Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
NOC-AE-16003345, LTR-PAFM-16-11-NP, Revision 0, Technical Justification to Support Extended Volumetric Examination Interval for South Texas, Unit 2 Reactor Vessel Inlet Nozzle to Safe End Dissimilar Metal Welds.31 March 2016LTR-PAFM-16-11-NP, Revision 0, Technical Justification to Support Extended Volumetric Examination Interval for South Texas, Unit 2 Reactor Vessel Inlet Nozzle to Safe End Dissimilar Metal Welds.Safe Shutdown Earthquake
Hydrostatic
Earthquake
Dissimilar Metal Weld
Coast down
ML16090A13229 March 2016NRR E-mail Capture - South Texas Project Units 1 & 2, Draft Audit Plan for April 2016 Risk Audit for GSI-191Probabilistic Risk Assessment
Exemption Request
NOC-AE-16003355, Inservice Inspection Summary Report, 1RE1924 March 2016Inservice Inspection Summary Report, 1RE19FLEX
ML16081A20524 March 2016Summary of Meeting with STP Nuclear Operating Company to Discuss Potential License Amendment Request for South Texas Project, Unit 1 Regarding Permanent Operation with 56 Control RodsShutdown Margin
05000498/LER-2016-00122 March 2016Unit 1 Manual Reactor Trip due to Loss of Main Feedwater to C Train Steam Generator When the Steam Generator Feedwater Regulating Valve Failed Closed
LER 16-001-00 for South Texas Project, Unit 1, Regarding Manual Reactor Trip due to Loss of Main Feedwater to C Train Steam Generator When the Steam Generator Feedwater Regulating Valve Failed Closed
Probabilistic Risk Assessment
ML16082A48422 March 2016NRR E-mail Capture - South Texas Project Units 1 & 2, Draft Request for Additional Information for Risk Review for GSI-191Probabilistic Risk Assessment
ML16076A11818 March 2016Plan for the 2016 Selective Leaching of Aluminum-Bronze Aging Management Program Regulatory Audit Regarding the South Texas Project, Units 1 and 2, License Renewal Application Review (TAC Nos. ME4936 and ME4937)Finite Element Analysis
Aging Management
ML16081A00418 March 2016NRR E-mail Capture - South Texas Project Units 1 & 2, Draft Request for Additional Information for Thermal-hydraulic Review for GSI-191Boric Acid
NOC-AE-16003347, Response to Request for Additional Information Regarding the License Amendment Request for Extension of Containment Leakage Rate Testing Program17 March 2016Response to Request for Additional Information Regarding the License Amendment Request for Extension of Containment Leakage Rate Testing ProgramProbabilistic Risk Assessment
Coatings
ML16082A27116 March 2016SCP Annual Operator Employment Notices
ML16029A27215 March 201612/7-8/2015 Audit Summary, Audit Conducted to Support License Amendment Request to Revise TS 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies for Unit 1 Cycle 20 (Emergency Circumstances)Shutdown Margin
ML16074A04114 March 2016Summary of a Call Held on March 10, 2016, between USNRC and STPNOC, Concerning the Staff's Upcoming Audit Regarding the Amp for the Loss Of Material Due to Selective of Al-Br Welds in the ECW System for the STP LRA (TAC Nos. ME4936 And ME4937)
ML16056A13911 March 2016Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports
NOC-AE-16003348, Response to Request for Additional Information for License Renewal Application 2014 Annual Update (Tac. Nos. ME4936 and ME4937)10 March 2016Response to Request for Additional Information for License Renewal Application 2014 Annual Update (Tac. Nos. ME4936 and ME4937)Boric Acid
Nondestructive Examination
Aging Management
Foreign Material Exclusion
NOC-AE-16003353, Notice Regarding Withdrawal of Funds from Nuclear Decommissioning Trust Subaccounts9 March 2016Notice Regarding Withdrawal of Funds from Nuclear Decommissioning Trust Subaccounts
ML16060A1277 March 2016February 23, 2016, Summary of Conference Calls Held between NRC and STP Concerning Staff's Review of Submerged Closure Bolting Portion of 2014 Annual Update for STP License Renewal Application (TAC ME4936 And ME4937)
ML16076A3193 March 2016Project, Unit 2 - Request for Relief from Code Case N-770-1, Subsection 2400 and Table 1 Inspection Frequency of Reactor Vessel Cold Leg Nozzle to Safe-end Welds with Flaw Analysis (Relief Request RR-ENG-3-20)Nondestructive Examination
Through-Wall Leak
Through Wall Leak
Dissimilar Metal Weld
