|
---|
Category:Letter
MONTHYEARGO2-24-004, License Amendment Request to Revise Emergency Plan2024-01-30030 January 2024 License Amendment Request to Revise Emergency Plan IR 05000397/20230042024-01-29029 January 2024 Integrated Inspection and Independent Spent Fuel Storage Installation Report 05000397/2023004 and 07200035/2023001 GO2-24-003, Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing2024-01-29029 January 2024 Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing ML24011A1522024-01-10010 January 2024 March 2024 Emergency Preparedness Exercise Inspection-Request for Information GO2-24-005, Docket No. 50-397 Supplement to Reply to a Notice of Violation; EA-21-1702024-01-0808 January 2024 Docket No. 50-397 Supplement to Reply to a Notice of Violation; EA-21-170 GO2-23-136, Guarantee of Payment of Deferred Premium2023-12-20020 December 2023 Guarantee of Payment of Deferred Premium GO2-23-135, Notice of Readiness for Supplemental Inspection2023-12-14014 December 2023 Notice of Readiness for Supplemental Inspection GO2-23-130, Reply to a Notice of Violation; EA-23-0542023-12-14014 December 2023 Reply to a Notice of Violation; EA-23-054 GO2-23-105, Licensing Basis Document Update and Biennial Commitment Change Report2023-12-12012 December 2023 Licensing Basis Document Update and Biennial Commitment Change Report ML23288A0002023-12-0707 December 2023 Issuance of Amendment No. 272 to Adopt TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position GO2-23-107, Application to Revise Technical Specifications to Adopt TSTS-584, Eliminate Automatic RWCU System Isolation on SLC Initiation2023-12-0505 December 2023 Application to Revise Technical Specifications to Adopt TSTS-584, Eliminate Automatic RWCU System Isolation on SLC Initiation GO2-23-126, Docket No. 50-397 Voluntary Response to Regulatory Issue Summary 2023-012023-11-28028 November 2023 Docket No. 50-397 Voluntary Response to Regulatory Issue Summary 2023-01 GO2-23-121, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-27027 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000397/20230122023-11-20020 November 2023 Commercial Grade Dedication Inspection Report 05000397/2023012 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000397/20230102023-11-0909 November 2023 Biennial Problem Identification and Resolution Inspection Report 05000397/2023010 IR 05000397/20230932023-11-0101 November 2023 Final Significance Determination of a White Finding, Notice of Violation and Follow-Up Assessment Letter; NRC Inspection Report 05000397/2023093 ML23299A2072023-10-26026 October 2023 Biennial Requalification Inspection Request for Information IR 05000397/20230032023-10-25025 October 2023 Integrated Inspection Report 05000397/2023003 IR 05000397/20230112023-10-0404 October 2023 License Renewal Phase 2 Report 05000397/2023011 IR 05000397/20234012023-09-11011 September 2023 Security Baseline Inspection Report 05000397/2023401 GO2-23-097, In-Service Inspection Summary Report for the Twenty-Sixth Refueling Outage (R26)2023-09-0606 September 2023 In-Service Inspection Summary Report for the Twenty-Sixth Refueling Outage (R26) ML24032A2182023-09-0101 September 2023 Information Request, Security IR 2024401 GO2-23-100, Technical Specification Section 5.6.4 Post Accident Monitoring Instrumentation 14-Day Report for Inoperable Suppression Pool Level Indication2023-08-31031 August 2023 Technical Specification Section 5.6.4 Post Accident Monitoring Instrumentation 14-Day Report for Inoperable Suppression Pool Level Indication GO2-23-056, Application to Revise Technical Specifications to Adopt TSTF-230, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling2023-08-29029 August 2023 Application to Revise Technical Specifications to Adopt TSTF-230, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling IR 05000397/20230052023-08-22022 August 2023 Updated Inspection Plan for Columbia Generating Station (Report 05000397/2023005) - Mid Year Letter IR 05000397/20230022023-08-0101 August 2023 Integrated Inspection Report 05000397/2023002 GO2-23-093, Supplement to Reply to a Notice of Violation: EA-21-1702023-07-27027 July 2023 Supplement to Reply to a Notice of Violation: EA-21-170 ML23206A2442023-07-25025 July 2023 Energy Northwest Columbia Generating Station, Response to Apparent Violation in NRC Inspection Report 05000397/2023092; EA-23-054 GO2-23-068, Notification of Completion of Commitments Required Prior to Entry Into the Period of Extended Operation2023-07-19019 July 2023 Notification of Completion of Commitments Required Prior to Entry Into the Period of Extended Operation GO2-23-090, Reply to a Notice of Violation2023-07-12012 July 2023 Reply to a Notice of Violation ML23143A1202023-06-27027 June 2023 Request Number 4ISI-11 to the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Regarding Alternate Examination of Reactor Vessel Welds GO2-23-073, Notification of NPDES Permit Issuance2023-06-26026 June 2023 Notification of NPDES Permit Issuance ML23163A2502023-06-12012 June 2023 Summary of Changes and Analysis for Revision 41 of Plant Procedures Manual 13.8.1 Emergency Dose Projection System Operations GO2-23-072, Cycle 27 Core Operating Limits Report2023-06-0505 June 2023 Cycle 27 Core Operating Limits Report ML23157A2702023-06-0101 June 2023 4-2022-011 -022 Letter - OI Closure to Licensee IR 05000397/20230922023-06-0101 June 2023 NRC Inspection Report 05000397/2023092 and Preliminary White Finding IR 05000397/20230902023-06-0101 