Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
NRC-10-0317, R. E. Ginna, Environmental Assessment and Finding of No Significant Impact Regarding Upgrade to Selected Emergency Action Levels Based on Ne 99-01, Rev. 528 September 2010R. E. Ginna, Environmental Assessment and Finding of No Significant Impact Regarding Upgrade to Selected Emergency Action Levels Based on Ne 99-01, Rev. 5License Renewal
ML10193026428 September 2010R. E. Ginna Nuclear Power Plant-Environmental Assessment and Finding of No Significant ImpactLicense Renewal
ML10193028428 September 2010R. E. Ginna, Environmental Assessment and Finding of No Significant Impact Regarding Upgrade to Selected Emergency Action Levels Based on Ne 99-01, Rev. 5License Renewal
ML10277009227 September 2010Nine Mile Point Nuclear Station and R. E. Ginna Nuclear Power Plant, Notification Letter Designing Balance of Plant Systems within the Cyber Security Rule ScopeCyber Security
ML10273062322 September 2010R. E. Ginna - Transmittal of RCS Pressure and Temperature Limits Report (PTLR)Pressure and Temperature Limits Report
Power Uprate
ML10264006721 September 2010Requalification Program Inspection: R.E. Ginna Nuclear Power Plant
ML10267006616 September 2010General License 30-Day Cask Registration Notification
IR 05000244/20104048 September 2010IR 05000244-10-404, on 08/2 - 08/23/10, R.E. Ginna Nuclear Power Plant, Ontario, Ny (Transmittal Letter, Public Version)Affidavit
IR 05000244/20102012 September 2010IR 05000244-10-201 on 08/02/2010 - 08/05/2010 for R. E. Ginna Nuclear Power Plant, Target Set Inspection (Cover Letter)Affidavit
ML1024401991 September 2010Mid-Cycle Performance Review and Inspection Plan 2010 - R.E. Ginna Nuclear Power Plant
IR 05000244/201000731 August 2010IR 05000244-10-007 on 07/12/10 - 07/23/10 for R. E. Ginna Nuclear Power Plant, NRC Supplemental Inspection Report with Assessment Follow-up LetterCondition Adverse to Quality
Large early release frequency
IR 05000244/201030131 August 2010R. E. Ginna Nuclear Power Plant - NRC Examination Report 05000244-10-301
TAC:ME432816 August 2010
ML10217002716 August 2010(Ccnpp), Units 1 and, R.E. Ginna Nuclear Power Plant (Ginna), Nine Mile Point Nuclear Plant (Nmpns), Units 1 & 2-Acceptance of Requested Cyber Security Plan (Tac ME4328, ME4329, ME4330, ME4331, ME4332)Cyber Security
ML10228033916 August 2010Summary of Supplemental Inspection Exit and Regulatory Performance Meeting with Constellation Energy
ML10231061916 August 2010Transmittal of FOCI
ML10225004213 August 2010Exit and RPM Slides - 2010
ML10225008113 August 2010Public Meeting 2010 - Ceng Slides
Press Release-I-10-038, NRC Assigns New Senior Resident Inspector at R.E. Ginna Nuclear Plant13 August 2010Press Release-I-10-038: NRC Assigns New Senior Resident Inspector at R.E. Ginna Nuclear PlantNew Resident Inspector
TAC:ME512012 August 2010
ML1027100065 August 2010NRC Operator Licensing Initial Exam Results, R. E. Ginna Nuclear Power Plant, LLC (Cover Letter Publicly Available; Enclosures Withheld from Public)
Press Release-I-10-034, NRC to Provide Results of Supplemental Inspection Conducted at Ginna Nuclear Power Plant28 July 2010Press Release-I-10-034: NRC to Provide Results of Supplemental Inspection Conducted at Ginna Nuclear Power Plant
ML10208005528 July 2010Withdrawal of the Constellation Energy Nuclear Group Cyber Security Plan-Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2, R. E. Ginna Nuclear Power Plant, Nine Mile Point Nuclear Station, Units 1 and 2Cyber Security
ML10210019623 July 2010Response to RIS 2010-08, Preparation and Scheduling of Operator License ExaminationsGeneric Fundamentals Examination
ML10210019321 July 2010Correction to Annual Radioactive Effluent Release Report and Radiological Environmental Operating ReportAnnual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
ML10201041521 July 2010R. E. Ginna Public Meeting
IR 05000244/201000320 July 2010IR 05000244-10-003, on 04/01/2010-06/30/2010, R.E. Ginna Nuclear Power Plant, LLC (Ginna), Routine Integrated Inspection ReportOffsite Dose Calculation Manual
Fire Barrier
Enforcement Discretion
Temporary Modification
Functionality Assessment
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Operability Determination
Annual Radiological Effluent Release Report
Earthquake
Fire Protection Program
ML10252005416 July 2010Post Exam Comments and Technical References (Folder 1)Job Performance Measure
ML10204047316 July 2010R. E. Ginna - Request for Approval of the Constellation Energy Nuclear Group Cyber Security PlanSafe Shutdown
Cyber Security
Incorporated by reference
Fire Protection Program
IR 05000244/20100069 July 2010IR 05000244-10-006; 05/24/10 - 06/11/2010; R.E. Ginna Nuclear Power Plant; Biennial Baseline Inspection of the Identification and Resolution of ProblemsHigh Radiation Area
Condition Adverse to Quality
Significance Determination Process
Operability Determination
ML1018904161 July 2010Submittal of Securities and Exchange Commission Schedule