage I. Is the anchorage configuration verification required (i.e., is the item one Y[D NEI of the 50% of SWEL items requiring such verification)?

Reference SEWS package for Q2R18B043, dated 3/20/95.

2. Is the anchorage free of bent, broken, missing or loose hardware? Y0 NO UQ N/AD Anchorage verfied SAT on 8/24/12.
3. Is the anchorage free of corrosion that is more than mild surface Y[R ND UD N/AO oxidation?

Anchorage verfied SAT on 8/24/12.

4. Is the anchorage free of visible cracks in the concrete near the anchors? YO NO UD N/AD Anchorage verfied SAT on 8/24/12.
5. Is the anchorage configuration consistent with plant documentation? Y0R NO U' N/AD (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Anchorage configuration verified to be consistentwith SEWS pacakge for 02R 18B043, dated 3/20/95 during walkdown performed on 8/24/12.

6. Based on the above anchorage evaluations, is the anchorage free of Y0 NEDur potentially adverse seismic conditions?

Anchorage verfied SAT on 8/24/12.

IEnter the equipment class name from Appendix B: Classes of Equipment Page 132 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 2 of, 'I Status: Y0 N[3 UM Seismic Walkdown Checklist (SWC)

Equipment ID No. Q2R18B043 Equip. ClassI 2 Equipment Description MOV POWER DISCONNECT SWITCH Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YN Nr: UD N/AD
8. Are overhead equipment. distribution systems. ceiling tiles and lighting, YZ NEI UC N/AD and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? Y0 NEI UQ N/A
10. Based on the above seismic interaction evaluations, is equipment free YI*Nr']UD of potentially adverse seismic interaction effects?

Other Adverse Conditions II. Have you looked for and found no other seismic conditions that could YNI NEI UCr adversely affect the safety functions of the equipment?

The cabinet internals were inspected and no missing fasteners were observed. All internalconnections and routedcables have been detwermined to be adequate and pose no adverse seismic condition.

Comments (Additional pages may be added as necessary)

SWC completed originally on 8/24/12 ol, i i Evaluated by: Ryan Harlos Date:

Tayl/or Youn eblood

- Tav .......

Yo... ...

V Page 133 of 234

  1. ACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSIO*

Qt-m~ I nfA, Page 134 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Page 135 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet I Of 4 Status: YZ NEI UU-Seismic Walkdown Checklist (SWC)

Equipment ID No. Q2R21BOO1D Equip. Class' 14 Equipment Description 120V REG PANEL 2F Location: Bldg. AUXILIARY Floor El. 139 Room, Area 2318 Manufacturer. Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage I. Is the anchorage configuration verification required (i.e., is the item one YZ NO of the 50% of SWEL items requiring such verification)?

Anchorage details are shown on SEWS for 02R21BOOID-4 (120V Reg.

Panel 2F)

2. Is the anchorage free of bent, broken, missing or loose hardware? Y9 NEI UrD N/AO Anchorage verfied SAT on 8/28/12.
3. Is the anchorage free of corrosion that is more than mild surface YZ NO UO N/AO oxidation?

Anchorage vertied SAT on 8/28/12.

4. Is the anchorage free of visible cracks in the concrete near the anchors? YO NEI UO N/AD Anchorage verfied SAT on 8/28/12.
5. Is the anchorage configuration consistent with plant documentation? Y0 NEI ur" N/AO (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Anchorage configuration verified to be consistent with SEWS pacakge for Q2R2 1BOO ID, during walkdown performed on 8/28/12.

6. Based on the above anchorage evaluations, is the anchorage free of YN NEI U potentially adverse seismic conditions?

Anchorage verfied SAT on 8/28/12.

' Enter the equipment class name from Appendix B: Classes of Equipment.

Page 136 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 2 of 4 Status: Y[ NEI u[-

Seismic Walkdown Checklist (SWC)

Equipment ID No. Q2R21B001D Equip. Class' 14 Equipment Description 120V REG PANEL 2F Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Y0 NO UO N/AD
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y(R NO UD N/AE" and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YN NO UO N/AD
10. Based on the above seismic interaction evaluations, is equipment free YO NO UO of potentially adverse seismic interaction effects?

No adverse seismic interactioneffects have been identified.

Other Adverse Conditions II. Have you looked for and found no other seismic conditions that could Y9 NO UO adversely affect the safety functions of the equipment?

The cabinet internals were inspected and no missing hardware or fasteners were observed. The cables inside the cabinet had adequate flex. No other adverse seismic conditions were observed.

Comments (Additional pages may be added as necessary)

SWC completed originally on 8/28/12.

Final walkdown performed on 3/7/13 to inspectcabinet internals. No adverse seismic conditions were noted during performance of the final walkdown.

Evaluated by: Ryan Harlos Date: /hl-3 1 1 Taylor Youngblood Page 137 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet Aof 4 Page 138 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 4 of a Page 139 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 1 of 8 Status: YM NEI U((

Seismic Walkdown Checklist (SWC)

Equipment ID No. Q2R21E009D Equip. Class, pV Equipment Description INVERTER 21 Location: Bldg. AUXILIARY Floor El. 121 Room, Area 2226 Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage I. Is the anchorage configuration verification required (i.e., is the item one Y0 NEI of the 50% of SWEL items requiring such verification)?

Reference SEWS for Q2R2 I E009D

2. Is the anchorage free of bent, broken, missing or loose hardware? Y[ NE UO N/A0
3. Is the anchorage free of corrosion that is more than mild surface YE NEI UD N/AO oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YCD NEI UO N/AOl
5. Is the anchorage configuration consistent with plant documentation? Y[D NEI UO N/AQ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Anchorage verified to be consistent on 9/10/12 againstSEWS.

6. Based on the above anchorage evaluations, is the anchorage free of Yt NEI UD potentially adverse seismic conditions?

Anchorage verified SA T on 9/10/12. SWC Addendum is being performed to inspect cabinet internals.

IEnter the equipment class name from Appendix B: Classes of Equipment.

Page 140 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 2 of 8 Status: Y[ N["] Ur"]

Seismic Walkdown Checklist (SWC)

Equipment ID No. 02R21E009D Equip. Class, 16 Equipment Description INVERTER 2D Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YZ NEI UC-] N/AO
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NCI UCI N/AC and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YN NCI UC N/AC
10. Based on the above seismic interaction evaluations, is equipment free YE NCI UC of potentially adverse seismic interaction effects?

No adverse seismic interactioneffects have been identified either external or internalto the cabinet.

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y0 NCI UC3 adversely affect the safety functions of the equipment?

The cabinet internals were inspected and no missing hardwareor fasteners were observed. The cables inside the cabinet had adequate flex and no other adverse seismic conditions were noted.

Comments (Additional pages may be added as necessary)

SWC completed originally on 9/10/12. Second performance being performed to inspect cabinet internals.

Second performanceof walkdown was performed to inspectcabinet internalson 3/25/13. No adverse seismic conditions were noted.

Date: 3I 2 Y/1 I

2 Page 141 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 3 of 8 Page 142 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 4 of 8 Page 143 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 5 of 8 Page 144 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 6 of 8 Page 145 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 7 of 8 Page 146 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 8 of 8 Page 147 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 1 of 8 Status: YZ NO U[-

Seismic Walkdown Checklist (SWC)

Equipment ID No. Q2R21LOO1D Equip. ClassI 14 Equipment Description VITAL AC DISTRIBUTION PANEL 2D Location: Bldg. AUXILIARY Floor El. 139 Room, Area 2318 Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage I. Is the anchorage configuration verification required (i.e., is the item one YO NEI of the 50% of SWEL items requiring such verification)?

Reference SEWS for Q2R21LOOID dated 6/30/93.

2. Is the anchorage free of bent, broken, missing or loose hardware? YIZ ND UD N/AD
3. Is the anchorage free of corrosion that is more than mild surface Y0 NDI UD N/A-'

oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors? YI ND UD N/AD
5. Is the anchorage configuration consistent with plant documentation? Y0 NDI UD N/AD]

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Anchorage verified to be consistenton 8/28/12 againstSEWS.

6. Based on the above anchorage evaluations, is the anchorage free of Y0 NEI UD potentially adverse seismic conditions?

Anchorage verified SAT on 8/28/12. SWC Addendum is being performed to inspect cabinet internals.

IEnter the equipment class name from Appendix B: Classes of Equipment.