June 2023 Final Significance Determination of a White Finding, Notice of Violation and Follow-Up Assessment Letter; NRC Inspection Report 05000397/2023090 GO2-23-055, Independent Spent Fuel Storage Installation, 2022 Annual Radiological Environmental Operating Report2023-05-15015 May 2023 Independent Spent Fuel Storage Installation, 2022 Annual Radiological Environmental Operating Report IR 05000397/20230012023-05-0505 May 2023 Integrated Inspection Report 05000397/2023001 - April 26, 2023 GO2-23-006, License Amendment Request to Clean-Up Operating License and Appendix a Technical Specifications2023-05-0101 May 2023 License Amendment Request to Clean-Up Operating License and Appendix a Technical Specifications IR 05000397/20233012023-05-0101 May 2023 NRC Examination Report 05000397/2023301 GO2-23-053, 2022 Annual Environmental Operating Report2023-04-26026 April 2023 2022 Annual Environmental Operating Report GO2-23-057, 2022 Annual Radioactive Effluent Release Report2023-04-25025 April 2023 2022 Annual Radioactive Effluent Release Report ML23110A2642023-04-20020 April 2023 Request for Information License Renewal Phase 2 Inspection GO2-23-012, Application to Revise Technical Specifications to Adopt Tstf-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2023-03-27027 March 2023 Application to Revise Technical Specifications to Adopt Tstf-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position GO2-23-041, Generation Station - Level of Financial Protection - Annual Reporting Requirement2023-03-15015 March 2023 Generation Station - Level of Financial Protection - Annual Reporting Requirement GO2-23-038, Plant Decommissioning Fund Status Report2023-03-15015 March 2023 Plant Decommissioning Fund Status Report ML23013A0812023-03-15015 March 2023 Issuance of Amendment No. 270 Revision to Technical Specifications to Adopt TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times-RITSTF Initiative 4B GO2-23-034, Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.462023-03-13013 March 2023 Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.46 2024-01-08
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML23288A0002023-12-0707 December 2023 Issuance of Amendment No. 272 to Adopt TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML23083B4012023-04-27027 April 2023 Issuance of Amendment No. 271 to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML23013A0812023-03-15015 March 2023 Issuance of Amendment No. 270 Revision to Technical Specifications to Adopt TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times-RITSTF Initiative 4B ML22340A6892022-12-20020 December 2022 Regulatory Audit Summary in Support of Review for LAR to Revise Technical Specifications to Adopt TSTF-505, Rev. 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B ML22308A0962022-12-15015 December 2022 Issuance of Amendment No. 269 License Amendment to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML22263A4452022-11-23023 November 2022 Issuance of Amendment No. 268 to Revise Technical Specification 3.4.11 RCS Pressure and Temperature (P/T) Limits ML22098A0642022-05-0909 May 2022 Issuance of Amendment No. 267 to Adopt Technical Specifications Task Force (TSTF) 546, Revision 0, Revise APRM Channel Adjustment Surveillance Requirement ML21293A1642022-01-13013 January 2022 Issuance of Amendment No. 266 License Amendment Request to Remove License Condition 2.C.(34) and Revise License Condition 2.C.(35) ML21273A1672021-11-22022 November 2021 Issuance of Amendment No. 265 Adoption of TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML21053A3162021-03-0303 March 2021 Issuance of Amendment No. 264 to Revise Technical Specification to Adopt Traveler TSTF-582, Revision 0, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements ML21005A1782021-01-25025 January 2021 Issuance of Amendment No. 263 to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems Using the Consolidated Line Item Improvement Process ML20302A0262020-12-15015 December 2020 Issuance of Amendment No. 262 to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR ML20242A0022020-09-0404 September 2020 Issuance of Amendment No. 261 Revise Technical Specification 3.8.7, Distribution Systems - Operating (Exigent Circumstances) ML20135H0842020-06-29029 June 2020 Issuance of Amendment No. 260 Revise Technical Specifications to Adopt TSTF-563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML20136A3472020-06-22022 June 2020 Issuance of Amendment No. 259 Revise Technical Specifications Per TSTF-529, Revision 4, Clarify Use and Application Rules ML20125A0802020-05-12012 May 2020 Issuance of Amendment No. 258 Changes to Technical Specification Limiting Conditions for Operation 3.8.4 and 3.8.7 (Exigent Circumstances) ML20113E9842020-05-0404 May 2020 Issuance of Amendment No. 257 to Extend Implementation Date for Amendment No. 255 Control Room Air Conditioning System (Exigent Circumstances) ML19234A0162019-08-26026 August 2019 Issuance of Amendment No. 254 Change to Technical Specification 3.8.7, Distribution Systems - Operating (Exigent Circumstances) ML19063A5792019-06-20020 June 2019 Issuance of Amendment No. 253 Renewed Facility Operating License and Technical Specification Clean-Up ML18317A0052018-11-27027 November 2018 Correction to Safety Evaluation Pages 5 and 24 for Amendment No. 199 Dated November 27, 2006 Related to Alternative Source Term ML18283A1252018-11-0808 November 2018 Issuance of Amendment No. 252 Update Appendix