Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML092440176 | 29 September 2009 | Cover Letter Transmitting the Draft Safety Evaluation of Boiling Water Reactors Owners' Group Topical Report NEDC-33347, Revision 0, Containment Overpressure Credit for Net Positive Suction Head (Npsh). | |
TAC:MD8146 | 29 September 2009 | ||
ML092650078 | 22 September 2009 | 2009-10 - Examination Approval Letter | |
ML092650275 | 22 September 2009 | Acceptance Review Email, License Amendment Request to Revise Technical Specifications Related to Diesel Generator Fuel Oil Storage and Testing | |
GO2-09-134, Inservice Inspection Summary Report for Refueling Outage R-19 | 22 September 2009 | Inservice Inspection Summary Report for Refueling Outage R-19 | Hydrostatic Anchor Darling VT-2 Liquid penetrant Dissimilar Metal Weld |
GO2-09-132, Supplemental (Post-Outage) Response to NRC Generic Letter 2008-01 | 21 September 2009 | Supplemental (Post-Outage) Response to NRC Generic Letter 2008-01 | |
IR 05000397/2009009 | 15 September 2009 | IR 05000397-09-009 on 07/20/09 - 09/01/09 for Columbia Generating Station | High Radiation Area Offsite Dose Calculation Manual Significance Determination Process Annual Radiological Effluent Release Report |
ML092400097 | 1 September 2009 | 9/1/2009 Columbia 2009 Midcycle Performance Review and Inspection Plan | |
PNO-IV-09-004, A, Entergy Northwest, Columbia Generating Station Startup Following an Automatic Reactor Scram Due to a Turbine Trip and Declaration of an Unusual Event Due to Possible Toxic Gas (Update), 08/31/2009 | 31 August 2009 | PNO-IV-09-004A, Entergy Northwest, Columbia Generating Station Startup Following an Automatic Reactor Scram Due to a Turbine Trip and Declaration of an Unusual Event Due to Possible Toxic Gas (Update), 08/31/2009 | |
ML102440384 | 27 August 2009 | Drawing 7, M515-3, Rev. 4, Flow Diagram Fire Protection System CO2 Distribution | |
ML102440385 | 27 August 2009 | Drawing 8, M515-3, Rev. 4, Flow Diagram Fire Protection System CO2 Distribution | |
GO2-09-119, Affirmation of Implementation of 10 CFR Part 26 Subpart I Requirements | 27 August 2009 | Affirmation of Implementation of 10 CFR Part 26 Subpart I Requirements | |
GO2-09-115, Voluntary Response to Regulatory Issue Summary 2009-11 | 19 August 2009 | Voluntary Response to Regulatory Issue Summary 2009-11 | Generic Fundamentals Examination |
ML091700146 | 18 August 2009 | License Amendment No. 214, Revise Technical Specification 3.3.6.1, Primary Containment Isolation Instrumentation | Reactor Vessel Water Level Anticipated operational occurrence |
TAC:ME2121 | 17 August 2009 | ||
GO2-09-114, License Amendment Request for Changes to Technical Specifications Relating to Diesel Generator Fuel Oil Storage and Testing | 17 August 2009 | License Amendment Request for Changes to Technical Specifications Relating to Diesel Generator Fuel Oil Storage and Testing | Safe Shutdown Mission time Anticipated operational occurrence Incorporated by reference |
Press Release-IV-09-028, NRC Conducting Special Inspection at Columbia Generating Station | 17 August 2009 | Press Release-IV-09-028: NRC Conducting Special Inspection at Columbia Generating Station | |
ML102740527 | 12 August 2009 | Memorandum of Closure, Case No. 4-2009-052F | |
IR 05000397/2009003 | 10 August 2009 | IR 05000397-09-003 on 03/29/2009 - 06/27/2009; Columbia Generating Station; Integrated Resident and Regional Report; Access Control to Radiologically Significant Areas; Identification and Resolution of Problems | Boric Acid High Radiation Area Water Inventory Control Nondestructive Examination Temporary Modification Significance Determination Process Fire Protection Program Scaffolding Substantial potential for an overexposure Coast down Operability Assessment Overexposure |
GO2-09-110, Transmittal of 60-Day Follow-up Report LER 09-S01-00 | 10 August 2009 | Transmittal of 60-Day Follow-up Report LER 09-S01-00 | |
ML092170791 | 5 August 2009 | PNO-IV-09-004, Columbia Generating Station Unusual Event and Automatic Reactor Scram Due to Fire Resulting in Possible Toxic Gas | |
ML091410315 | 28 July 2009 | Issuance of Amendment No. 213, Modify Technical Specifications to Adopt TSTF-511, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26 | |
GO2-09-103, Report of Changes and Errors Pursuant to 10 CFR 50.46 | 22 July 2009 | Report of Changes and Errors Pursuant to 10 CFR 50.46 | |
GO2-09-100, Energy Northwest (Columbia Generating Station) Computer Access Agreement, Letter Dated July 16, 2009 from S. Gambhir to Elmo E. Collins | 16 July 2009 | Energy Northwest (Columbia Generating Station) Computer Access Agreement, Letter Dated July 16, 2009 from S. Gambhir to Elmo E. Collins | |
IR 05000397/2009402 | 13 July 2009 | IR 05000397-09-402, on 06/12/2009, Columbia Generating Station-NRC Security Inspection | Significance Determination Process Affidavit |
ML091820702 | 1 July 2009 | IR 05000397-09-006, on 07/01/2009, Columbia Generating Station - Notification of NRC Triennial Fire Protection Baseline Inspection | Safe Shutdown Emergency Lighting Fire Protection Program |