Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML13268A449 | 26 September 2013 | Response to Request for Additional Information Regarding Core Operating Limits Report for Cycle 21 | Shutdown Margin |
ML13276A503 | 25 September 2013 | License Amendment Request (LAR) to Adopt National Fire Protection Association (NFPA) 805 Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants | Safe Shutdown Fire Protection Program |
ML13276A504 | 25 September 2013 | Transition Report, Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition. Part 1 of 2 | |
ML13276A505 | 25 September 2013 | Transition Report, Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition. Part 2 of 2 | Hot Short Safe Shutdown Boric Acid High winds Mission time Fire Barrier Internal Flooding Probabilistic Risk Assessment Multiple Spurious Operation B.5.b Earthquake Pressure Boundary Leakage Fire Protection Program Unidentified leakage Affidavit Manual Operator Action Operational leakage |
ML13269A077 | 23 September 2013 | Submittal of Technical Specification Bases Changes | Safe Shutdown Surveillance Frequency Control Program Fire Protection Program |
ML13263A373 | 18 September 2013 | Technical Specification Bases Changes | Safe Shutdown Anticipated operational occurrence Qualified Offsite Circuit Surveillance Frequency Control Program Offsite Circuit Overspeed trip |
ML13260A423 | 11 September 2013 | Written Examination Approval Letter 05000413-13-301 and 05000414-13-301 | |
ML13312A919 | 11 September 2013 | Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Re the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident - 1.5 Year Response for Central and Eastern | Safe Shutdown Earthquake Fukushima Dai-Ichi |
ML13252A007 | 4 September 2013 | Crystal, Unit 3, Shearon Harris, Unit 1, McGuire, Unit 1 & 2, Oconee, Units 1, 2 & 3 and H.B. Robinson - Response to NRC Regulatory Issue Summary 2013-06 Preparation and Scheduling of Operator Licensing Examinations | Generic Fundamentals Examination |
ML13246A168 | 3 September 2013 | Mid Cycle Assessment Letter | |
ML13246A103 | 29 August 2013 | Units 1 and 2 - Report Per 10 CFR 50.46, Changes to or Errors in an Evaluation Model | |
ML13234A503 | 28 August 2013 | Nuclear Regulatory Commission Audits of Licensee Responses to Mitigation Strategies Order EA-12-049 | FLEX |
ML13298A010 | 28 August 2013 | First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049) | Internal Flooding FLEX B.5.b Earthquake |
ML13242A009 | 26 August 2013 | Duke Energy - First Six-Month Status Reports in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) | Spent Fuel Pool Instrumentation |
ML13233A364 | 23 August 2013 | Establishment of Mitigation Strategies Directorate for Nuclear Regulatory Commission Review of Order EA-12-049 | Fukushima Dai-Ichi |
ML13246A087 | 23 August 2013 | Nuclear Nonconformance Event Number 49302 - 10CFR21 Notification | |
IR 05000413/2013405 | 22 August 2013 | IR 05000413-13-405, 05000414-13-405, on 03/29/2013, Catawba Nuclear Plant - NRC Temporary Instruction 2201/004, Inspection of Implementation of Interim Cyber Security Milestones 1-7 - OUO Removed | Enforcement Discretion Cyber Security Affidavit |
TAC:MF1777 | 20 August 2013 | ||
ML13226A154 | 20 August 2013 | Request for Additional Information Regarding Core Operating Limits Report for Cycle 21 | |
ML13225A557 | 12 August 2013 | Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit | |
ML13225A293 | 12 August 2013 | 7/23-24/2013, Summary of Meeting 2013 U.S. Nuclear Regulatory Commission (NRC) Initial Exam Writers' Workshop | |
ML13169A139 | 9 August 2013 | Issuance of Amendments Regarding Technical Specifications Changes for Nuclear Service Water System | Safe Shutdown Ultimate heat sink Tornado Missile Safe Shutdown Earthquake Probabilistic Risk Assessment Surveillance Frequency Control Program Large early release frequency Fuel cladding Fire Protection Program Fire Watch |
ML13219A004 | 6 August 2013 | NRR E-mail Capture - Acceptance Review: Catawba Units 1 and 2 - Relief Request 13-CN-003, Request for Alternative to the Requirement of IWB-2500 (MF1922/23) | |
TAC:MF1922 | 6 August 2013 | ||
ML13217A117 | 5 August 2013 | Notification of Inspection and Request for Information | Boric Acid Nondestructive Examination |
ML13161A286 | 2 August 2013 | Acknowledgement Letter for 60 Day Response to Issuance of Seismic Guidance Related to the NTTF Recommendation 2.1, Seismic Reevaluations | Probabilistic Risk Assessment Earthquake |
ML13206A427 | 1 August 2013 | Online Reference Portal for Nuclear Regulatory Commission Review of Fukushima Near Term Task Force Related Documents | |
ML13213A284 | 31 July 2013 | Closure Option 1 Response to In-Vessel Downstream Effects Request for Additional Information for Generic Safety Issue (GSI) 191, Assessment of Debris Accumulation on Pressurized-Water Reactor Sump Performance............... | Fuel cladding |
IR 05000413/2013003 | 26 July 2013 | IR 05000413-13-003, 05000414-13-003; 4/1/2013 - 6/30/2013; Catawba Nuclear Station, Units 1 and 2; Operability Determinations and Functionality Assessments | Safe Shutdown Fire Barrier Enforcement Discretion Probabilistic Risk Assessment Functionality Assessment Significance Determination Process Operability Determination |
ML13210A035 | 23 July 2013 | NRC Correspondence Distribution List Update | |
ML13206A384 | 23 July 2013 | Response to Request for Additional Information Regarding Overall Integrated Plan in Response to Order EA-12-051, Reliable Spent Fuel Pool Instrumentation (TAC Numbers MF1060 and MF1061) | Safe Shutdown Earthquake FLEX Spent Fuel Pool Instrumentation |
ML13168A076 | 16 July 2013 | Issuance of Amendments Regarding Changes to Technical Specification (TS) 3.6.14, Divider Barrier Integrity (TAC Nos. MF0620, MF0621, Mf 0626 and MF0627) | Safe Shutdown Surveillance Frequency Control Program Fire Protection Program |
ML13199A279 | 11 July 2013 | Report Pursuant to 10 CFR 50.46, Changes to or Errors in an Evaluation Model | |
ML13176A400 | 8 July 2013 | Proposed Relief Request 13-CN-001, Use of Alternate Depth Sizing Criteria | Incorporated by reference Stress corrosion cracking Eddy Current Testing Dissimilar Metal Weld |
TAC:MF1168 | 8 July 2013 |