B to Renewed Facility Operating License to Incorporate the 2017 Biological Opinion ML18255A3502018-10-30030 October 2018 Issuance of Amendment No. 251 Revision to the Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control ML18100A1992018-05-0202 May 2018 Issuance of Amendment No. 249 Change to Technical Specification 3.5.1 ECCS - Operating (CAC No. MG0015; EPID L-2017-LLA-0277) ML17290A1272017-10-30030 October 2017 Columbia Generating Station - Issuance of Amendment No. 245 Re: Request for a One-Time Extension of the Residual Heat Removal Train A Completion Time (CAC No. MF8794; EPID L-2016-LLA-0016) ML17188A2302017-08-28028 August 2017 Issuance of Amendment No. 244 Emergency Action Level Scheme Change to Nuclear Energy Institute 99-01, Revision 6 ML17187A2572017-07-24024 July 2017 Columbia Generating Station - Issuance of Amendment No. 243 Re: Adoption of Technical Specifications Task Force Traveler TSTF 545, Revision 3 (CAC No. MF8148) ML0531303192017-07-0505 July 2017 Current Facility Operating License NPF-21, Technical Specifications, Revised 11/01/2017 ML17131A0712017-06-27027 June 2017 Columbia Generating Station - Issuance of Amendment No. 242 Re: Reduction of Reactor Steam Dome Pressure Specified in the Technical Specification 2.1.1, "Reactor Core SLs (Safety Limits)" (CAC No. MF8116) ML17095A1172017-05-11011 May 2017 Columbia Generating Station - Issuance Of Amendment No. 241 Re: Measurement Uncertainty Recapture (CAC No. MF8060) ML17052A1252017-03-0909 March 2017 Issuance of Amendment No. 240 Request to Modify Technical Specification Surveillance Requirement 3.4.3.1 and 3.4.4.1 Safety/Relief Valve Setpoint Lower Tolerance ML16357A6462017-01-31031 January 2017 Issuance of Amendment No. 239, Adopt Technical Specification Task Force (TSTF)-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month ML16253A0252016-11-0303 November 2016 Issuance of Amendment No. 238, Adopt Technical Specification Task Force Traveler TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b ML16020A0312016-02-16016 February 2016 Issuance of Amendment No. 237, Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability, Using Consolidated Line Item Improvement Process ML15216A2662016-02-0303 February 2016 Issuance of Amendment No. 236, Adoption of Technical Specification Task Force Traveler TSTF-423, Revision 1, Technical Specifications End States, as Part of Consolidated Line Item Improvement Process ML15154A8002015-06-11011 June 2015 Issuance of Amendment No. 235, Extension of Implementation Period for Amendment 232 Changing Technical Specification Table 3.3.1.1-1, Function 7, Scram Discharge Volume Water Level - High (Exigent Circumstances) ML15098A2542015-05-11011 May 2015 Issuance of Amendment No. 234, Request to Revise Technical Specification 2.1.1.2 to Change Safety Limit Minimum Critical Power Ratio Values ML15076A1222015-04-15015 April 2015 Issuance of Amendment No. 233, Request to Revise Technical Specification Surveillance Requirement 3.7.1.1 Related to the Ultimate Heat Sink ML15042A4642015-03-27027 March 2015 Issuance of Amendment No. 231, Request to Revise License Condition Related to Approval of Revised Cyber Security Plan Implementation Schedule ML15063A0102015-03-27027 March 2015 Issuance of Amendment No. 232, Request to Revise Technical Specification Table 3.3.1.1-1 Function 7, Scram Discharge Volume Water Level - High ML15030A5012015-02-0101 February 2015 Issuance of Amendment No. 230, Revise Technical Specifications for One-Time Extension of Completion Time Required Actions Related to Residual Heat Removal System B Inoperability (Emergency Circumstances) ML14335A1892015-01-0707 January 2015 Redacted, Issuance of Amendment No. 229, Revise Emergency Core Cooling Systems Surveillance Requirements for Low Pressure Core Spray and Low Pressure Coolant Injection Pump Flows ML14290A3602014-11-12012 November 2014 Issuance of Amendment No. 228, Request to Adopt Technical Specification Task Force (TSTF)-535, Revision 0, Revise Shutdown Margin Definition to Address Advanced Fuel Designs ML14010A0302014-02-11011 February 2014 Issuance of Amendment No. 227, Request to Adopt Technical Specification Task Force (TSTF)-477, Revision 3, Adding an Action Statement for Two Inoperable Control Room Air Conditioning Subsystem ML13317B6232014-01-31031 January 2014 Redacted - Issuance of Amendment No. 226, Technical Specification Changes to Support Installation of GE Hitachi Power Range Neutron Monitoring System; Implementation of Arts/Mellla ML13030A4572013-03-0101 March 2013 Correction to Amendment Letter and Safety Evaluation Pages for Amendment No. 225, Administrative and Editorial Changes to Technical Specifications Related to Change in Software and to Adopt TSTF-GG-05-01 Revision 2 Writer'S Guide ML12269A2542013-01-29029 January 2013 Issuance of Amendment No. 225, Administrative and Editorial Changes to Technical Specifications Related to Change in Software and to Adopt TSTF-GG-05-01 Revision 2 Writer'S Guide ML12089A0432012-05-22022 May 2012 Issuance of Renewed Facility Operating License No. NPF-21 for Columbia Generating Station. Columbia Lr Ltr to Applicant ML12089A0902012-05-22022 May 2012 Issuance of Renewed Facility Operating License No. NPF-21 for Columbia Generating Station Renewed License ML1208102352012-04-23023 April 2012 Issuance of Amendment No. 224, Adoption of Technical Specification Task Force (TSTF)-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation ML1208000782012-03-30030 March 2012 Issuance of Amendment No. 223, Administrative Changes to Facility Operating License to Modify Existing License Conditions or Delete Obsolete License Conditions 2023-04-27
