NL-17-0433, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors | 30 March 2017 | Financial Assurance Requirements for Decommissioning Nuclear Power Reactors | Decommissioning Funding Plan |
NL-17-0429, ISFSI Decommissioning Funding Plan Triennial Update | 30 March 2017 | ISFSI Decommissioning Funding Plan Triennial Update | Decommissioning Funding Plan |
ML17062A832 | 29 March 2017 | Relief Request ISI RR-15 Regarding Control Rod Drive Housing Welds Inservice Inspection Requirements | VT-2 Incorporated by reference |
NL-17-0516, Edwin I. Hatch Nuclear Plant, Unit 2 - Submittal of Cycle 25 Core Operating Limits Report Version 1 | 28 March 2017 | Edwin I. Hatch Nuclear Plant, Unit 2 - Submittal of Cycle 25 Core Operating Limits Report Version 1 | |
NL-17-0516, Enclosure 2: Edwin I. Hatch Nuclear Plant, Unit 2 - Cycle 25 Core Operating Limits Report Version 1 | 28 March 2017 | Enclosure 2: Edwin I. Hatch Nuclear Plant, Unit 2 - Cycle 25 Core Operating Limits Report Version 1 | |
ML17090A144 | 28 March 2017 | Submittal of Cycle 25 Core Operating Limits Report Version 1 | |
NL-17-0503, Nuclear Property Insurance Coverage as of April 1, 2017 | 24 March 2017 | Nuclear Property Insurance Coverage as of April 1, 2017 | |
NL-17-0502, Licensee Guarantees of Payment of Deferred Premiums (10 CFR 40.21) | 24 March 2017 | Licensee Guarantees of Payment of Deferred Premiums (10 CFR 40.21) | |
ML17076A434 | 23 March 2017 | TSTF-542 Marked-Up Technical Specifications and Bases for Hatch Nuclear Plant | Safe Shutdown Reactor Vessel Water Level High Radiation Area Stroke time Water Inventory Control Post Accident Monitoring Hydrostatic Operating Basis Earthquake Qualified Offsite Circuit Surveillance Frequency Control Program Power Operated Valves Hardened vent Fuel cladding Offsite Circuit Scaffolding |
ML17076A432 | 23 March 2017 | TSTF-542 Deviations Descriptions for Hatch Nuclear Plant | Water Inventory Control Surveillance Frequency Control Program |
ML17081A453 | 20 March 2017 | Part 21 - Plastic Jar Dedication Sampling | |
ML17023A237 | 16 March 2017 | Issuance of Amendments Regarding the Adoption of NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors(Cac Nos. MF7460-MF7465) | High winds Ultimate heat sink Operating Basis Earthquake Spent Fuel Pool Instrumentation Earthquake Fuel cladding |
IR 05000321/2017405 | 16 March 2017 | NRC Cyber Security Follow Up Inspection (Inspection Report 05000321/2017405 and 05000366/2017405) - Letter Only | Cyber Security Affidavit |
IR 05000366/2017008 | 14 March 2017 | NRC Post-Approval Site Inspection for License Renewal, Inspection Report 05000366/2017008 | Aging Management License Renewal |
IR 05000321/2017008 | 14 March 2017 | Edwin I. Hatch Nuclear Plant - NRC Post-Approval Site Inspection for License Renewal, Inspection Report 05000366/2017008 | Aging Management License Renewal |
ML16141A147 | 14 March 2017 | Issuance of Amendments to Incorporate Southern Nuclear Company Fleet Emergency Plan | |
ML16141A109 | 14 March 2017 | Issuance of Amendments Related to SNC Fleet Emergency Plan | |
IR 05000321/2016006 | 1 March 2017 | Annual Assessment Letter for Edwin I. Hatch Nuclear Plant Units 1 and 2 (Report 05000321/2016006 and 05000366/2016006) | Open Phase Condition |
ML17059D669 | 28 February 2017 | E.I. Hatch (50-321; 50-366), Single Positive Test Form Collected on 01/25/2016 | |
ML17052A021 | 28 February 2017 | Project Manager Assignment | |
NL-17-0231, Annual Fitness for Duty Program Performance Data | 27 February 2017 | Annual Fitness for Duty Program Performance Data | Fitness for Duty |
