Issue date | Title | Topic | |
---|---|---|---|
0CAN031801, Unit 2 - License Amendment Request - Adoption of Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6 | 29 March 2018 | Unit 2 - License Amendment Request - Adoption of Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6 | Safe Shutdown Fuel cladding |
ML18094A155 | 29 March 2018 | Enclosures 2 - 6: Proposed EAL Technical Basis Document, NEI 99-01. Rev. 6., Proposed EAL Matrix Chart/Review Table and Supporting Referenced Document Pages | Safe Shutdown Boric Acid Time of Discovery High winds Shutdown Margin Reactor Vessel Water Level Ultimate heat sink Offsite Dose Calculation Manual Fire Barrier Time to boil Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Operating Basis Earthquake Operator Manual Action FLEX Annual Radioactive Effluent Release Report Design basis earthquake Earthquake Fuel cladding Pressure Boundary Leakage Grace period |
IR 05000313/2018012 | 29 March 2018 | NRC Confirmatory Action Letter (EA-16-124) Follow-Up Inspection Report 05000313/2018012 and 05000368/2018012 | Boric Acid Offsite Dose Calculation Manual Probabilistic Risk Assessment Temporary Modification Maintenance Rule Program Fire Protection Program |
0CAN031804, Emergency Plan Implementing Procedure | 28 March 2018 | Emergency Plan Implementing Procedure | Safe Shutdown Boric Acid Time of Discovery High winds Reactor Vessel Water Level Ultimate heat sink Grab sample Offsite Dose Calculation Manual Internal Flooding Operating Basis Earthquake Earthquake Fuel cladding Pressure Boundary Leakage Grace period Power change |
2CAN031803, Supplemental Information Supporting the Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled ... | 26 March 2018 | Supplemental Information Supporting the Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled ... | Internal Flooding Probabilistic Risk Assessment Large early release frequency |
ML18082A078 | 23 March 2018 | NRR E-mail Capture - ANO-2 Acceptance Review Final Supplemental Information Request - LAR to Adopt TSTF-425 Revision 3 | Internal Flooding Probabilistic Risk Assessment Surveillance Frequency Control Program Large early release frequency |
ML18075A123 | 20 March 2018 | Entergy Nuclear Operations - March 20, 2018, Presentation Slides for Surveillance Frequency Control Program, UFSAR Change Considerations | Surveillance Frequency Control Program |
ML18081A192 | 20 March 2018 | Presentation at the PRA Workshop | |
0CAN031803, Notification of Confirmatory/Action Letter Focus Area Inspection Readiness | 19 March 2018 | Notification of Confirmatory/Action Letter Focus Area Inspection Readiness | Fire impairment Nondestructive Examination |
CNRO-2018-00011, Submittal of Joint Plant Access Shared Information Table | 19 March 2018 | Submittal of Joint Plant Access Shared Information Table | |
0CAN031802, Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformances Identified in Response to Regulatory Issue Summary 2015-06,... | 19 March 2018 | Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformances Identified in Response to Regulatory Issue Summary 2015-06,... | Safe Shutdown Unanalyzed Condition Tornado Missile Enforcement Discretion FLEX Tornado-Generated Missile Tornado Generated Missile Tornado Missile Protection Time Critical Operator Action TORMIS Tornado Missile Risk Evaluator Earthquake |
ML18081A119 | 15 March 2018 | Rosemount Nuclear Instruments, Inc., Submittal of Notification Under 10 CFR Part 21 for Certain Model 1154 and Model 1154 Serles H Pressure Transmitters and 01154-0153-0002 Amplifier Circuit Card Assemblies | |
Press Release-IV-18-002, NRC Issues Confirmatory Order to Entergy | 14 March 2018 | Press Release-IV-18-002: NRC Issues Confirmatory Order to Entergy | |
2CAN031802, Response to Request for Additional Information - Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule | 13 March 2018 | Response to Request for Additional Information - Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule | Aging Management |