[Table view] Category:Safety Evaluation
MONTHYEARML23288A0002023-12-0707 December 2023 Issuance of Amendment No. 272 to Adopt TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML23143A1202023-06-27027 June 2023 Request Number 4ISI-11 to the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Regarding Alternate Examination of Reactor Vessel Welds ML23083B4012023-04-27027 April 2023 Issuance of Amendment No. 271 to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML23013A0812023-03-15015 March 2023 Issuance of Amendment No. 270 Revision to Technical Specifications to Adopt TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times-RITSTF Initiative 4B ML22308A0962022-12-15015 December 2022 Issuance of Amendment No. 269 License Amendment to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML22263A4452022-11-23023 November 2022 Issuance of Amendment No. 268 to Revise Technical Specification 3.4.11 RCS Pressure and Temperature (P/T) Limits ML22109A0922022-05-18018 May 2022 Correction Letter - Approval for Alternate Disposal Procedures for the Continued Onsite Disposal of Cooling Tower and Spray Pond Sludge in the Existing Sediment Disposal Area ML22098A0642022-05-0909 May 2022 Issuance of Amendment No. 267 to Adopt Technical Specifications Task Force (TSTF) 546, Revision 0, Revise APRM Channel Adjustment Surveillance Requirement ML22004A1852022-03-11011 March 2022 Approval for Alternate Disposal Procedures for the Continued Onsite Disposal of Cooling Tower and Spray Pond Sludge in the Existing Sediment Disposal Area ML21293A1642022-01-13013 January 2022 Issuance of Amendment No. 266 License Amendment Request to Remove License Condition 2.C.(34) and Revise License Condition 2.C.(35) ML21273A1672021-11-22022 November 2021 Issuance of Amendment No. 265 Adoption of TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML21081A1502021-03-25025 March 2021 Approval for Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML21053A3162021-03-0303 March 2021 Issuance of Amendment No. 264 to Revise Technical Specification to Adopt Traveler TSTF-582, Revision 0, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements ML21005A1782021-01-25025 January 2021 Issuance of Amendment No. 263 to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems Using the Consolidated Line Item Improvement Process ML20302A0262020-12-15015 December 2020 Issuance of Amendment No. 262 to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR ML20282A7322020-10-27027 October 2020 Proposed Alternative Request No. 4ISI-08 Applicable to the Fourth Inservice Inspection Interval ML20242A0022020-09-0404 September 2020 Issuance of Amendment No. 261 Revise Technical Specification 3.8.7, Distribution Systems - Operating (Exigent Circumstances) ML20203K8762020-07-22022 July 2020 Correction to Reduction in Commitment to the Operational Quality Assurance Program Description (EPID L-2020-LLQ-0003 (COVID-19)) ML20181A4452020-07-0707 July 2020 Reduction in Commitment to the Operational Quality Assurance Program Description (EPID L-2020-LLQ-0003)(Covid-19) ML20135H0842020-06-29029 June 2020 Issuance of Amendment No. 260 Revise Technical Specifications to Adopt TSTF-563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML20136A3472020-06-22022 June 2020 Issuance of Amendment No. 259 Revise Technical Specifications Per TSTF-529, Revision 4, Clarify Use and Application Rules ML20125A0802020-05-12012 May 2020 Issuance of Amendment No. 258 Changes to Technical Specification Limiting Conditions for Operation 3.8.4 and 3.8.7 (Exigent Circumstances) ML20113E9842020-05-0404 May 2020 Issuance of Amendment No. 257 to Extend Implementation Date for Amendment No. 255 Control Room Air Conditioning System (Exigent Circumstances) ML19350B5792020-01-0202 January 2020 Generation Station - Safety Evaluation Regarding Implementation of Hardened Containment Vents Capable of Operation Under Severe Accident Conditions Related to Order EA-13-109 (CAC No. MF4383; EPID L-2014-JLD-0045) ML19063A5792019-06-20020 June 2019 Issuance of Amendment No. 253 Renewed Facility Operating License and Technical Specification Clean-Up ML18317A0052018-11-27027 November 2018 Correction to Safety Evaluation Pages 5 and 24 for Amendment No. 199 Dated November 27, 2006 Related to Alternative Source Term ML18283A1252018-11-0808 November 2018 Issuance of Amendment No. 252 Update Appendix B to Renewed Facility Operating License to Incorporate the 2017 Biological Opinion ML18255A3502018-10-30030 October 2018 Issuance of Amendment No. 251 Revision to the Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control ML18100A1992018-05-0202 May 2018 Issuance of Amendment No. 249 Change to Technical Specification 3.5.1 ECCS - Operating (CAC No. MG0015; EPID L-2017-LLA-0277) ML17333A8882018-02-22022 February 2018 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML17318A0422017-11-20020 November 2017 Relief Request No. 3ISI-17 from the Requirements of the ASME Code, Section XI for the Third 10-Year Inservice Inspection Interval (CAC No. MF8923; EPID L-2016 LLR-0005) ML17290A1272017-10-30030 October 2017 Columbia Generating Station - Issuance of Amendment No. 245 Re: Request for a One-Time Extension of the Residual Heat Removal Train A Completion Time (CAC No. MF8794; EPID L-2016-LLA-0016) ML17188A2302017-08-28028 