ML17052A035 | 17 February 2017 | NRR E-mail Capture - Verbal Authorization for Relief Request HNP-ISI-RR-05-01 | |
NL-17-0248, Relief Request Reactor Pressure Vessel Stud Inspection | 17 February 2017 | Relief Request Reactor Pressure Vessel Stud Inspection | VT-2 Finite Element Analysis Liquid penetrant |
CAC:MF9271 | 17 February 2017 | | |
ML17052A684 | 15 February 2017 | Notification of Licensed Operator Initial Examination 05000321/2017301 and 05000366/2017301 | |
ML17030A437 | 15 February 2017 | Summary of Public Meeting with Southern Nuclear Operating Company, Inc. to Discuss the Degraded Grid Voltage Proposed License Amendment Request | |
ML16354A048 | 9 February 2017 | Environmental Assessments and Finding of No Significant Impacts to Southern Nuclear Operating Co., Inc | License Renewal |
NL-17-0063, Response to Verbal Request for Additional Information on Technical Specifications Revision Request to Implement TSTF-500, DC Electrical Re-write | 6 February 2017 | Response to Verbal Request for Additional Information on Technical Specifications Revision Request to Implement TSTF-500, DC Electrical Re-write | |
ML17039A569 | 3 February 2017 | Final Part 21 Report on Defect, Potential for Test Induced Damage 0867F Series Main Steam Safety Relief Valves | |
IR 05000321/2016004 | 31 January 2017 | NRC Integrated Inspection Report 05000321/2016004 and 05000366/2016004 | Functionality Assessment Significance Determination Process Tornado Missile Protection Operability Determination Fire Protection Program Coast down |
ML17030A091 | 30 January 2017 | NRR E-mail Capture - Acceptance Review for Hatch Relief Requests ISI-RR-13, 14, 18, 19, 23, and 24 | |
ML17032A279 | 27 January 2017 | Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 | Generic Fundamentals Examination |
ML17027A020 | 26 January 2017 | NRR E-mail Capture - Acceptance Review for Hatch Relief Requests ISI-RR-15, 16, 17, 21, and 22 | |
ML17019A216 | 26 January 2017 | Staff Review of Spent Fuel Pool Evaluation Associated with Reevaluated Seismic Hazard Implementing Near-Term Task Force Recommendation 2.1 (CAC Nos. MF3772 and MF3773) | Safe Shutdown Earthquake Fukushima Dai-Ichi |
IR 05000321/2016501 | 24 January 2017 | U.S. Nuclear Regulatory Commission Emergency Preparedness Annual Inspection Report 05000321/2016501 and 05000366/2016501 | |
ML17021A000 | 20 January 2017 | Notification of Inspection and Request for Information | Non-Destructive Examination Nondestructive Examination Incorporated by reference Liquid penetrant |
ML17026A414 | 20 January 2017 | C&D Technologies, Inc. - Part 21 - Plastic Jar Dedication Sampling | |
ML16291A030 | 13 January 2017 | Issuance of Amendments the Adoption of TSTF-65-A, Rev. 1, Use of Generic Titles for Utility Positions (CAC Nos. MF7466, MF7467, MF7468, MF7469, MF7470, & MF7471) | High Radiation Area Offsite Dose Calculation Manual Surveillance Frequency Control Program Annual Radiological Environmental Operating Report Fire Protection Program |
ML17003A026 | 10 January 2017 | Request for Withholding Information from Public Disclosure | |
ML17010A374 | 10 January 2017 | Edwin I. Hatch Nuclear Plant, Unit Nos. 1 and 2 - FSAR Part 9 -Redacted | Safe Shutdown High Radiation Area Fire Barrier Hydrostatic Coatings Emergency Lighting Exemption Request Fire Protection Program Fire Watch Early Warning Fire Detection |
ML17010A377 | 10 January 2017 | FSAR Part 11 Redacted | |