Page 148 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 2 of 8 Status: YZ N[-I U' Seismic Walkdown Checklist (SWC)

Equipment ID No. 021321L001D Equip. Classý Equipment Description VITAL AC DISTRIBUTION PANi EL 2D Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YZ NEI UD- N/AQ
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YN NEI UI- N/A[I and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? Y123 NEI U'- N/A[
10. Based on the above seismic interaction evaluations, is equipment free Y[9 N[1 Ur-of potentially adverse seismic interaction effects?

No adverse seismic interaction effects have been identified either external or internalto the cabinet.

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y[D NOI UE" adversely affect the safety functions of the equipment?

The cabinetinternals were inspected and no missing hardware or fasteners were observed. The cables inside the cabinet had adequate flex and no other adverse seismic conditions were noted.

The cabinet was identified to contain misc. trash at the bottom of the cabinet. SWEs determined that this trash would have no impact to the equipment during a seismic event and only representeda housekeeping concern. OPS was notified and the miscellaneous trash was removed while the cabinet panel was open.

Comments (Additional pages may be added as necessary)

SWC completed originally on 8/28/12. A WB located with package F2-51.

Second walkdown was performed to inspect cabinet internals. No adverse seismic conditions were noted.

During the IPEEE walkdowns, Q2R21L LOOID was identified as an IPEEE Outlier due to the intemal circuitbreaker supportsystem being anchored to the cabinet with only 2 of 4 fasteners. During walkdown performed on 3/25/13, the circuit breakersupport system was properlyanchored using 4 of 4 fasteners. As a result, it is concluded that the IPEEE Outlier has been resolved.

Page 149 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 3 of 8 Evaluated by: RVan Harlos Date: 3__2.______

Talor Youngblood Page 150 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 4 of 8 Page 151 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 5 of 8 Page 152 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 6 of 8 Page 153 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 7 of 8 Page 154 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 8 of 8 Page 155 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet I Of 4 Status: YZ NEI U[-

Seismic Walkdown Checklist (SWC)

Equipment ID No. 02R36A0501 Equip. Class, Equipment Description 4.16 kV Switchaear2K Surcqe Ar restor Location: Bldg. SWIS Floor El. 188 Room, Area 72A Manufacturer. Model. Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage I. Is the anchorage configuration verification required (i.e., is the item one YO NO of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware? YN NEI UC N/AU The anchorage in the panel is free from potentiallyadverse seismic conditions.
3. Is the anchorage free of corrosion that is more than mild surface Y& NO UD N/AD oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YO NEI UQ N/AU
5. Is the anchorage configuration consistent with plant documentation? YO NEI UO N/AO (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of YO NO UD potentially adverse seismic conditions?

' Enter the equipment class name from Appendix B: Classes of Equipment.

Page 156 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 2 of 4 Status: YN NE] uE[

Seismic Walkdown Checklist (SWC)

Equipment ID No. 02R36A0501 -Equip. Class'. 3 Equipment Description 4. 16 kV Switchaear 2K Surge Arrestor Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Y0 ND UD N/AD
8. Are overhead equipment. distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

YZ NEI UD N/AD

9. Do attached lines have adequate flexibility to avoid damage?

Y* NO UD

10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Other Adverse Conditions II. Have you looked for and found no other seismic conditions that could YE3 NEI UD adversely affect the safety functions of the equipment?

All equipment inside the panel was adequatelyrestrainedwith no loose connections and no missing bolts. IPEEE walkdowns noted cracked concrete and loose anchorage. The walkdowns confirmed that this issue is resolved and no loose anchorageor cracked concrete was observed.

Comments (Additional pages may be added as necessary)

SWC originallycompleted on 8/29/12. Final walkdown performed to inspect panel internalsand complete anchorageverification.

Area walk-by was completed 8/30/2012.

Evaluated by: Laura MaclaviDate _A_..--_______A Tern,'Alan Mullel" aj V_12-013 Page 157 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 3 of 4 Page 158 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 4 of 4 0

Page 159 of 234 I

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 1 of 5 Status: YN NE- U-Seismic Walkdown Checklist (SWC)

Equipment ID No. Q2R41LOO1A Equip. Class, 14 Equipment Description 125VDC DISTRIBUTION PANEL 2_A Location: Bldg. AUXILIARY FloorEl. 155' Room, Area 471 Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage I. Is the anchorage configuration verification required (i.e., is the item one YrI NO of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware? YO NOI UD N/AD
3. Is the anchorage free of corrosion that is more than mild surface YO NEI U0 N/AD oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YO NOI UO N/AD
5. Is the anchorage configuration consistent with plant documentation? YFI NOI UF" N/AO (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of YO NEI UrO potentially adverse seismic conditions?

IEnter the equipment class name from Appendix B: Classes of Equipment.

Page 160 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 2 Of 5 Status: YU NE] U[l Seismic Walkdown Checklist (SWC)

EquipmentID No. O2R41LOOIA -Equip. Class, 14 Equipment Description 125 VDC DISTRIBUTION PANEL 2A Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YZ N' UD" N/AD
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y[9 ND UD N/AD and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YZ ND UD N/AD
10. Based on the above seismic interaction evaluations, is equipment free YI ND UD of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YZ ND UD adversely affect the safety functions of the equipment?

No adverse seismic conditions were observed. As shown in the photos attached,the breakersappearto be in good condition.

Comments (Additional pages may be added as necessary)

The Area Walk-By for room 471 is included in walkdown package F2-042.

Evaluated by: Tayvlor Younciblood i 0 21QEn yeg 3 V..Q mA Date: s- -1"3 Brian Nelson .C ~ :~ ~ . S-f 2 Page 161 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 3 of ;

Page 162 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 4 of -

Page 163 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet ofr Is Page 164 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 1 of 5 Status: YS N[-] UM Seismic Walkdown Checklist (SWC)

Equipment ID No. Q2R42E0O1A Equip. ClassI 16 Equipment Description Batter' Charqer24 Location: Bldg. AB Floor El. 121 Room. Area 2224 Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage I. Is the anchorage configuration verification required (i.e., is the item one YI NE of the 50% of SWEL items requiring such verification)'?

Anchorage was verified in walkdowns dated 8/29/12

2. Is the anchorage free of bent, broken, missing or loose hardware? YZ NO UD N/AED The anchorageis free from potentiallyadverse seismic conditions.
3. Is the anchorage free of corrosion that is more than mild surface YE NEI UD N/AD oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? Y9 NEI UE N/AO
5. Is the anchorage configuration consistent with plant documentation? Y0 NO UO N/AO (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Anchorage is consistentwith SEWS package dated 6/28/93.

6. Based on the above anchorage evaluations, is the anchorage free of YN NO UI-potentially adverse seismic conditions?

I Enter the equipment class name from Appendix B: Classes of Equipment.

Page 165 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 2 of 5 Status: Y0 NE] u"]

Seismic Walkdown Checklist (SWC)

Equipment ID No. 02R42EO01A Equip. Class, 1I Equipment Description Battery Charger2A Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YZ NEI U[-] N/AU
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YO NCi UF N/AU and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YZ NO U- N/AU
10. Based on the above seismic interaction evaluations, is equipment free Y[ NEI U-of potentially adverse seismic interaction effects?

Other Adverse Conditions I1. Have you looked for and found no other seismic conditions that could YN NE Uti adversely affect the safety functions of the equipment?

All equipment inside the battery chargerwas adequately restrainedwith no loose connections and no missing bolts.

Comments (Additional pages may be added as necessary)

SWC originally completed on 8/29/12. Finalwalkdown performed to inspect batterychargerand complete anchorage verification.

Area walk-by completed 8/29/12.

Evaluated by: Date: '-/14/113 Page 166 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 3 of 5 Page 167 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 4 of 5 Page 168 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 5 of 5 Page 169 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet i of 5 Status: YZ NO UM Seismic Walkdown Checklist (SWC)

Equipment ID No. Q2R43E00B Equip. Class, 20 Equipment Description SEQUENCER B2G Location: Bldg. AUXILIARY Floor El. 121' Room, Area 2229 Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YN NEI of the 50% of SWEL items requiring such verification)?

Reference SEWS package for Q2R43EO01B dated 7/1/93

2. Is the anchorage free of bent, broken, missing or loose hardware? YS NEI UO N/AO Anchorage verified SAT on 8/21/12.
3. Is the anchorage free of corrosion that is more than mild surface YZ NO UO N/AO oxidation?

Anchorage verified SAT on 8/21/12.