August 2017 Issuance of Amendment No. 244 Emergency Action Level Scheme Change to Nuclear Energy Institute 99-01, Revision 6 ML17187A2572017-07-24024 July 2017 Columbia Generating Station - Issuance of Amendment No. 243 Re: Adoption of Technical Specifications Task Force Traveler TSTF 545, Revision 3 (CAC No. MF8148) ML17131A0712017-06-27027 June 2017 Columbia Generating Station - Issuance of Amendment No. 242 Re: Reduction of Reactor Steam Dome Pressure Specified in the Technical Specification 2.1.1, "Reactor Core SLs (Safety Limits)" (CAC No. MF8116) ML17095A1172017-05-11011 May 2017 Columbia Generating Station - Issuance Of Amendment No. 241 Re: Measurement Uncertainty Recapture (CAC No. MF8060) ML17046A5072017-02-16016 February 2017 Relief Request for Alternative 4ISI-07 Applicable to the Fourth 10-Year Inservice Inspection Program Interval ML16357A6462017-01-31031 January 2017 Issuance of Amendment No. 239, Adopt Technical Specification Task Force (TSTF)-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month ML17018A0822017-01-24024 January 2017 Relief Request for Alternative 4ISI-05 Applicable to the Fourth 10-Year Inservice Inspection Program Interval ML16292A8722016-11-0303 November 2016 Relief Request 4ISI-06, Use of Code Case N-666-1 on Socket Welded Connections Requiring Repair Due to Vibration Fatigue, Fourth 10-Year Inservice Inspection Interval ML16295A2122016-10-31031 October 2016 Relief Request 4ISI-02, Use of Code Case N-795 Following Repair/Replacement Activities, Fourth 10-Year Inservice Inspection Interval ML16263A2332016-10-0505 October 2016 Relief Request 4ISI-04, Reduced Percentage Requirements for Nozzle to Vessel Welds and Inner Radius Exams, for the Fourth 10-Year Inservice Inspection Interval ML16175A4602016-06-24024 June 2016 Relief Request 4ISI-03, Relief from ASME Code Requirements to Allow Use of Existing Procedures That Implement Repair/Replacement Activities, for the Fourth 10-Year ISI Interval ML16020A0312016-02-16016 February 2016 Issuance of Amendment No. 237, Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability, Using Consolidated Line Item Improvement Process ML15216A2662016-02-0303 February 2016 Issuance of Amendment No. 236, Adoption of Technical Specification Task Force Traveler TSTF-423, Revision 1, Technical Specifications End States, as Part of Consolidated Line Item Improvement Process ML15154A8002015-06-11011 June 2015 Issuance of Amendment No. 235, Extension of Implementation Period for Amendment 232 Changing Technical Specification Table 3.3.1.1-1, Function 7, Scram Discharge Volume Water Level - High (Exigent Circumstances) ML15098A2542015-05-11011 May 2015 Issuance of Amendment No. 234, Request to Revise Technical Specification 2.1.1.2 to Change Safety Limit Minimum Critical Power Ratio Values ML15076A1222015-04-15015 April 2015 Issuance of Amendment No. 233, Request to Revise Technical Specification Surveillance Requirement 3.7.1.1 Related to the Ultimate Heat Sink ML15042A4642015-03-27027 March 2015 Issuance of Amendment No. 231, Request to Revise License Condition Related to Approval of Revised Cyber Security Plan Implementation Schedule ML15063A0102015-03-27027 March 2015 Issuance of Amendment No. 232, Request to Revise Technical Specification Table 3.3.1.1-1 Function 7, Scram Discharge Volume Water Level - High 2023-06-27
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 18, 2009 Mr. J. V. Parrish Chief Executive Officer Energy Northwest P.O. Box 968 (Mail Drop 1023)
Richland, WA 99352-0968 SUB..IECT: COLUMBIA GENERATING STATION - ISSUANCE OF AMENDMENT RE:
CHANGE IN GROUP 1 PRIMARY ISOLATION VALVES REACTOR WATER LEVEL ISOLATION SIGNAL FROM LEVEL 2 TO LEVEL 1 (TAC NO. MD9598)
Dear Mr. Parrish:
The U.S. Nuclear Regulatory Commission (Commission) has issued the enclosed Amendment No. 214 to Facility Operating License No. NPF-21 for the Columbia Generating Station. The amendment consists of changes to the Technical Specifications (TSs) in response to your application dated September 9,2008, as supplemented by letter dated April 24,2009.
The amendment revises TS 3.3.6.1, "Primary Containment Isolation Instrumentation." The change lowers the Group 1 isolation valves reactor water level isolation signal from Level 2 to Level 1.
A copy of the related Safety Evaluation is also enclosed. The Notice of Issuance will be included in the Commission's next biweekly Federal Register notice.
ikY{
Nicholas J. DiFrancesc Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-397
Enclosures:
- 1. Amendment No. 214 to NPF-21
- 2. Safety Evaluation cc w/encls: Distribution via Listserv
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 ENERGY NORTHWEST DOCKET NO. 50-397 COLUMBIA GENERATING STATION AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 214 License No. NPF-21
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Energy Northwest (licensee), dated September 9, 2008, as supplemented by letter dated April 24, 2009, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
Enclosure 1
-2
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and Paragraph 2.C.(2) of Facility Operating License No. NPF-21 is hereby amended to read as follows:
(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 214 and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
- 3. The license amendment is effective as of its date of issuance and shall be implemented prior to entry into Mode 2 during startup from refueling outage 20.