ML17010A361 | 10 January 2017 | Edwin I. Hatch Nuclear Plant, Unit Nos. 1 and 2 - FSAR Part 4 - Redacted | Safe Shutdown High winds Shutdown Margin Safety Limit Minimum Critical Power Ratio High Radiation Area Ultimate heat sink Grab sample Offsite Dose Calculation Manual Stroke time Anticipated operational occurrence Tornado Missile Water Inventory Control Safe Shutdown Earthquake Post Accident Monitoring Hydrostatic Probabilistic Risk Assessment Coatings Operating Basis Earthquake Operator Manual Action Squib Emergency Lighting Incorporated by reference Aging Management Tornado Missile Protection Design basis earthquake Scram Discharge Volume Process Control Program Feedwater Controller Failure MELLLA Excess Flow Check Valve License Renewal Earthquake Turbine Missile Fuel cladding Accidental discharge Fire Protection Program Coast down Unidentified leakage Power Uprate Overexposure Failure to Scram |
ML17010A386 | 10 January 2017 | FSAR Part 17 Redacted | |
ML17010A383 | 10 January 2017 | FSAR Part 13 Redacted | |
ML17010A369 | 10 January 2017 | FSAR Part 8 - Redacted | Safe Shutdown Time of Discovery Shutdown Margin Reactor Vessel Water Level Loop seal Grab sample Offsite Dose Calculation Manual Fire Barrier Stroke time Anticipated operational occurrence Post Accident Monitoring Hydrostatic Multiple Spurious Operation Emergency Lighting FLEX B.5.b Missed surveillance Scram Discharge Volume Annual Radiological Environmental Operating Report Excess Flow Check Valve Operability Determination Control of Heavy Loads Continuous fire watch Fire Protection Program Fire Watch Hourly Fire Watch Grace period Power change |
ML17010A336 | 10 January 2017 | Edwin I. Hatch Nuclear Plant, Unit Nos. 1 and 2 - FSAR Part 1 Redacted | Safe Shutdown Shutdown Margin Reactor Vessel Water Level High Radiation Area Ultimate heat sink Grab sample Offsite Dose Calculation Manual Fire Barrier Stroke time Anticipated operational occurrence Tornado Missile Safe Shutdown Earthquake Weld Overlay Hydrostatic Coatings Operating Basis Earthquake Nondestructive Examination Operator Manual Action Squib Water level shrink Emergency Lighting Incorporated by reference Tornado-Generated Missile Aging Management Abnormal operational transient Design basis earthquake Scram Discharge Volume Annual Radiological Environmental Operating Report Process Control Program Excess Flow Check Valve Overtravel License Renewal Earthquake Power-Operated Valves Hardened vent Turbine Missile Fuel cladding Liquid penetrant Offsite Circuit Fire Protection Program Power change Flow Induced Vibration Coast down Unidentified leakage Power Uprate Failure to Scram |
ML17010A365 | 10 January 2017 | FSAR Part 6 Redacted | Safe Shutdown Shutdown Margin Reactor Vessel Water Level Loop seal Offsite Dose Calculation Manual Stroke time Anticipated operational occurrence Post Accident Monitoring Hydrostatic FLEX Missed surveillance Scram Discharge Volume Operability Determination Control of Heavy Loads |
ML17010A388 | 10 January 2017 | FSAR Part 19 Redacted | |
ML17010A387 | 10 January 2017 | FSAR Part 18 Redacted | |
ML17010A357 | 10 January 2017 | FSAR Part 3 Redacted | Safe Shutdown Shutdown Margin Reactor Vessel Water Level High Radiation Area Ultimate heat sink Grab sample Stroke time Anticipated operational occurrence Safe Shutdown Earthquake Weld Overlay Post Accident Monitoring Hydrostatic Coatings Nondestructive Examination Squib Water level shrink Emergency Lighting Incorporated by reference Aging Management Design basis earthquake Scram Discharge Volume Feedwater Controller Failure MELLLA Excess Flow Check Valve Time Critical Operator Action Overtravel License Renewal Earthquake Hardened vent Turbine Missile Fuel cladding Liquid penetrant Pressure boundary leak Fire Protection Program Power change Unidentified leakage Unidentified leak Power Uprate Measurement Uncertainty Recapture |