4. Is the anchorage free of visible cracks in the concrete near the anchors? YZ NOI UO N/AO Anchorage verified SAT on 8/21/12. Noted from 8/21/12 walkdown:

10mm concrete crack identified in SEWS package could not be located.

Avery small crack runs in the same location but it is nearly inperceptible,therefore, OK. The SEWS package also concludes that the crack should not affect capacity.

5. Is the anchorage configuration consistent with plant documentation? Y9 NO UO N/AO (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Anchorage configurationverified to be consistent with SEWS package for Q2R43EOO1B, dated 7/1/93 during walkdown performed on 8/21/12.

6. Based on the above anchorage evaluations, is the anchorage free of YN NO UO potentially adverse seismic conditions?

Anchorage verified SAT on 8/21/12.

I Enter the equipment class name from Appendix B: Classes of Equipment.

Page 170 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 2 of075 e/l,,

Status: YZ N[-] U--

Seismic Walkdown Checklist (SWC)

Equipment ID No. Q2R43EOOIB Equip. Class' 20 Equipment Description SEQUENCER B2G Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Y0 ND UD N/AD
8. Are overhead equipment, distribution systems. ceiling tiles and lighting. YS NDI UD N/AD and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YO ND UD N/AD
10. Based on the above seismic interaction evaluations, is equipment free YO ND UD of potentially adverse seismic interaction effects?

Other Adverse Conditions II. Have you looked for and found no other seismic conditions that could YN ND UD adversely affect the safety functions of the equipment?

The cabinet internals were inspectedand no missing fasteners were observed. All internalconnections and routed cables have been determined to be adequate andpose no adverse seismic condition, Comments (Additional pages may be added as necessary)

SWC completed originallyon 8/21/12.

AVM poacV,,.*'t.,r_ r2 -R0. 1tv-1

-9sl/

Evaluated by: Ryan Harlos 5~/j am Date: zb a Ta v'Mr Youngblood -4~~ft UU-D U0 - 7 /1 Page 171 of 234

  1. ACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSIONO Page 172 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 0

x1 Page 173 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Page 174 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 1 of 5 Status: YJ NO UI-Seismic Walkdown Checklist (SWC)

Equipment ID No. 02R43EO02A Equip. Class' 20 Equipment Description Sequencer 82F Aux Panel Location: Bldg. AB Floor El. 139' Room, Area 2343 Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e.. is the item one YO NEI of the 50% of SWEL items requiring such verification)?

Anchorage verified in walkdo wns dated 10/25/12.

2. Is the anchorage free of bent. broken, missing or loose hardware? YZ NO UD N/AO The anchoragein the panel is free from potentiallyadverse seismic conditions.
3. Is the anchorage free of corrosion that is more than mild surface YZ NO UO N/AO oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YO NO UO N/AO
5. Is the anchorage configuration consistent with plant documentation? YE NOI UO N/AO (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Anchorage in the panel was verified on 10/25/12and is consistent with SEWS package dated 7/1/93.

6. Based on the above anchorage evaluations, is the anchorage free of YER NO UO potentially adverse seismic conditions?

IEnter the equipment class name from Appendix B: Classes of Equipment.

Page 175 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 2 of 5 Status: YZ NEI U[-

Seismic Walkdown Checklist (SWC)

Equipment ID No. 02R43E002A -Equip.

Equipment Description Sequencer B2F Aux Panel Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Y9 NO UE N/AQ
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YS NO UD N/AO and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YI Nfo UD N/AC
10. Based on the above seismic interaction evaluations, is equipment free Yo NO UQ of potentially adverse seismic interaction effects?

Other Adverse Conditions II. Have you looked for and found no other seismic conditions that could YL@ NO UD adversely affect the safety functions of the equipment?

All equipment inside the sequencerpanel was adequatelyrestrained with no loose connections and no missing bolts.

Comments (Additional pages may be added as necessary)

SWC originallycompleted on 10/25/12. Final walkdown performed to inspect panel internals and complete anchorage verification.

Area walk-by was completed 8/29/2012.

Date: 9-/i 2-1,.

2 12./2.0I Page 176 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 3 of 5 02R43EODA-A SEQ BuS ZF AUX PNL I

Page 177 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 4 of 5 Page 178 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 0

Sheet 5 of 5 Page 179 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 F 2, Sheet 1of 4 Status: Yo N[] UE]

Seismic Walkdown Checklist (SWC)

Equipment ID No. Q2R43E0O2B Equip. Class' 20 Equipment Description SEQUENCER B2G AUX RELAY PANEL Location: Bldg. AUXILIARY Floor El. 121 Room. Area 2233 Manufacturer, Model, Etc. (optional but recommended) -

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage I. Is the anchorage configuration verification required (i.e., is the item one Y0 NE of the 50% of SWEL items requiring such verification)?

Reference SEWS package for Q2R43E002B dated 7/2/93

2. Is the anchorage free of bent, broken, missing or loose hardware? Y[ N["] UD N/AD Anchorage verfied SAT on 8/21/12.
3. Is the anchorage free of corrosion that is more than mild surface Y0 NEI UO N/AO oxidation?

Anchorage verfied SAT on 8/21/12.

4. Is the anchorage free of visible cracks in the concrete near the anchors? YU NOi UID N/AEJ Anchorage verfied SAT on 8/21/12.
5. Is the anchorage configuration consistent with plant documentation? YIN NO UO N/AO (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Anchorage verfied SAT on 8/21/12 using SEWS package dated 7/2/93.

6. Based on the above anchorage evaluations, is the anchorage free of Y0 NEI UD potentially adverse seismic conditions?

Anchorage verfled SAT on 8/21/12.

SEnter the equipment class name from Appendix B: Classes of Equipment.

Page 180 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 2 of 4 Status: YZ NEI U--

Seismic Walkdown Checklist (SWC)

Equipment ID No. Q2R43E002B Equip. Class' Equipment Description SEQUENCER B2G AUX RELAY 'PANEL Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YN NO UD N/AO
8. Are overhead equipment, distribution systems. ceiling tiles and lighting, YIC NE UQ N/AD and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YZ NEI UQ N/AQ
10. Based on the above seismic interaction evaluations, is equipment free YZ NO UO of potentially adverse seismic interaction effects?

Other Adverse Conditions 1I. Have you looked for and found no other seismic conditions that could YW ND UO adversely affect the safety functions of the equipment?

The cabinet internals were inspected and no missing fasteners were observed. All internal connections and routedcables have been determined to be adequate and pose no adverse seismic condition.

Comments (Additional pages may be added as necessary)

SWC completed originally on 8/21/12 Final walkdown performed orNQWA-X to inspect cabinet internals. No adverse seismic conditions noted. a'/, ip .

Evaluated by: Ryan Harlos Date:

Tavlor Youngblood &A W Page 181 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 3 of 4 0

4o I

i ..U 2 Q2R43002B-Page 182 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 4 of 4 Page 183 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 1 of 5 Status: Y[E NE] U--

Seismic Walkdown Checklist (SWC)

Equipment ID No. Q2R16B0006A Equip. Class, 2 Equipment Description 600V Load Center 2D Location: Bldg. AB Floor El. 139' Room, Area 2335 Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage I. Is the anchorage configuration verification required (i.e., is the item one YE NZ of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware'? Y[ NEI UE N/A[]
3. Is the anchorage free of corrosion that is more than mild surface Y[ NE UE N/AE:]

oxidation?

Confirmed SAT on 2/12/13

4. Is the anchorage free of visible cracks in the concrete near the anchors? Y- NE UE N/A-Confirmed SAT on 2/12/13
5. Is the anchorage configuration consistent with plant documentation? YZ NEI UE N/AE-1 (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

SEWS package dated 7/2/93 documented 28 1/2" plug welds (4 in each panel) at the embedded steel underneath the front and rear of the load center. Plug welds were also observed attachingthe load center to anotherembedded steel that were not documented in the SEWS package, for a total of 42 plug welds.

6. Based on the above anchorage evaluations, is the anchorage free of YZ NEI UE potentially adverse seismic conditions?

Confirmed SAT on 2/12/13 Enter the equipment class name from Appendix B: Classes of Equipment.

Page 184 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 2 of 5 Status: YO NO U-Seismic Walkdown Checklist (SWC)

Equipment ID No. Q2RI6BOOO6A Equip. Class' 2 Equipment Description 600V Load Center 2D Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YE NO UE N/AE
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NEI UL N/AE1 and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YN NEI UE N/AE
10. Based on the above seismic interaction evaluations, is equipment free YN NE U7 of potentially adverse seismic interaction effects?