FOR THE NUCLEAR REGULATORY COMMISSION I ffblktttd:Jl~~ ~
Michael T. Markley, Chief /P Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Facility Operating License No. NPF-21 and Technical Specifications Date of Issuance: August 18,2009
ATTACHMENT TO LICENSE AMENDMENT NO. 214 FACILITY OPERATING LICENSE NO. NPF-21 DOCKET NO. 50-397 Replace the following pages of the Facility Operating License No. NPF-21 and Appendix A, Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain vertical lines indicating the areas of change.
Facility Operating License REMOVE INSERT
-3 Technical Specification REMOVE INSERT 3.3.6.1-5 3.3.6.1-5
-3 (3) Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4) Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproduct, source of special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5) Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
(6) Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to store byproduct, source and special nuclear materials not intended for use at Columbia Generating Station. The materials shall be no more than 9 sealed neutron radiation sources designed for insertion into pressurized water reactors and no more than 40 sealed beta radiation sources designed for use in area radiation monitors. The total inventory shall not exceed 24 microcuries of strontium-90, 20 microcuries of uranium-235, 30 curies of plutonium-238, and 3 curies of americium-241.
C. This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1) Maximum Power Level The licensee is authorized to operate the facility at reactor core power levels not in excess of full power (3486 megawatts thermal). Items in Attachment 1 shall be completed as specified. Attachment 1 is hereby incorporated into this license.
(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 214 and the Environmental Protection Plan contained in Appendix S, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
(a) For Surveillance Requirements (SRs) not previously performed by existing SRs or other plant tests, the requirement will be considered met on the implementation date and the next required test will be at the interval specified in the Technical Specifications as revised in Amendment No. 149.
Amendment No. 214
Primary Containment Isolation Instrumentation 3.3.6.1 Table 3.3.6.]-1 (page 1 of 4)
Primary Containment Isolation Instrumentation APPLI CABLE CONDITIONS MODES OR REQUIRED REFERENCED OTHER CHANNELS FROM SPECIFIED PER TRIP REQUIRED SURVEILLANCE ALLOViABLE FUNCT ION CONDIT IONS SYSTEM ACTION C.l REQUIREMENTS VALUE
- 1. Main Steam Line Isolation
- a. Reactor Vessel 1. 2.3 2 D SR 3.3.6.1.2 .:: -142.3 inches Viater Level - Low SR 3,3.6.1.4 Low Low. Level 1 SR 3.3.6.16 SR 3.3.6.1.7
- b. Main Steam Line E SR 3.3.6.1.2 .:: B04 psig Pressu re - Low SR 3.3.6.1.4 SR 3.3.6.1.6 SR 3.3.6.1.7
- c. Main Steam Line 1. 2.3 2 per MSL D SR 3.3.6.1.1 ~ 124 4 psid Flow - High SR 3.3.6.1.2 SR 3.3 6.1.4 SR 3.3.6.1.6 SR 3.3.6.1.7
- d. Condenser. 1. 2( a) . 2 D SR 33.6.1 2 >7.2inches Vacuum - Low SR 3.3.6.1.4 Hg vacuum 3(a) SR 36.1.6
- e. Main Steam Tunnel 1. 2.3 2 D SR 3.36.1.3 ::. 170°F Temperature - High SR 3.3.6.1.4 SR 3 3.6.1.6
- f. Main Steam Tunnel 1. 2.3 2 D SR 3 3.6.1. 3 ~ 90°F Differential SR 3.3.6.1.4 Temperature - High SR3361.6
- g. Manual Initiation 1. 2.3 4 G SR 3.3.6.1.6 NA
- 2. Primary Containment Isolation Reactor Vessel 1 .2.3 2 F SR 3.3.6.1.1 .:: 9.5 inches Water Level - Low, SR 3.3.6.1.2 Level 3 SR 3.3.6.1.4 SR 3.3.6.1.6
- b. Reactor Vessel I. 2.3 H SR 3.3.6. ,2 > -5B inches Viater Level - Low SR 3.3.6 . . 4 Low. Level 2 SR 3.3.6 . . 6
- c. Drywell 1. 2.3 H SR 3.3.6.1.2 ~ I.BB pSig Pressure - High SR 3.3.6.1.4 SR 3.3.6.1.6 (continued)
(a) Viith any turbine throttle valve not closed.
(e) Also required to initiate the associated LOCA Time Delay Relay Function pursuant to LCO 3.3.5.1.
Columbia Generating Statlon 3.3,6.1-5 Amendment No, 149.169.172 214
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 214 TO FACILITY OPERATING LICENSE NO. NPF-21 ENERGY NORTHWEST COLUMBIA GENERATING STATION DOCKET NO. 50-397
1.0 INTRODUCTION
By application dated September 9,2008 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML082610230, Reference 1), as supplemented by letter dated April 24, 2009 (ADAMS Accession No. ML091320471, Reference 5), Energy Northwest (the licensee) requested changes to the Technical Specifications (TSs) (Appendix A to Facility Operating License No. NPF-21) for the Columbia Generating Station (CGS). The requested change would revise TS Table 3.3.6.1-1, "Primary Containment Isolation Instrumentation,"
Function 1.a to lower the Group 1 isolation valves reactor water level isolation signal from Level 2 (L2) to Level 1 (L1). Changing the isolation signal water level from L2 to L1 allows more energy to be transferred to the main condenser rather than the suppression pool via the safety relief valves (SRVs).
