Issue date | Title | Topic | |
---|---|---|---|
CAC:MF7417 | 31 March 2016 | ||
ML16092A053 | 31 March 2016 | NRR E-mail Capture - Oconee Nuclear Station, Units 1, 2, and 3 - Acceptance for Review of License Amendment Request Related to Keowee Hydro Units Generator Stator Replacements | |
RA-16-0015, Duke - 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums | 31 March 2016 | Duke - 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums | |
RA-16-0010, Duke Energy - Submittal of Onsite Property Insurance Coverage | 31 March 2016 | Duke Energy - Submittal of Onsite Property Insurance Coverage | |
ONS-2016-029, Technical Specification (TS) Bases Change | 29 March 2016 | Technical Specification (TS) Bases Change | Surveillance Frequency Control Program |
ML16088A204 | 28 March 2016 | Memo T Bowers from s Ruffin, Technical Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations W/ Encl 2 (Template) | Decommissioning Funding Plan |
ML16088A205 | 28 March 2016 | Enclosure 1 - (72.30 DFP Reviews to Be Completed 2015) - Memo T Bowers from s Ruffin, Technial Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations | Decommissioning Funding Plan |
Press Release-II-16-012, NRC Schedules Open House to Discuss Agency'S Assessment of Oconee Nuclear Plant | 24 March 2016 | Press Release-II-16-012: NRC Schedules Open House to Discuss Agency'S Assessment of Oconee Nuclear Plant | Open House |
CAC:MF7365 | 23 March 2016 | ||
RIS 2016-02, Design Basis Issues Related to Tube-To-TubeSheet Joints in Pressurized-Water Reactor Steam Generators | 23 March 2016 | Design Basis Issues Related to Tube-To-TubeSheet Joints in Pressurized-Water Reactor Steam Generators | Backfit |
ML16083A370 | 23 March 2016 | NRR E-mail Capture - Oconee Nuclear Station, Units 1, 2 and 3 - Acceptance for Review of Request for Alternative in Accordance with 10 CFR 50.55a(z)(1) (CAC Nos. MF7365, MF7366, and MF7367) | |
ML16082A456 | 22 March 2016 | Oconee Nuclear Station, Unit 3, Notification Of Inspection and Request for Information | |
ML16067A291 | 21 March 2016 | Report of Regulatory Audit Regarding License Amendment Request for Alternate Fission Gas Gap Release Fractions (CAC Nos. MF6480 - MF6486) | |
ONS-2016-028, Response to Request for Additional Information (RAI) Re License Amendment Request (LAR) to Change Emergency Plan to Upgrade ONS Emergency Action Levels Based on NEI 99-01, Revision 6 | 18 March 2016 | Response to Request for Additional Information (RAI) Re License Amendment Request (LAR) to Change Emergency Plan to Upgrade ONS Emergency Action Levels Based on NEI 99-01, Revision 6 | Offsite Dose Calculation Manual |
ML16072A039 | 17 March 2016 | Oconee Nuclear Station, Units 1, 2 and 3 - Staff Review Of Interim Evaluation Associated with Reevaluated Seismic Hazard Implementing Near-Term Task Force Recommendation 2.1 (CAC Nos. MF5254, MF5255 And MF5256) | |
ML16075A022 | 14 March 2016 | Oconee Nuclear Station - Notification of Inspection and Request for Documents | |
ML16056A139 | 11 March 2016 | Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports | |
CAC:MF6290 | 9 March 2016 | ||
ML16061A565 | 9 March 2016 | Request for Additional Information for Relief Request 14-ON-001, Letdown Cooler Nozzle Welds | |
TAC:MF5254 | 9 March 2016 | ||
ML16069A144 | 9 March 2016 | NRR E-mail Capture - Oconee Nuclear Station, Units 1, 2, and 3- Tech Review Checklist Supporting Implementation of NTTF Recom 2.1, Seismic, Related to the Fukushima DAI-ICHI Nuclear Power Plant Accident | Safe Shutdown Ultimate heat sink Safe Shutdown Earthquake FLEX Fukushima Dai-Ichi Earthquake |
ML16068A249 | 8 March 2016 | PNO-II-16-001 - Oconee Unit 1 Shutdown Greater Than 48 Hours Due To Fire/Explosion In The Main Transformer | |
ONS-2016-039, Offsite Dose Calculation Manual, Revision 27 | 7 March 2016 | Offsite Dose Calculation Manual, Revision 27 | Offsite Dose Calculation Manual Anticipated operational occurrence Annual Radioactive Effluent Release Report Annual Radiological Effluent Release Report |
ML16030B343 | 4 March 2016 | Summary of Fish Impingement Report Which Occurred on January 30, 1976 | |