Other Adverse Conditions I1. Have you looked for and found no other seismic conditions that could YE NZ UE adversely affect the safety functions of the equipment?

Two Agastat relays in upper east panel are mounted with two bolts.

The relays were seismically qualified with four bolts and therefore are missing two bolts. It is evident that four bolt holes were drilled into the panel door, however the relays were mounted too high and only two bolts could be provided. CR 589508 was written to document this condition.

The tall cabinet on the west side of the front of the load center contains a plastic wire chase for the routing of cable. The cover of the wire chase had previously slid down onto a heating element at the base of the panel and had melted. The cover was restored to its original position, but no action was taken to restrainit from future sliding and therefore a potential fire hazard exists during or after a seismic event.

CR589480 was written to document this potentially adverse seismic condition.

Comments (Additional pages may be added as necessary)

SWC originally completed on 8/29/12. Final walkdown performed to inspect cabinet internals and complete anchorage verification.

Area walk-by was completed 8/29/2012.

L.M'%CI~pl" Evaluated by: Laura Maclay L J 1pid.tc Date: 03 og, 120J4 ulleni 7 Te X A-on 3/10 14t3 Page 185 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 3 of 5 Page 186 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 4 of 5 Page 187 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 5 of 5 Page 188 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet i of 21 Status: Yo NE] UF-]

Seismic Walkdown Checklist (SWC)

Equipment ID No. 02R17B001-A Equip. Class' I Equipment Description MCC 2A Location: Bldg. AUXILIARY Floor El. 139' Room, Area 2332 Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage I. Is the anchorage configuration verification required (i.e., is the item one YD NO of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware? YED ND UD N/AD MCC walked down on 8/28/12. MCC Welded to floor with no issues noted during walkdown.
3. Is the anchorage free of corrosion that is more than mild surface YO NDI UD N/AD oxidation?

MCC walked down on 8/28/12. No adverse seismic conditions were noted.

4. Is the anchorage free of visible cracks in the concrete near the anchors? YN ND UD N/AD MCC walked down on 8/28/12. No adverse seismicconditions were noted.
5. Is the anchorage configuration consistent with plant documentation? YD ND UD N/A0 (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

N/A - Not part of 50% anchoragecheck.

6. Based on the above anchorage evaluations, is the anchorage free of Y0 Nil UD potentially adverse seismic conditions?

The anchoragewas determined to be sat on 8/28/12.

IEnter the equipment class name from Appendix B: Classes of Equipment.

Page 189 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 2 of 21 Status: Y0 NEI U-]

Seismic Walkdown Checklist (SWC)

Equipment ID No. 02RI7B001-A Equip. Class, 1 Equipment Description MCC2A Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YZ NCi UOI N/AQ-The interaction effects were walked down on 8/28/12. No adverse seismic conditions were identified.
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YI@ NEl UQ- N/A[]

and masonry block walls not likely to collapse onto the equipment?

The interaction effects were walked down on 8/28/12. No adverse seismic conditions were identified.

9. Do attached lines have adequate flexibility to avoid damage? Y9 NEI U-I N/AI-The interaction effects were walked down on 8/28/12. No adverse seismic conditions were identified.
10. Based on the above seismic interaction evaluations, is equipment free YN NEl U[-

of potentially adverse seismic interaction effects?

No potentiallyadverse seismic interactioneffects are present.

Page 190 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 3 of 21 Status: YN N[] U[-]

Seismic Walkdown Checklist (SWC)

Equipment ID No. Q2R17B001-A Equip. Class, I Equipment Description MCC 2A Other Adverse Conditions I1. Have you looked for and found no other seismic conditions that could YE NEI UQ adversely affect the safety functions of the equipment?

The cabinet internalswere inspected and all routed cables have been determined to have adequate flex, routed in an acceptable fashion, and pose no adverse seismic condition.

CR 640948 has been written to document the following condition identified: There were eleven instances identified where seismically qualifiedAgastat Relays were installed with less than the standard four requiredmounting screws. This condition has been evaluated for the 2A MCC, which is attachedto TE 640206, and it has been determined that the currentmounting configurationdoes not adversely impact the functionality of the relay in any of its operatingmodes (before, during, or after a DBE). As a result, the condition does not bring into question the operabilityof the relays. A copy of the evaluation has been attached to the SWC.

Although the relays remain functional and operable, the relays should be installed with the intended mounted configuration of four screws at the earliestopportunity.

The relays associatedbreaker cubicle locations andaffected loads are documented below (reference Unit 2 Load List A351199):

BKR FAA4 - 2A RHR/LHSI PUMP ROOM COOLER FAN BKR FAA7- 2A CTMT SPRAY PUMP ROOM COOLER FAN BKR FAB3 - 2.A PENETRATION ROOM RECIRC FAN BKR FAF7 - 2A REACTOR CA VITY COOLING FAN BKR FAH5 - CHARGINGIHHSI PUMP ROOM COOLER 2A FAN BKR FAI4 - CCW PUMPROOM COOLER 2A FAN BKR FAJ4L (2 Relays) - 2D CTMT POST LOCA AIR MIXING FAN BKR FAJ4R (2 Relays) - 2C CTMT POST LOCA AIR MIXING FAN BKR HA02 - 2A PENETRATION ROOM EXHAUST FAN Based on the evaluation for the as-found condition of the Agastat Relays being acceptable, it has been determined that this does not represent an adverse seismic condition.

Page 191 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 4 of 21 Status: YE NEF Ur Seismic Walkdown Checklist (SWC)

Equipment ID No. 02R17B001-A Equip. Class' I Equipment Description MCC2A Comments (Additional pages may be added as necessary)

SWC completed originallyon 8/28112, A WB is in F2-23.

Second walkdown was performed on 5/15/13 to inspect the MCC 2A cabinet internals. No adverse seismic conditions were noted during performance of the final walkdown.

02R I 7BOO 1-A was identified as a Seismic Outlierduring the IPEEE walkdowns. There was a potential interactionfrom an unrestrainedcart and inadequateanchorage.The IPEEE Outlier has been determined to be resolved. There was not an unrestrainedcart in the area and the MCC has been anchored to the rearwall at the top of the cabinetin multiple locations.

Evaluated by: Ryan Harlos . Date: i-A,/'-S Brian NelsonI Page 192 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet S of 21 Page 193 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 6 of 21 Page 194 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 7 of 21 Page 195 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 8 of 21 Page 196 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 9 of 21 Page 197 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 10 of 21 Page 198 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 SENERCON 05-16-13 TECHNICAL EVALUATION FOR AGASTAT RELAY MODEL #WS E7012AC004 AND E7012AF004 IN MCC 2A (Q2RZ.7Beeel-A) AB EL. 139' ROOM NO. 2332, FNP UNIT 2 IN RESPONSE TO CR# , REF. TE-640206 PROBLEM: Eleven (11) relays requiring four screw mounting configurations were found in the field with either only two or three mounting screws.

Demonstrate the technical adequacy of the anchorage and the seismic adequacy of the relays to perform their functions before, during, and after a DBE.

DETAILS: The as-found configurations of the relays are as follows:

four (4) relays were found with three screws, three (3) relays were found with two screws in diagonal corners; three (3) relays were found with two screws in a horizontal line and; one (1) relay was found with two screws in a vertical line.

The relays' associated breaker cubicle locations and affected loads are as documented below (taken from the FNP U2 Load List A351199):

Q2R17BKRFAA4 - 2A RHR/LHSI PUMP ROOM COOLER FAN Q2R17BKRFAA7 - 2A CTMT SPRAY PUMP ROOM COOLER FAN Q2R17BKRFAB3 - 2A PENETRATION ROOM RECIRC FAN Q2RI7BKRFAF7 - 2A REACTOR CAVITY COOLING FAN Q2R17BKRFAH5 - CHARGING/HHSI PUMP ROOM COOLER 2A FAN Q2R17BKRFAI4 - CCW PUMP ROOM COOLER 2A FAN Q2R17BKRFA34L (2 Relays) - 2D CTMT POST LOCA AIR MIXING FAN Q2R17BKRFA34R (2 Relays) - 2C CTMT POST LOCA AIR MIXING FAN Q2R17BKRHA02 - 2A PENETRATION ROOM EXHAUST FAN RESPONSE: Seismic test report U-419260 Version 3.0 demonstrates that the subject relays were tested and found adequate for their non-operating mode (relay coil de-energized off-delay relays timed out), operating mode (relay coil energized on-delay relays timed out), and transitional mode (time relay delay) with nominal rated voltage less 10% applied to coils.