Specifically, the licensee proposes to change TS Table 3.3.6.1-1, Function 1.a from:
- 1. Main Steam Line Isolation
- a. Reactor Vessel Water Level - Low Low, Level 2 to:
- 1. Main Steam Line Isolation
- a. Reactor Vessel Water Level - Low Low Low, Level 1 The allowable value of Function 1.a would correspondingly be changed from "~ 68 inches" (Level 2) to "~-142.3 inches" (Level 1).
The proposed change is consistent with NUREG-1433, "Standard Technical Specifications General Electric Plants, BWRl4," Volume 1, Revision 3 (Reference 2), and NUREG-1434, "Standard Technical Specifications General Electric Plants, BWRl6," Volume 1, Revision 3 Enclosure 2
-2 (Reference 3). The !\IRC staff has previously approved the proposed change at several nuclear power plants, including: Amendment No. 83 for Cooper Nuclear Station, dated May 5, 1983; Amendment Nos. 112, 106, and 80 for Browns Ferry, Units 1, 2, and 3, dated September 19, 1984; Amendment Nos. 111 and 115 for Peach Bottom Atomic Power Station, Units 2 and 3, dated October 2, 1985; Amendment No. 25 for Susquehanna Steam Electric Station, Unit 2, dated April 1, 1986; Amendment No. 103 for FitzPatrick Nuclear Power Plant, dated December 19, 1986; and Amendment Nos. 50 and 33 for LaSalle County Station, Units 1 and 2, dated May6, 1987.
In the supplemental letter dated April 24, 2009, the licensee proposed that the implementation period be such as to support implementation prior to entry into Mode 2 during startup from Refueling Outage 20, the change to the implementation date does not expand the scope of the application as originally noticed, and did not change the U.S. Nuclear Regulatory Commission (NRC) staffs original proposed no significant hazards consideration determination as published in the Federal Register on December 2,2008 (73 FR 73353).
2.0 REGULATORY EVALUATION
The NRC staff evaluates the acceptability of the CGS application based on adherence to the following applicable Title 10 of the Code of Federal Regulations (10 CFR), Part 50, Appendix A General Design Criteria (GDCs):
- GDC-16, "Containment design," which requires the reactor containment provide an "essentially leak-tight barrier against uncontrolled release of radioactivity to the environment ... "
- GDC-33, "Reactor coolant makeup," which requires "a system to supply reactor coolant makeup for protection against small breaks in the reactor coolant pressure boundary... The system safety function shall be to assure that specified acceptable fuel design limits are not exceeded as a result of reactor coolant loss due to leakage from the reactor coolant pressure boundary and rupture of small piping or other small components which are part of the boundary..."
- GDC-35, "Emergency core cooling," which requires "a system to provide abundant emergency core cooling ... The system safety function shall be to transfer heat from the reactor core following any loss of reactor coolant at a rate such that (1) fuel and clad damage that could interfere with continued effective core cooling is prevented and (2) clad metal-water reaction is limited to negligible amounts ... "
- GDC-54, "Piping systems penetrating containment," which requires that "piping systems penetrating primary reactor containment shall be provided with leak detection, isolation, and containment capabilities having redundancy, reliability, and performance capabilities which reflect the importance to safety of isolating these piping systems..."
-3 Furthermore, the NRC staff has evaluated the application based on its adherence to the following regulations:
Limiting safety system settings for nuclear reactors are settings for automatic protective devices related to those variables having significant safety functions. Where a limiting safety system setting is specified for a variable on which a safety limit has been placed, the setting must be so chosen that automatic protective action will correct the abnormal situation before a safety limit is exceeded.
3.0 TECHNICAL EVALUATION
The licensee proposes to change the Group 1 primary containment isolation valves reactor water level isolation setpoint from L2 to L1. This allows energy to continue to be transferred to the main condenser for a longer period of time after a scram instead of to the suppression pool via the SRVs. The cycling of the SRVs creates the potential for an SRV to stick or leak and poses additional challenges to the plant. The proposed change has been implemented at several operating boiling-water reactors (BWRs) and has been included in NUREG-1433, Revision 3, and NUREG-1434, Revision 3.
The function of the reactor pressure vessel (RPV) water level initiation signals are to progressively and automatically actuate functions in response to changes in the RPV water level. The current function of RPV water L2 initiation includes the Group 1 isolations which include the main steam isolation valves (MSIVs) and the main steamline drain valves. When L2 is reached, the Group 1 isolation signal is activated and the MSIVs and the main steamline drain valves close. This closure isolates the main turbine and main condenser from the reactor. The main condenser is then no longer available to relieve pressure. The SRVs and suppression pool are utilized for pressure relief. If the Group 1 isolation setpoint is changed from L2 to L1, the need to use the SRVs for pressure relief would become less common.
After the Three Mile Island accident in 1979, NUREG-0737, TMI Action Plan Requirements" (Reference 4), Item II.K.3.16 required licensees to reduce the potential load on SRVs so that the SRVs do not fail. One of the recommendations was to change the Group 1 isolation setpoint from L2 to L1. Due to this recommendation, the plants mentioned in Section 1.0 of this safety evaluation submitted applications to the NRC to lower the Group 1 isolation setpoint from L2 to L1. CGS did not submit an application at the time due to the installation of SRVs with improved reliability. The NRC subsequently incorporated the change to Group 1 isolation setpoint from L2 to L1 into Standard Technical Specifications.
