ML102280339

From kanterella
Jump to navigation Jump to search
Summary of Supplemental Inspection Exit and Regulatory Performance Meeting with Constellation Energy
ML102280339
Person / Time
Site: Ginna Constellation icon.png
Issue date: 08/16/2010
From: Glenn Dentel
Reactor Projects Branch 1
To:
References
Download: ML102280339 (3)


Text

MEETING SUMMMARY August 16,2010 LICENSEE: CONSTELLATION ENERGY FACILITY: R. E. GINNA NUCLEAR POWER PLANT

SUBJECT:

SUMMARY

OF THE AUGUST 2010 SUPPLEMENTAL INSPECTION EXIT AND REGULATORY PERFORMANCE MEETING WITH CONSTELLATION ENERGY On August 4, 2010, at 5:00 p.m., the NRC conducted a Supplemental Inspection Exit and Regulatory Performance Meeting at the Ontario Town Hall in Ontario, NY. The NRC held the meeting with Constellation Energy management to prE!Sent the results of the 95002 supplemental inspection, and discuss with Constellation issues associated with two "white" findings and one "white" Performance Indicator for the R. E. Ginna Nuclear Power Plant regarding the turbine-driven auxiliary feedwater pump failures that occurred between December 2008 and July 2009.

The NRC presented and discussed the results of the 95002 supplemental inspection, which was conducted July 12 through July 23,2010. The NRC also presented the results of NRC's performance assessment for Ginna. As part of this regulatory performance meeting, Constellation presented its perspective regarding the plant's performance.

The public was invited to observe this meeting. At the end of the meeting between the NRC and Constellation, public attendees were offered the opportunity to communicate with the NRC regarding Constellation's performance at Ginna and the role of the agency in ensuring safe plant operations.

A notice of the meeting was issued on July 21,2010, and was posted on the NRC's public web page (ADAMS Accession No. ML102010415). The NRC slides for this meeting (ML102250042) and Constellation's slides for this meeting (ML 102250(81), can also be found on the NRC's public web page. ADAMS is accessible from the NRC Web site at www.nrc.gov/reading rm/adams.html.

The NRC's inspection report will be issued within 45 days of the exit meeting.

Sincerely, IRA!

Glenn T. Dentel, Chief Projects Branch 1 Division of Reactor Projects

Attachment:

List of Attendees

MEETING SUMMMARY August 16, 2010 LICENSEE: CONSTELLATION ENERGY FACILITY: R. E. GINNA NUCLEAR POWER PLANT

SUBJECT:

SUMMARY

OF THE AUGUST 2010 SUPPLEMENTAL INSPECTION EXIT AND REGULATORY PERFORMANCE MEETING WITH CONSTELLATION ENERGY On August 4, 2010, at 5:00 p.m., the NRC conducted a Supplemental Inspection Exit and Regulatory Performance Meeting at the Ontario Town Hall in Ontario, NY. The NRC held the meeting with Constellation Energy management to present the results of the 95002 supplemental inspection, and discuss with Constellation issues associated with two "white" findings and one "white" Performance Indicator for the R. E.

Ginna Nuclear Power Plant regarding the turbine-driven auxiliary feedwater pump failures that occurred between December 2008 and July 2009.

The NRC presented and discussed the results of the 95002 supplemental inspection, which was conducted July 12 through July 23,2010. The NRC also presented the results of NRC's performance assessment for Ginna. As part of this regulatory performance meeting, Constellation presented its perspective regarding the plant's performance.

The public was invited to observe this meeting. At the end of the meeting between the NRC and Constellation, public attendees were offered the opportunity to communicate with the NRC regarding Constellation's performance at Ginna and the role of the agency in ensuring safe plant operations.

A notice of the meeting was issued on July 21,2010, and was posted on the NRC's public web page (ADAMS Accession No. ML102010415). The NRC slides for this meeting (ML102250042) and Constellation's slides for this meeting (ML102250081), can also be found on the NRC's public web page. ADAMS is accessible from the NRC Web site at www.nrc.gov/reading-rm/adams.html.

The NRC's inspection report will be issued within 45 days of the exit meeting.

Sincerely, IRA!

Glenn T. Dentel, Chief Projects Branch 1 Division of Reactor Projects SUNSI Review Complete: _--",G-.T=D_ _ _ (Reviewer'S Initials)

DOCUMENT NAME: G:\DRP\BRANCH1\Ginna 95002\Exit and RegPerf Mtg Preps\Ginna 95002 Exit Meeting Summary.doc After declaring this document "An Official Agency Record" it will be released to the Public. M102280339 To receive a copy of this document, indicate in the box: "C" =Copy without attachment/enclosure "E" =Copy with

=

attachment/enclosure "N" No copy OFFICE NAME RIIDRP NPerry/np

\Ihp RIIDRP GDentellgd I I DATE 08/16/10 08/16/10 I II

SUPPLEMENTAL INSPECTION EXIT AND REGULATORY PERFORMANCE MEETING ATTENDEE LIST r-----.------,..-----------------.,

h:- Attendee Organization LQ§!ve Joselin CE_N___ G _ _ _- 1 l_~jchael Annett ________-+--:C:-::E~:_:_N-G::-------__;

~~:~:~_______ H~ _______ _

Maria Hudson CENG Spencer Preston CENG .,.---------1 Larry Taylor I--=C:-::E:-N=-:--:G~_ _ _ ---l Tom Harding I CEr-.J~ -----1 Dan Bierbrauer ---,- CENG ~

""Tom Paglia I CENG _____~______i Mark Geckle I CENG ---J D.P. Dunn Maria Korsnick

. CENG I CENG i

Cindy Swift  ! Member of the Public I Attachment