APPROACH: This evaluation consists of two elements to be verified; (a) structural adequacy of the anchorages, and (b) seismic adequacy of the relays in their as-found conditions.

The evaluation focusses on the assessment of the as-found configurations of 2 screws on a horizontal line and two screws on a vertical line. These assessments envelope all of the subject relay configurations.

Page I Page 199 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0

p. vL 7 k

ýj ENERCON 05-16-13 TECHNICAL EVALUATION FOR AGASTAT RELAY MODEL #'S E7012AC004 AND E7012AF004 IN MCC 2A (Q2R17B0e01-A) AB EL. 139' ROOM NO. 2332, FNP UNIT 2 IN RESPONSE TO CR# , REF. TE-64e2e6 A. Anchorages were demonstrated to have an interaction ratio of 0.28.

This was based on the accelerations from the horizontal DBE with 5%

damping and vertical DBE with 5% damping amplified with an in-panel amplification factor and a multi-mode factor. The capacity of the screw was compared to the demand on the screws. The multi-mode factor used in the computation was taken from IEEE 344-1975 and the in-panel amplification factor was taken from EPRI NP-7148 and Calculation No.

C891579.

Note: Assessment of the interaction ratio for loads on the screws should normally include the effect of shear in combination with the tensile loads. In this case, since the assessment is very conservative, as in the case of using an amplification factor of 7 for the MCCs (in lieu of an amplification factor of 3), this was neglected. This is reasonable.

8. The relays were demonstrated to operate without chatter based on the computation of the stiffness of the mounting plate with the two most conservative configurations of as-found, existing anchorage. For these cases it is shown that the stiffness of the as-found condition does not contribute to the amplification of the accelerations acting on the relays.

Therefore, the testing conducted in accordance with the referenced seismic report remains valid and applicable to the as-found configurations.

CONCLUSION: The as-found configurations of the eleven subject relays do not adversely impact the seismic qualification of the relays, nor their functionality in any of their operating modes (during, before, and after a DBE).

However, the missing screws need to be re-installed to be consistent with the seismic test configuration and to maintain all design margins.

PREPARED: Dinesh Patel / 5-16-2013 0 ENERCON Services REVIEWED: Paul A. Miktus / 2 ENERCON Services Page 2 Page 200 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0

-p.  %-I .0c -a%

~Y~*i~tofDý-i V&WW' Itofi 4vjto-kIy_

t~(~7I NS I51.

I~.LLSU wvs 0 14,52

.751 ~ 0 L111.I Wo~

EAO~

A, JO 0 T, 1 *32 se eptmodlk-A roV

  • p *ef
  • t*# *-/ r-- *~ IVZ £n~yv4eA~ a~i ed nWIb W40 V4 lb

- 2 07 .- e l /* . e r* 5 - IO4 *.

, I0 go-TA* 0.4.= L 0.'= IA -t,o,D ' - --

rla+C CA4md'4c l{vcw,L4L. 6 - -4wo - W it 4 c-ae. w.II-,

0A j soyroJ

+i -

( ~ ~'. ,3 n s,.%reVo .164 "

LW 0.

ILTO1AL 52 1/ *"*) I7'¶ CoK.4,, 11We t 6b."

/4%to -65 Page 201 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 P. a'i .CX Z%

K~

-_L ,o 5b S

114i fZsII4

';01-G Hz 7 33 1+-1 2 lY raA

'/11 Page 202 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 pp.. Ii p t XD\

M- 7012. 7OU MODEL 07014, M=724 Amy -vtil,4 E\A 1As1 L E7014," 4 "

1 f;Ji *.

I"13s Uset .f VeaviI (50,%V~lB~ afp(S+ -1 C,* = t' I

  • t. Z A~,

ct-* 4. &ce~e~~'v x*,5 " -k.,e4 .

.2j T.,'" - 44. = 0. 1.. -'ý,:"

A_ 4W---.

I. ec .~ 1ci-,1, pLste-

&b~4'4c

~eakt~ ~- -wo- Wit tuA-4e...

X8qq xto.-. o 2- l

~~

K~~~ret ~*7 167 1(qoo~o IS)UI~ 5c-rew 1/2.., (see "e

)

(1.+44 )'

I,10'1'A,- I/(*1'*,t" /o1 "t0 .4- 4 ý*I/~

"m Page 203 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 IC 7aO.48052Z hattUI~ L'oiio'1 (Ve,41ccol at, oriynt-l ) I's Very two thc eLal wa se,ýsmw~c.dIj J"UfLW . The C9RHY1 4 vtr At AjasfaVula y I%i\ f vopd4 fit ohX0 ~~ ~n~~

Page 204 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0

p. *, *Q ~
ts -(!

Cr VV S Thread DIMMSI.ons Basic maw path T


xsfcawbed

&AfSr~~d------------------[r EXTERNAL THREADS FOR MACHINE SCREWS AND SEMS ,MtE B 1.1 Nominalpewsize series Alowance M Dlsidmtr PitCh Mainagier Tenmsp k*& 0..Ilinatico Milx Mii MaX MlIn TOIlumGice In bltndn mm in Ma 114nlb.. rmin.

04.0, o0o60 IM .oo00 o . .66 o69 0o31. 0o4o6 .oo~

144 0.073 LMC -006 0724 06M .0623 060 .0m2 348 0.066 UNC AM?0 .0034 09135 .0736 0023

.f7 6.40 0.125 UNC .0008 .1242 .1191 .1060 .1064 .002 0.00796 470 8-32 0.184 UNC .0009 .1631 .1671 .142 .1399 0029 0.0140 850 10-32 0.190 UF .0009 A1M .1631 .16 168w .0030 00200 12W0

- -~R' - - - --

114.20 0.=5 UNC .0011 u .2M8 20 .2164 .2127 007 0L0318 1900 114-3 ' o.2 , 1 c .o 80 .2496 1156o .22 .2,56 k .00 o 0.0'4 S/O-18 0.312 UNC .0012 .3113 .3016 .272 .2712 .0040 0.041 3160 Imold 0756 (MO .001 .3"t MC4I 33 1 46 04 .76 48 112-13 0.50 I N 49 AM1 A.876 4"a 1 4435 .0060 0.1419 8600 m wNomina Soma, Lano TLo on Toleaceoan 8l ewk Sa So Up V2i. .i.rtli.id Over I to 21In., Md. OWW 2 in.

2o L-003 .03 -0.06 .90.0 114UMi3I -0.03 O3 -0.06 10 .0.0

'Trensile Wangd values are brAsd on 60,000 psi,.inlpl" to carbon stea scews mid SEMS onlly. Hueand hexWistler heed machine screw or stilcetf Ieno may bewedgpe tensile testd, Maw head stWemfaybe musia tesie tesed.

'710 0

Page 205 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 0

CALCULATION SHEET J;):?______________ DATE *// )/7 IECKERt DATE DESIGNER

,.- ~~/d~ ~ A A~ P ~~ ' ~ ~" - ~ ~~ __ ~_ . o o~

N _

Sa MI.,'-

SUBJECT "46rrc-03 00 -0 61 Page 206 of 234

NO. SNCF164-RPT-02, VERSION 2.0 ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS CALCULATION SHEET DESIGNER 7 ' 4,,, 4/6 DATE-; ZZ 7- PtIECKIR i . 71J DATE-21"~

NO.

LE l-ev vovýA &wylJOB

"'Y' NO.......

SKEET p..

'I T +hf' -2 __

tI ( IF

.. rT i ,___ ,, ... .

  • .Z*--*' * "© * ,. -
3. - , r 0__- * ,-.;I.,

S- . ---- , .','

'+"" - , ' . -"

Page 207 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 P*- .- 2 ,.0 Q -.