As part of the submittal, the licensee evaluated the anticipated operational occurrences (AOOs),
off-design abnormal transients, and postulated accidents that are discussed in Chapter 15 of the CGS final safety analysis report (FSAR). The evaluation was performed to see if those plant
-4 transients were affected by the change in the Group 1 isolation setpoint from L2 to L1. Most of the transients were not affected by the change because either the L2 setpoint was not challenged during the transient, or the Group 1 isolation was initiated by another signal (such as high steam flow), or the transient was bounded by a more limiting event.
The licensee identified three events that were affected by the Group 1 isolation setpoint change from L2 to L1. These events were: loss of feedwater flow (LOFF), loss-of-coolant accident (LOCA), and anticipated transient without scram (ATWS) with LOFF.
In a LOFF, it is assumed that the feedwater trips and reactor vessel water level drops quickly to the Level 3 (L3) setpoint which initiates a reactor scram. The level continues to drop until L2 is reached, at which point the high pressure core spray (HPCS) and the reactor core isolation cooling (RCIC) systems initiate. The current L2 setpoint would also initiate a signal to shut the Group 1 primary containment isolation valves. With the licensee's proposed change, the Group 1 isolation is not anticipated to occur. The reactor vessel water level will not reach the L1 setpoint in this event and the core will remain adequately covered and cooled using the RCIC system. The heat is carried to the main condenser through the bypass valves. No temperature, pressure, or level transient would occur and challenge the design of the fuel, RPV, or containment.
In a LOCA, it is assumed that RPV water will be flowing through a break in the primary pressure boundary and into the containment, lowering the RPV level and pressure. During a LOCA, several conditions may close the MSIVs prior to the L1 setpoint being reached. For CGS's analysis, lowering the Group 1 isolation setpoint from L2 to L1 would not affect the design-basis accident (DBA) LOCA analysis because the isolation is assumed to occur at the time of LOCA initiation. The licensee stated in its application that closing the MSIVs at the LOCA initiation results in a bounding peak cladding temperature. Therefore, the change in the Group 1 isolation setpoint from L2 to L1 would not challenge the LOCA acceptance criteria for peak cladding temperature or change the radiological consequences of a DBA-LOCA.
In an ATWS-LOFF, it is assumed that the reactor has failed to scram in conjunction with LOFF.
When this happens, the level will decrease to L2 where the reactor recirculation pumps trip which will increase the voiding in the core that will decrease power. HPCS and RCIC also initiate when the L2 setpoint is reached and maintain reactor water level. The main condenser will still be available to condense steam; therefore, SRV cycling will not occur and the suppression pool heatup will be reduced during the event.
Based on the above, the NRC staff finds that the proposed change is acceptable. The licensee has provided adequate justification for the proposed change and the NRC staff concludes that the licensee's evaluation of the licensing basis events provides reasonable assurance that the proposed change to the Group 1 isolation setpoint from the current L2 to L1 will not adversely affect the plant's ability to comply with the regulatory requirements.
-5
4.0 STATE CONSULTATION
In accordance with the Commission's regulations, the Washington State official was notified of the proposed issuance of the amendment. The State official had no comments.
5.0 ENVIRONMENTAL CONSIDERATION
The amendment changes a requirement with respect to the installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20. The NRC staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration and there has been no public comment on such finding published in the Federal Register on December 2, 2008 (73 FR 73353). Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9).
Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.
6.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
7.0 REFERENCES
- 1. S. K. Gambhir, Energy Northwest, to U.S. Nuclear Regulatory Commission, "License Amendment Request for Proposed Changes to Columbia Technical Specification 3.3.6.1; Change Group 1 Primary Containment Isolation Valves Reactor Water Level Isolation Signal from Level 2 to Level 1," dated September 9, 2008, ADAMS Accession No. ML090330141.
- 2. U.S. Nuclear Regulatory Commission, "Standard Technical Specifications General Electric Plants, BWR/4," NUREG-1433, Vol. 1 and 2, Revision 3, June 30, 2004, ADAMS Accession Nos. ML041910194, ML041910212, and ML041910214.
- 3. U.S. Nuclear Regulatory Commission, "Standard Technical Specifications General Electric Plants, BWR/6," NUREG-1434, Vol. 1 and 2, Revision 3, June 30, 2004, ADAMS Accession Nos. ML041910204, ML041910223, and ML041910224.
- 4. U.S. Nuclear Regulatory Commission, "Clarification of TMI Action Plan Requirements,"
NUREG-0737, November 1980, ADAMS Accession No. ML051400209.
-6
- 5. S. K. Gambhir, Energy Northwest, to U.S. Nuclear Regulatory Commission, "Revised Implementation Date for License Amendment Request for Proposed Changes to Columbia Technical Specification 3.3.6.1; Change Group 1 Primary Containment Isolation Valves Reactor Water Level Isolation Signal from Level 2 to Level 1," dated April 24, 2009, ADAMS Accession No. ML091320471.
Principal Contributor: J. Miller Date: August 18, 2009
ML091700146 *SE memo dated OFFICE NRRlLPL4/PM NRR/LPL4/LA DIRS/ITSB/BC DSS/SRXB/BC NRRlDE/EICB OGC NRRlLPL4/BC NRR/LPL4/PM NDiFrancesco RElliott WKemper MMarkley NAME CFLyon for JBurkhardl MHamm for GCranslon* IAhmed for BHarris MThadani for NDiFrancesco DATE 7/21/09 7/21/09 7/23/09 5/22/09 8/3/09 8/6/09 8/18/09 8/18/09