Press Release-II-16-003, NRC Names New Resident Inspector for Oconee Nuclear Power Station | 2 March 2016 | Press Release-II-16-003: NRC Names New Resident Inspector for Oconee Nuclear Power Station | New Resident Inspector |
IR 05000269/2015006 | 2 March 2016 | Annual Assessment Letter for Oconee Nuclear Station Units 1, 2 and 3 (NRC Inspection Report 05000269/2015006, 05000270/2015006 and 05000287/2015006) | Spent Fuel Pool Instrumentation |
ML16053A501 | 1 March 2016 | Relief Request ON-GRR-01 Grace Period for OM Code Frequencies (CAC Nos. MF7130, MF7131, and MF7132) | Power-Operated Valves Grace period |
ONS-2016-025, Completion of Required Action by NRC Order EA-12-051 with Regard to Reliable Spent Fuel Pool Instrumentation | 29 February 2016 | Completion of Required Action by NRC Order EA-12-051 with Regard to Reliable Spent Fuel Pool Instrumentation | Mission time Safe Shutdown Earthquake Operating Basis Earthquake FLEX Fukushima Dai-Ichi Spent Fuel Pool Instrumentation |
IR 05000269/2016403 | 29 February 2016 | Oconee Nuclear Station, Physical Security Inspection Report 05000269/2016403, 05000270/2016403, and 05000287/2016403, February 4, 2016 | Affidavit |
ONS-2016-024, Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | 29 February 2016 | Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | Boric Acid Mission time Tornado Missile FLEX |
ML16056A583 | 26 February 2016 | and 3, Draft Request for Additional Information License Amendment Request to Adopt Emergency Action Level Scheme Based on NEI 99-01 Rev.6 | |
ML16064A020 | 26 February 2016 | License Amendment Request for a Temporary Technical Specification Change to Add a Required Action Completion Time for One Keowee Hydro Unit Inoperable for Generator Stator Replacement, LAR No. 2015-08 | Safe Shutdown Probabilistic Risk Assessment Functionality Assessment FLEX Tornado Missile Protection Maintenance Rule Program Offsite Circuit |
ONS-2016-022, Response to NRC Request for Information Associated with License Amendment Request to Add High Flux Trip for 3 Reactor Coolant Pump Operation, License Amendment Request No. 2014-05, Supplement 2 | 26 February 2016 | Response to NRC Request for Information Associated with License Amendment Request to Add High Flux Trip for 3 Reactor Coolant Pump Operation, License Amendment Request No. 2014-05, Supplement 2 | Rod Drop Event |
IR 05000269/2016008 | 25 February 2016 | NRC Special Inspection Report 05000269/2016008 and 05000287/2016008, January 5, 2016 Through January 14, 2016 | Unanalyzed Condition Time of Discovery High winds Past operability Temporary Modification Aging Management Significance Determination Process Open Phase Condition Operability Determination License Renewal |
ML16054A144 | 23 February 2016 | Single Positive Test Form Collected on 01/13/2015 | |
ML16054A146 | 23 February 2016 | Single Positive Test Form Collected on 03/16/2015 | |
ML16054A157 | 23 February 2016 | Single Positive Test Form Collected on 11/11/2015 | |
ML16054A156 | 23 February 2016 | Single Positive Test Form Collected on 11/09/2015 | |
ML16054A142 | 23 February 2016 | Annual Report Form for Drug and Alcohol Tests for 2015 | |
ML16054A155 | 23 February 2016 | Single Positive Test Form Collected on 10/14/2015 | |
ML16054A153 | 23 February 2016 | Single Positive Test Form Collected on 10/05/2015 | |
ML16054A154 | 23 February 2016 | Single Positive Test Form Collected on 10/19/2015 | |
ML16054A147 | 23 February 2016 | Single Positive Test Form Collected on 04/15/2015 | |
ML16054A145 | 23 February 2016 | Single Positive Test Form Collected on 01/22/2015 | |
ML16054A161 | 23 February 2016 | Annual Fatigue Report Form for 2015 | |
ML16054A148 | 23 February 2016 | Single Positive Test Form Collected on 04/27/2015 | |
ML16054A149 | 23 February 2016 | Single Positive Test Form Collected on 08/10/2015 | |
ML16054A151 | 23 February 2016 | Single Positive Test Form Collected on 09/22/2015 | |
ML16054A152 | 23 February 2016 | Single Positive Test Form Collected on 09/28/2015 | |
ML16054A143 | 23 February 2016 | Single Positive Test Form Collected on 01/06/2015 |