DM weld
CAC:MF74283 March 2016
IR 05000498/20154022 March 2016Non-Public Security Inspection Plan for South Texas Project Electric Generating Station, Units 1 and 2 (NRC Physical Security Inspection Report Numbers 05000498/2015402 and 05000499/2015402)
IR 05000498/20150062 March 2016Annual Assessment Letter for South Texas Project Electric Generating Station (Report 05000498/2015006 and 05000499/2015006)B.5.b
Spent Fuel Pool Instrumentation
ML16062A3042 March 2016TS 5.3.2 LAR Pre-Submittal Meeting Presentation - March 2, 2016Shutdown Margin
CAC:MF73612 March 2016
ML16091A0051 March 2016NRR E-mail Capture - South Texas Project Units 1 & 2, Draft STP RAI Applicability Matrix for Review of GSI-191Boric Acid
High Radiation Area
Mission time
Weld Overlay
Probabilistic Risk Assessment
Coatings
Fukushima Dai-Ichi
Large early release frequency
Exemption Request
Earthquake
Fuel cladding
Dissimilar Metal Weld
ML16053A1871 March 2016Request for Additional Information, Request to Revise Technical Specification 6.8.3.j, Containment Leakage Rate Testing Program, to Extend Integrated Leak Rate Test Interval from 10 to 15 Years (CAC MF6176-MF6177)
NOC-AE-16003346, Voluntary Response to Regulatory Issue Summary (RIS) 2015-16 Revision 1, Planned Licensing Action Submittals for All Power Reactor Licensees29 February 2016Voluntary Response to Regulatory Issue Summary (RIS) 2015-16 Revision 1, Planned Licensing Action Submittals for All Power Reactor Licensees
NOC-AE-16003342, Submittal of Operations Quality Assurance Plan Change QA-08329 February 2016Submittal of Operations Quality Assurance Plan Change QA-083Fitness for Duty
Probabilistic Risk Assessment
Cyber Security
Large early release frequency
Exemption Request
Fire Protection Program
ML16060A28729 February 2016NRR E-mail Capture - Request for Additional Information - STP LRA Safety ReviewAging Management
NOC-AE-16003341, Submittal of 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes24 February 2016Submittal of 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes
ML16057A03224 February 2016NRR E-mail Capture - South Texas Project, Units 1 & 2, Draft Request for Additional Information Regarding Integrated Leak Rate Testing ExtensionGOTHIC
ML16054A65823 February 2016Single Positive Test Form Collected on 02/04/2015
ML16054A65023 February 2016Single Positive Test Form Collected on 03/12/2015
ML16054A65423 February 2016Single Positive Test Form Collected on 05/21/2015
ML16054A65223 February 2016Single Positive Test Form Collected on 03/18/2015
ML16054A64623 February 2016Single Positive Test Form Collected on 03/09/2015
ML16054A64523 February 2016Single Positive Test Form Collected on 03/02/2015
ML16054A78723 February 2016Annual Report Form for Drug and Alcohol Tests for 2015
ML16054A65323 February 2016Single Positive Test Form Collected on 03/26/2015
ML16054A65923 February 2016Single Positive Test Form Collected on 05/04/2015
ML16054A68423 February 2016Annual Report Form for Drug and Alcohol Tests for 2015
ML16054A64823 February 2016Single Positive Test Form Collected on 03/09/2015
ML16054A65523 February 2016Single Positive Test Form Collected on 01/21/2015
ML16054A65123 February 2016Single Positive Test Form Collected on 08/25/2015
ML16054A64923 February 2016Single Positive Test Form Collected on 03/12/2015
ML16054A65723 February 2016Single Positive Test Form Collected on 06/22/2015
CAC:MF617618 February 2016
ML16050A02618 February 2016NRR E-mail Capture - South Texas Project Units 1 & 2, Request for Additional Information for Integrated Leak Rate Testing Extension Review
NOC-AE-16003338, Submittal of Emergency Plan, Amendment 206 for Unit 1 and Amendment 194 for Unit 218 February 2016Submittal of Emergency Plan, Amendment 206 for Unit 1 and Amendment 194 for Unit 2
NOC-AE-16003340, Annual Fitness for Duty Performance Report for 201518 February 2016Annual Fitness for Duty Performance Report for 2015Fitness for Duty
ML16028A15218 February 20161/14/2016 Summary of Public Meeting with STP Nuclear Operating Company Regarding Modifications to the Licensee'S Risk-Informed Generic Safety Issue (GSI) 191 Application and Supplements for South Texas Project, Units 1 and 2Boric Acid
Exemption Request
CAC:MF797717 February 2016