CALCULATION SHEET

~/

DEVSIGNER DATEAI&2L2.-..-WCKER '~~ ~ 1 DATE m* v .m . FAKLE$y Lit-LEAR -PLAN !LAI-rT$lit jw.-2PW-C SUBJ.ECTM~ AE~RrON I4ofLTIA-SoUL)1-i- D IRtc11O--i4 ON 9.I*

r 1~ 1U.L 4 c1. 1 0.38.7 08 :.373 .571.114q7 .. 8 t J6 2 12.471 117 2ý . 14 (.01 2~.433 11.822-11-I.22-91A. -7 10 3 3. 81i 2-03 3i11750 '. 9 0 7 . 2.41 7 t~~k I 4~. 41 45j.2O00 ; 2. I2'M2II-ii-;' ---446-3.307 ~J(i.~

I 7 k5.820 +4.COB'2.(4 4 ;, .50 ,5.-5'47 14-.02-..2703- 1 .r 16.2 :4.000 '2-644 0-360 :6.5(o7:4,101-12.703 111.940 540 I EAC 3 T1 57~S DlRývTIONt I fNot)E PoiiiT'/~

0 ~tPN- FACTOTr.S 1%ý7 BE 6O7~

1-.1-47 .7ý4-4 *5-

-f GS 47 1.2 __ '99 49 2 T2.209- L378 1 -637 .414- 1.9-77 1.431:*951 -sb Ii 14-S!1. 0SZ er-257 3.04! 2-0:23 iý176

.5~543. (,S7 1.23.7 I.,' (o S.OPO :3. (OZ. 2.'Z0 i1. 4O&-

[ 7 014.3117 2-453 1.324 6.004 4-314-'l.66 1-t-4-'

7T- -0/ 432527 2. ( 5 3 1.32 4 6.004 4-314 984 1-46-.

ýA 1011 Page 208 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0

- 4 CALCULATION SHEET DATEVP-02%. ECKER- F-D~ATE - 2.

InE AR LE Jc..LEA P R PL A-m* JTN IT; i~ "a.5~-

SUJC 5 Q m1P &R Y RE A -Se tiC. MI ACCELFlRA7jLOAI C, VF-RrTcC-,L' DIRec-TioN fioC>F- OBE-DAM PING-.FAvroRs DBF.- DAmplmGL!AC7OI;ý"

I cm~~ 1. 89m0 '.G.oI 3 D~jo 1.001 .74-6 1.45-3

.390 'i.437 1. 4j..4 (2 1gi(

T 2.J'4~

A~~~~~~

AA..I 5"J 619

!A.+/-9jl.O 1 3 .. 8j~,.4

  • ~

L...IZ...Ji~2'Li 1' '~ / .7g C '5 .- 2- 1-47J 0-2.58 T V 1.479 iI.Is I 1.785_.4.437 I

I 1-703 I1.242-- I I

1170 .03 i9 -4 t-73_ Ill. 03 I 6'~5 .552..

I .203~ tL7ý)

21.7 .

A A441.731 i !P 11-303 a

ail

~~/1I Page 209 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet I of 12 F2- ikl Status: YZ NEI Ur Seismic Walkdown Checklist (SWC)

Equipment ID No. Q2R17B098-A Equip. Class, I Equipment Description MCC 2CC Location: Bldg. AUXILIARY Floor El. 155 Room, Area 2409 Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage I. Is the anchorage configuration verification required (i.e.. is the item one YO NZ of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware? YO NO UC N/AO MCC walked down on 8/29/12. Determined to be bolted to inverted channel welded to embed in pad. Reference SWC performed on 8/29/12.
3. Is the anchorage free of corrosion that is more than mild surface YI9 NO UO N/AO oxidation?

MCC walked down on 8/29/12. No adverse seismic conditions were noted.

4. Is the anchorage free of visible cracks in the concrete near the anchors? Y[K NO UO N/AO MCC walked down on 8/29/12. No adverse seismic conditions were noted.
5. Is the anchorage configuration consistent with plant documentation? YO NO UO N/AO (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of YS NEl UO potentially adverse seismic conditions?

The anchoragewas determined to be sat on 8/29/12.

Enter the equipment class name from Appendix B: Classes of Equipment.

Page 210 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 2 of 12 Status: YN NO UE-Seismic Walkdown Checklist (SWC)

Equipment ID No. 02R17B098-A Equip. Class, Equipment Description MCC 2CC Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YZ N[E] U[3 N/An
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YN NEI UO] N/A[D and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? Y0 N[3 UB N/AO
10. Based on the above seismic interaction evaluations, is equipment free YO NCi UO of potentially adverse seismic interaction effects?

No adverse seismic interactioneffects have been identiifed to either the externalor internalportions of the cabinet.

Other Adverse Conditions I1. Have you looked for and found no other seismic conditions that could YI NE UD adversely affect the safety functions of the equipment?

The cabinet internals were inspected andno missingI/ardware or fasteners were observed. The cables inside the cabinet hadadequate flex. No other adverse seismic conditions were noted.

Page 211 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 3 of 12 Status: YN N[I UL]

Seismic Walkdown Checklist (SWC)

Equipment ID No. Q2R17898-A Equip. Class' 1 Equipment Description MCC 2CC Comments (Additional pages may be added as necessary) li*pt SWC completed originally on 8/29/12. A'- lo ra

  • pac.;t* FZ - I'. . C'Lol, Final walkdown performed on 3/19/13 to inspect cabinet internals.No adverse seismic conditions were noted during performance of the final walkdown.

02R1 7BO98-A was identified as a Seismic Outlierduring the IPEEE walkdowns. The outliers, as documented in the SEWS package for Q2RI 7BO98-A dated 7/5/93 were the following:

1.)MCC has a weld in the rear comers and no otherlocations in the rear.This weld configuration results in an unsupportedspan of 8'4" between welds to resistuplift.

2.) The unsupportedspan in #1 could also be an impact source which could potentiallyresult in relay chatter 3.) 0" gap between back top of MCC and concrete mass on the adjacent wall. This is also a potentialimpact source.

The proposed methods for resolving the outlier was either to attach the MCC top to the adjacent wall (would resolve all 3 concerns listed above) or if modal testing could demonstrate that fn > 8 Hz, then the concrete mass could be removed, which would remove the interactionbetween the wall and the rear of the MCC.

As stated in Attachment E of the SEWS Package,adding anchorageto the rear top of the MCC at the left, center, and right sides of the cabinet would resolve the potential impactsources between the concrete patch and the MCC and the potential impact source as a result of the large unsupported span. The walkdown confirmed that the MCC has been anchored to the wall in the three recommended locations.(Reference Sheets 9, 10, and 11 of 12) Additionally,the concrete mass identified during the IPEEE walkdowns has also been verified to be removed (Reference Sheet 12 of 12). As a result, all IPEEE outliers have been resolved.

Evaluated by: Ryan Harlos Date: M Taylor Younblood Page 212 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 4 of 12 0

Page 213 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 5 Of 12 Page 214 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 6 of 12 Page 215 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 7 of 12 Page 216 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 8 of 12 Page 217 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet o of 12 Page 218 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 10 of 12 Page 219 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 0 Sheet ii of 12 Page 220 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 12 of 12 4

ýlk ý Page 221 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet i of 9 Status: YN NEI UE' Seismic Walkdown Checklist (SWC)

Equipment ID No. 02R17B002-B Equip. Class' 1 Equipment Description MCC2B Location: Bldg. AUXILIARY Floor El. 121 Room. Area 2209 Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage I. Is the anchorage configuration verification required (i.e., is the item one Y9 NO of the 50% of SWEL items requiring such verification)?

Reference U216585, Vl.

2. Is the anchorage free of bent. broken, missing or loose hardware? Y0 NE UJ N/AO Anchorage verfied SAT on 8/24/12.
3. Is the anchorage free of corrosion that is more than mild surface YIN NO UO N/AO oxidation?

Anchorage verfied SAT on 8/24/12.

4. Is the anchorage free of visible cracks in the concrete near the anchors? YN NE UO N/AO Anchorage verfied SAT on 8/24/12.
5. Is the anchorage configuration consistent with plant documentation? YN NEI UQ N/AD (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Anchorage verified to be consistentwith U216585, VI during walkdown performed 8/24/12.

6. Based on the above anchorage evaluations, is the anchorage free of YN NEI U-potentially adverse seismic conditions?

Anchorage verfied SAT on 8/24/12.

IEnter the equipment class name from Appendix B: Classes of Equipment.

Page 222 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 2 Of 9 Status: YZ N[] UM Seismic Walkdown Checklist (SWC)

Equipment ID No. Q2R17B002-B.. Equip. Class',.

Equipment Description MCC2B Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YN NO UQ N/Af
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YCR NE UD N/AD and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YS NE U- N/AD
10. Based on the above seismic interaction evaluations, is equipment free YED NO UO of potentially adverse seismic interaction effects?

Other Adverse Conditions II. Have you looked for and found no other seismic conditions that could YI NO UD adversely affect the safety functions of the equipment?