IR 05000416/2017014 | 12 March 2018 | Confirmatory Order, NRC Inspection Report 05000416/2017014, and NRC Investigation Reports 4-2016-004 and 4-2014-021 | Enforcement Discretion Exemption Request |
1CAN031801, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) | 12 March 2018 | Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) | Hot Short Safe Shutdown Shutdown Margin Loop seal High Radiation Area Ultimate heat sink Fire Barrier Stroke time Internal Flooding Hydrostatic Probabilistic Risk Assessment Incorporated by reference Thermoset Surveillance Frequency Control Program Large early release frequency Battery sizing Pressure Boundary Leakage Offsite Circuit Continuous fire watch Fire Protection Program Hourly Fire Watch Power change |
ML18068A087 | 9 March 2018 | Letter Notifying Entergy Operations, Inc. and Entergy Nuclear Operations, Inc., Are No Longer Members of the Nuclear Energy Institute Effective 02/01/2018 | |
L-2018-064, Submittal of Joint Composite Adversary Force | 8 March 2018 | Submittal of Joint Composite Adversary Force | |
ML18096A101 | 7 March 2018 | 2018-02-Public Forms | Probabilistic Risk Assessment |
Press Release-18-008, NRC Issues Annual Assessments for Nation'S Nuclear Plants | 5 March 2018 | Press Release-18-008: NRC Issues Annual Assessments for Nation'S Nuclear Plants | |
ML18064A410 | 5 March 2018 | NRR E-mail Capture - Arkansas Nuclear One, Unit 2 - Acceptance Review of Request to Use Alternative Examination of Rv Flange Threads, ANO2-ISI-020 | |
IR 05000313/2017006 | 1 March 2018 | Annual Assessment Letter for Arkansas Nuclear One, Units 1 and 2 (Report 05000313/2017006 and 05000368/2017006) | Cyber Security Open Phase Condition License Renewal |
ML18058B549 | 27 February 2018 | Single Positive Test Form Collected on 04/05/2017 | |
ML18058B557 | 27 February 2018 | Single Positive Test Form Collected on 4/26/2017 | |
ML18058B550 | 27 February 2018 | Single Positive Test Form Collected on 04/05/2017 | |
ML18058B551 | 27 February 2018 | Single Positive Test Form Collected on 04/08/2017 | |
ML18058B552 | 27 February 2018 | Single Positive Test Form Collected on 04/10/2017 | |
ML18058B566 | 27 February 2018 | Single Positive Test Form Collected on 09/11/2017 | |
ML18058B565 | 27 February 2018 | Single Positive Test Form Collected on 09/07/2017 | |
ML18058B564 | 27 February 2018 | Single Positive Test Form Collected on 09/06/2017 | |
ML18058B553 | 27 February 2018 | Single Positive Test Form Collected on 04/19/2017 | |
ML18058B554 | 27 February 2018 | Single Positive Test Form Collected on 04/19/2017 | |
ML18058B563 | 27 February 2018 | Single Positive Test Form Collected on 09/06/2017 | |
ML18058B562 | 27 February 2018 | Single Positive Test Form Collected on 09/06/2017 | |
ML18058B561 | 27 February 2018 | Single Positive Test Form Collected on 08/02/2017 | |
ML18058B559 | 27 February 2018 | Single Positive Test Form Collected on 07/03/2017 | |
ML18058B555 | 27 February 2018 | Single Positive Test Form Collected on 04/19/2017 | |
ML18058B558 | 27 February 2018 | Single Positive Test Form Collected on 05/01/2017 | |
ML18058B556 | 27 February 2018 | Single Positive Test Form Collected on 04/24/2017 | |
ML18058B534 | 27 February 2018 | Single Positive Test Form Collected on 03/14/2017 | |
ML18058B535 | 27 February 2018 | Single Positive Test Form Collected on 03/14/2017 | |
ML18058B521 | 27 February 2018 | Annual Fatigue Report Form for 2017 | |
ML18058B522 | 27 February 2018 | Annual Report Form for Drug and Alcohol Tests for 2017 | |
ML18058B525 | 27 February 2018 | Single Positive Test Form Collected on 01/18/2017 | |
ML18058B543 | 27 February 2018 | Single Positive Test Form Collected on 3/27/2017 | |
ML18058B530 | 27 February 2018 | Single Positive Test Form Collected on 03/08/2017 | |
ML18058B531 | 27 February 2018 | Single Positive Test Form Collected on 03/14/2017 | |
ML18058B575 | 27 February 2018 | Single Positive Test Form Collected on 11/06/2017 | |
ML18058B539 | 27 February 2018 | Single Positive Test Form Collected on 3/22/2017 | |
ML18058B546 | 27 February 2018 | Single Positive Test Form Collected on 04/03/2017 |