The cabinet internalswere inspected and no missing fasteners were observed. All internal connections and routed cables have been determined to be adequate and pose no adverseseismic condition.Minor housekeeping was identified under the MCC but this does not affect the seismic functions of the MCC. Additionally, two cabinets containedfailed reset switches which were hanging inside the cabinet panels door. It has been determined that these are soft targets and would not affect or strike components during a seismic event. The switches are marked with deficiency tags and have existing WOs to repairthem, therefore no additionalCRs are warranted.

Comments (Additional pages may be added as necessary)

SWC completed originally on 8/24/12 Finalwalkdown performed on 2/7/13 to inspect cabinet internals.No adverse seismic condtiions were noted.

Page 223 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 3 Of 9 Evaluated by: R Date: 2.17 t, -1

. 1

. IV, h~ l##Il 1'#J 1 (I!)

j 1 01 qw till Page 224 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 4 of 9 Page 225 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 5 of 9 Page 226 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 6 of 9 Page 227 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 7 of q Page 228 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 8 of Q Page 229 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 9 of 9 Page 230 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet I of 4 Status: YZ NF U[

Seismic Walkdown Checklist (SWC)

Equipment ID No. Q2R17B002-B Equip. Class' 1 Equipment Description MCC 28 Location: Bldg. AUXILIARY Floor El. 121' Room, Area 2209 Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage I. Is the anchorage configuration verification required (i.e., is the item one YZ NEI of the 50% of SWEL items requiring such verification)?

Anchorage verified SAT on 8/24/12

2. Is the anchorage free of bent, broken, missing or loose hardware? YN NDI UD N/AD Anchorage verified SAT on 8/24/12
3. Is the anchorage free of corrosion that is more than mild surface Y0 NCI UFD N/AD oxidation?

Anchorage verified SAT on 8/24/12

4. Is the anchorage free of visible cracks in the concrete near the anchors? Y0 NEI UD N/AD Anchorage verified SAT on 8/24/12
5. Is the anchorage configuration consistent with plant documentation? YZ NDI U-- N/AD (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Anchorage verified SAT on 8/24/12

6. Based on the above anchorage evaluations, is the anchorage free of YE N[:I UE-potentially adverse seismic conditions?

Anchorage verified SAT on 8/24/12 Enter the equipment class tame from Appendix B: Classes of Equipment.

Page 231 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 2 of 4 Status: YZ NE] U((

Seismic Walkdown Checklist (SWC)

Equipment ID No. Q2R17BO02-B Equip. Class' 1 Equipment Description MCC 2B Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YZI NE-I Ur N/A[D Reference walkdown performed 2/7/13
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NE UED N/AQ and masonry block walls not likely to collapse onto the equipment?

Reference walkdown performed 2/7/13

9. Do attached lines have adequate flexibility to avoid damage? Y[9 NEI UEI N/AEl Reference walkdown performed 2/7/13
10. Based on the above seismic interaction evaluations, is equipment free YS N[ U1-I of potentially adverse seismic interaction effects?

Reference walkdown performed 2/7/13 Other Adverse Conditions 1I. Have you looked for and found no other seismic conditions that could Y[K NED UQ adversely affect the safety functions of the equipment?

An external inspection of the cabinetconfirms that the IPEEE vulnerabilityhas been resolved. SEWS package dated 7/3/93 identified inadequateanchorageas a vulnerability.This has been resolved by attaching the two cabinets together, This configurationis judged to be an adequateresolution by the SWEs. A piece of angle has also been used to prevent the top portion of the cabinetfrom overtuming. The angles are sufficient to resist the horizontal loading and prevent loading the rigid conduitin the overhead.

Comments (Additional pages may be added as necessary)

SWC completed originally on 8/24/12.

Secondary Walkdown performed on 2/7/13 to inspect cabinetinternals.

Follow-up walkdown performed on 8/13/13 to confirm IPEEE vulnerability has been resolved.

Page 232 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 3 Of 4 Evaluated by: Brian Nelson - !L- ý- Date: 5 3 13 Taylor Youn ~blood C2.3113 Tavlor Younpblood

-7 Ntcrb-qA pad/zf Page 233 of 234

ATTACHMENT 7: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 4 of 4 Note: Angles ado horizontal loading F

1, Note: Multiple stiffeners added to top of MCC to Note: Multiple stiffeners added to top ol (; tO attach both sides of MCC attach both sides of MCC 1 ,.I Page 234 of 234

ATTACHMENT 8: AREA WALK-BY CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 ATTACHMENT 8 UNIT 2 - AREA WALK-BY CHECKLISTS (AWCs) (Version 2.0)

NO. SNCF164-RPT-02 A total of 5 Area Walk-bys have been completed.

The Checklists are provided within this Attachnment.

Page 1 of 24

ATTACHMENT 8: AREA WALK-BY CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 r- P6,V4C_ Sheet I of 9 Status: Y* NEI U-Area Walk-By Checklist (AWC)

Location: Bldg. CTMT Floor El. 175 Room, Area' PZR Cubicle Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.

I. Does anchorage of equipment in the area appear to be free of YM NrO UCI N/AC potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

All anchoredequipment has been determined to be sufficiently supported and anchoredsuch that no damage would occur during a seismic event.

2. Does anchorage of equipment in the area appear to be free of significant YN NO UC N/A0 degraded conditions?

Minor surface oxidation was noted on some of the supports located within the PressurizerCubicle. Determined to be only surface oxidation with no visible wastage and to have no impact on the associated equipment. This issue has been previously identified by the coating's program. (Ref. CR 623586)

3. Based on a visual inspection from the floor, do the cabletconduit YU NCi UCi N/A[-

raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?

A unistrut was found mounted to the interiorof the PressurizerCubicle wall with the lower of two supporting anchors (hilti bolts) relaxed. The unistrut was inspectedand was found to not be supporting any equipment and was not in contact with associatedequipment, cables, or conduits. A pull test was performed on the unistrut and it was determinedto be adequatelyanchored to prevent any potentially adverse seismic interactions with nearby equipment.

4. Does it appear that the area is free of potentially adverse seismic spatial Y9 N['I UC N/AC interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

The spatialinteraction is SAT.

' If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described.

This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.

Page 2 of 24

ATTACHMENT 8: AREA WALK-BY CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 2 of 9 Status: YIg NI ur--]

Area Walk-By Checklist (AWC)

Location: Bldg. CTMT Floor El. 175 Room. Area, PZR Cubicle

5. Does it appear that the area is free of potentially adverse seismic Y[D NEI U0 N/AD interactions that could cause flooding or spray in the area?

No seismic interactions were identified which would result in flooding or spraying of the area during a seismic event.

6. Does it appear that the area is free of potentially adverse seismic YID NEI UD N/AU interactions that could cause a fire in the area?

No fire hazards were identified in the area.

7. Does it appear that the area is free of potentially adverse seismic Y[@ NO UE N/AC interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

There is currently temporary Installationsand equipment in the area.

This equipment is associated with the current 2R22 Refueling Outage and will be removed priorto returning the Unit online. As such, no adverse affect to equipment is anticipated.

8. Have you looked for and found no other seismic conditions that could YZ NE UC adversely affect the safety functions of the equipment in the area?

No otherconditions were found which could affect the equipment located in the PressurizerCubicle.

Comments (Additional pages may be added as necessary)

Duringnormal operations,a missile shield (grating)is installed over the Pressurizercubicle which would prevent any overhead equipment external to the Pressurizerfrom coming in contact with the Structures, Systems, or Equipment.

Evaluated by: Ran Harlos Date: 17 111 Brian Nelson I 4".'s/'1 Page 3 of 24

ATTACHMENT 8: AREA WALK-BY CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 3 of 9 Page 4 of 24

ATTACHMENT 8: AREA WALK-BY CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 4 of 9 Page 5 of 24

ATTACHMENT 8: AREA WALK-BY CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 5 of 9 Page 6 of 24

ATTACHMENT 8: AREA WALK-BY CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 6 of 9 Page 7 of 24

ATTACHMENT 8: AREA WALK-BY CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 7 of 9 Page 8 of 24

ATTACHMENT 8: AREA WALK-BY CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 8 of 9 Page 9 of 24

ATTACHMENT 8: AREA WALK-BY CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 9 of 9 Page 10 of 24

ATTACHMENT 8: AREA WALK-BY CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 F2 - oo Sheet I of 3 Status: Y[ NE] U[]

Area Walk-By Checklist (AWC)

Location: Bldg. CTMT Floor El. 105' Room, Area' 105' CorridorOutside Bioshield Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of Y[ ND UD N/AD potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
2. Does anchorage of equipment in the area appear to be free of significant Y0 ND" Ur- N/AD degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit Y[9 ND UD- N/AD raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
4. Does it appear that the area is free of potentially adverse seismic spatial YZJ ND UD"] N/AD1 interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

'If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described.

This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.

Page 11 of 24

ATTACHMENT 8: AREA WALK-BY CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 2 of 3 Status: YN NEI UI--

Area Walk-By Checklist (AWC)

Location: Bldg. CTMT Floor El. 105' Room, Area' 105' CorridorOutside Bioshield

5. Does it appear that the area is free of potentially adverse seismic Y[ NEI UC N/AC interactions that could cause flooding or spray in the area?
6. Does it appear that the area is free of potentially adverse seismic YO NEI U- N/AC interactions that could cause a fire in the area?
7. Does it appear that the area is free of potentially adverse seismic YE NC Ur-l N/AC interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

See comment section below.

8. Have you looked for and found no other seismic conditions that could Y0 NC UC" adversely affect the safety functions of the equipment in the area?

Comments(Additional pages may be added as necessary)

During the Area Walk By, there were some houskeeping items such as bags on the floor, fall protection harnesses lying around,and tools lying around. Nearby workers in the area ensured that these houskeeping items would be cleanedprior to exiting the area. Additionally, before the end of each outage, a housekeeping walkdown is performed to ensure CTMT is clean priorto start-up.

  • Walkdown was performed on 4/18/2013. Form was retyped and resignedon date below for clarity.

Evaluated by: Taylor Youngblood ' 4 H . Date: 6 Z"13 Chelicia Hill / a-'-. .YI "7 I i/-ol 2

Page 12 of 24

ATTACHMENT 8: AREA WALK-BY CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 t 3 of 3 Page 13 of 24

ATTACHMENT 8: AREA WALK-BY CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 FZ-010 AW r &2EImoue7o_4- Sheet 1 of 3 Status: Y[R NR U--

Area Walk-By Checklist (AWC)

Location: Bldg. CTMT Floor El. 105' Room, Area' 105' CorridorOutside Bioshield Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YZ NO Ur N/AD potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
2. Does anchorage of equipment in the area appear to be free of significant Y10 Ni Ur N/AD degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit YZ NIl Ur] N/AD raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
4. Does it appear that the area is free of potentially adverse seismic spatial YN NEI U' N/AD interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

IIf the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described.

This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.

Page 14 of 24

ATTACHMENT 8: AREA WALK-BY CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 2 of 3 Status: YN NEI Ur"]

Area Walk-By Checklist (AWC)

Location: Bldg. CTMT Floor El. 105' Room, Area' 105' CorridorOutside Bloshield

5. Does it appear that the area is free of potentially adverse seismic YED NEI UD N/AD interactions that could cause flooding or spray in the area?
6. Does it appear that the area is free of potentially adverse seismic YN ND UD N/AD interactions that could cause a fire in the area?
7. Does it appear that the area is free of potentially adverse seismic YN ND Ur- N/AD interactions associated with housekeeping practices, storage of portable equipment. and temporary installations (e.g., scaffolding, lead shielding)?

See comment section below.

8. Have you looked for and found no other seismic conditions that could YZ ND UD adversely affect the safety functions of the equipment in the area?

There was some discussionbetween the SWEs about a light fixture directlyabove the valve, but the fixture appearedto be mounted properly. Additionally, with the overall size and materialmake-up of the valve operator,the light fixture poses minimal to no threat of the valve operation duringa seismic event.

Comments (Additional pages may be added as necessary)

During the Area Walk By, there were some houskeeping items such as bags on the floor, fall protection harnesses lying around,and tools lying around. Nearby workers in the area ensured that these houskeeping items would be cleanedprior to exiting the area. Additionally, before the end of each outage, a housekeeping walkdown is performed to ensure CTMT is clean priorto start-up.

  • Walkdown was performed on 4/18/2013. Form was retyped and resignedon date below for clarity.

Evaluated by: Taylor Youngblood OoAL 6 . - Date: P2 S /,3 Chelicia Hill h. 4 .- " 7/ 6

'7/ _1-Page 15 of 24

ATTACHMENT 8: AREA WALK-BY CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 3 of 3 Page 16 of 24

ATTACHMENT 8: AREA WALK-BY CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 F2 -o057 Sheet I of 4 Status: YE NF' UM Area Walk-By Checklist (AWC)

Location: Bldg. CTMT Floor El. 105' Room, Area' 105' CorridorOutside Bioshield Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.

I. Does anchorage of equipment in the area appear to be free of YI9 ND U[-- N/AO potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

2. Does anchorage of equipment in the area appear to be free of significant YZ N[ UQ N/AO degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit YO NEI UEI N/AO raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
4. Does it appear that the area is free of potentially adverse seismic spatial YZ ND U[-I N/AE interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

' If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described.

This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.

Page 17 of 24

ATTACHMENT 8: AREA WALK-BY CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 2 of 4 Status: YZ Nr'- Ur-Area Walk-By Checklist (AWC)

Location: Bldg. CTMT Floor El. 105' Room, Area' 105' CorridorOutside Bioshield

5. Does it appear that the area is free of potentially adverse seismic YZ Nil UD N/AO interactions that could cause flooding or spray in the area?
6. Does it appear that the area is free of potentially adverse seismic YZ NEI ULI N/AD interactions that could cause a fire in the area?
7. Does it appear that the area is free of potentially adverse seismic YZ Nil UD N/AO interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
8. Have you looked for and found no other seismic conditions that could Y[R NEI UD adversely affect the safety functions of the equipment in the area?

Temporary cables were in the vicinity of the valve, but posed no adverse seismic condition. The cables were ensured to be removed prior to the end of the outage. Additionally there were some minor housekeeping items that were to be cleanedby nearby workers.

Comments (Additional pages may be added as necessary)

  • Walkdown was performed on 4/18/2013. Form was retyped and resignedon date reflected below for clarity.

Evaluated by: Tavlo/oYoungblood Date:

Chelicia Hill / ".a'A "*&' 2 LJ.

Page 18 of 24

ATTACHMENT 8: AREA WALK-BY CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 3 of 4 Page 19 of 24

ATTACHMENT 8: AREA WALK-BY CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 4 of 4 Page 20 of 24

ATTACHMENT 8: AREA WALK-BY CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet I of 4 Status: Y[ NE] U--

Area Walk-By Checklist (AWC)

Location: Bldg. CTMT Floor El. 129' Room, Area1 Containment 129' HallwaV Near Seal Table Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of Y[ NO UO N/AQ potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
2. Does anchorage of equipment in the area appear to be free of significant YZ NOI UD N/AO degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit YI NO"I UD N/AD raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
4. Does it appear that the area is free of potentially adverse seismic spatial YC9 NO UO" N/AO interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

IIf the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described.

This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.

Page 21 of 24

ATTACHMENT 8: AREA WALK-BY CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 2 of 4 Status: YN NE] UE]

Area Walk-By Checklist (AWC)

Location: Bldg. CTMT Floor El. 129' Room, Area' Containment 129' Hallway Near Seal Table

5. Does it appear that the area is free of potentially adverse seismic YZ NEI ULJ N/A[l interactions that could cause flooding or spray in the area?
6. Does it appear that the area is free of potentially adverse seismic YZ NEI UE- N/Al interactions that could cause a fire in the area?
7. Does it appear that the area is free of potentially adverse seismic Y0 NE[ UCI N/AEl interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
8. Have you looked for and found no other seismic conditions that could Y[K NEI UE-adversely affect the safety functions of the equipment in the area?

There were portabletables set up for HP along with phones and phone cables. This equipment is common to be set up during an outage and removed prior to start-up, therefore no CR was warranted. No other seismic conditionsexist that could affect equipment in the area.

Comments (Additional pages may be added as necessary)

Page 22 of 24

ATTACHMENT 8: AREA WALK-BY CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 3 of 4 Evaluated by: Taylor Youngblood Date: 1/

Chelicia Hill 4 Page 23 of 24

ATTACHMENT 8: AREA WALK-BY CHECKLISTS NO. SNCF164-RPT-02, VERSION 2.0 Sheet 4 of 4 Page 24 of 24