Category:Environmental Report
MONTHYEARRA-21-0297, Subsequent License Renewal Application, Appendix E, Environmental Report Supplement 12021-11-11011 November 2021 Subsequent License Renewal Application, Appendix E, Environmental Report Supplement 1 RA-21-0132, Application for Subsequent Renewed Operating Licenses. Part 7 of 82021-06-0707 June 2021 Application for Subsequent Renewed Operating Licenses. Part 7 of 8 ML21158A1952021-06-0707 June 2021 Application for Subsequent Renewed Operating Licenses. Part 2 of 8 ML21158A1962021-06-0707 June 2021 Application for Subsequent Renewed Operating Licenses. Part 3 of 8 ML21158A1992021-06-0707 June 2021 Application for Subsequent Renewed Operating Licenses. Part 6 of 8 ML16030B3432016-03-0404 March 2016 Summary of Fish Impingement Report Which Occurred on January 30, 1976 ML12145A5362011-12-31031 December 2011 Annual Radiological Environmental Operating Report ML11153A1382010-12-31031 December 2010 Annual Radiological Environmental Operating Report ML0513705792005-05-12012 May 2005 Transmittal of Oconee Nuclear Site, Annual Radiological Environmental Operating Report ML0514703532005-05-0606 May 2005 Letter, Transmittal of Surveys Performed at the Charlotte Office (Corporate and Project Staff) and at the Oconee, Callaway and Calvert Cliffs Sites ML0513705812004-12-31031 December 2004 Annual Radiological Environmental Operating Report, Duke Power Company Oconee Nuclear Station, Units 1, 2, and 3 ML0412404322003-11-20020 November 2003 Radioactive Waste Process Control Program Manual, Corporate Process Control Program, Revision 14 ML0514703632003-11-11011 November 2003 Letter, Transmittal of Survey Forms for the Final Surveys Required Under the Order, Performed at the Washington Group Offices in Princeton and Downers Grove, and at the Oconee Site ML0312604562003-04-24024 April 2003 Revision to the 2001 Annual Effluent Release Report ML0214000592002-05-0808 May 2002 Annual Radiological Environmental Operating Report 2021-06-07
[Table view] Category:Letter
MONTHYEARML23304A1422024-02-0101 February 2024 Issuance of Environmental Scoping Summary Report Associated with the U.S. Nuclear Regulatory Commission Staffs Review of the Oconee Nuclear Station, Units 1, 2, & 3, Subsequent License Renewal Application ML24005A2492024-01-24024 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) IR 05000269/20243012024-01-11011 January 2024 Notification of Licensed Operator Initial Examination 05000269/2024301, 05000270/2024301, and 05000287/2024301 ML23331A7982023-12-14014 December 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report (01R32) ML23262A9672023-12-13013 December 2023 Alternative to Use RR-22-0174, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section XI, Division 1 ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000269/20230032023-11-14014 November 2023 Integrated Inspection Report 05000269/2023003, 05000270/2023003, and 05000287/2023003; and IR 07200040/2023001; and Exercise of Enforcement Discretion ML23219A1402023-10-10010 October 2023 Audit Report Proposed Alternative to Use ASME Code Case N-752, Risk Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems XI, Division 1 ML23269A1102023-10-0606 October 2023 Letter to Steven Snider-Revised Schedule for the Environmental Review of the Oconee Nuclear Station, Unit 1, 2, and 3, Subsequent License Renewal Application ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000269/20230112023-08-25025 August 2023 Comprehensive Engineering Team Inspection Report 05000269/2023011 and 05000270/2023011 and 05000287/2023011 IR 05000269/20230052023-08-25025 August 2023 Updated Inspection Plan for Oconee Nuclear Station Units 1, 2 and 3 (Report 05000269/2023005, 05000270/2023005, and 05000287/2023005) IR 05000269/20230022023-07-28028 July 2023 Integrated Inspection Report 05000269/2023002, 05000270/2023002 and 05000287/2023002 ML23208A0972023-07-27027 July 2023 Subsequent License Renewal List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected IR 05000269/20230102023-07-19019 July 2023 Biennial Problem Identification and Resolution Inspection Report 05000269/2023010 and 05000270/2023010 and 05000287/2023010 and Notice of Violation ML23178A0682023-07-0303 July 2023 Audit Plan Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 & 3 Systems Section XI, Division 1 ML23132A2392023-06-0101 June 2023 Summary of the April 2023 Remote Environmental Audit Related to the Review of the Subsequent License Renewal Application ML23144A0192023-05-25025 May 2023 Review of the Spring 2022 Steam Generator Tube Inspection Report (O3R31) IR 05000269/20230012023-05-12012 May 2023 Integrated Inspection Report 05000269/2023001 and 05000270/2023001 and 05000287/2023001 ML23121A0552023-05-0303 May 2023 Acknowledgement of Withdrawal Request to Revise TS 5.5.2 Containment Leakage Rate Testing Program ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML23117A0432023-04-20020 April 2023 Framatome, Inc., Part 21 Notification of Existence of a Defect ML23075A0732023-04-0505 April 2023 License Renewal Regulatory Audit Regarding the Environmental Review of the Subsequent License Renewal Application Supplement (EPID Number L-2021-SLE-0002) ML23045A1332023-03-15015 March 2023 Request for Scoping Comments Concerning the Supplemental Environmental Review of Oconee Nuclear Station, Units 1, 2, and 3, Subsequent License Renewal Application - Achp Letter ML23045A1402023-03-15015 March 2023 Request for Scoping Comments Concerning the Supplemental Environmental Review of Oconee Nuclear Station, Units 1, 2, and 3, Subsequent License Renewal Application - Shpo Letter ML23045A1432023-03-15015 March 2023 Request for Scoping Comments Concerning the Supplemental Environmental Review of Oconee Nuclear Station, Units 1, 2, and 3, Subsequent License Renewal Application - State Tribe Letter ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility ML23069A1102023-03-10010 March 2023 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML23061A1772023-03-0303 March 2023 Notification of Oconee Nuclear Station Comprehensive Engineering Team Inspection - NRC Inspection Report 05000269/2023011, 05000270/2023011 and 05000287/2023011 IR 05000269/20220062023-03-0101 March 2023 Annual Assessment Letter for Oconee Nuclear Nuclear Station, Units 1, 2 and 3 (NRC Inspection Report 05000269/2022006, 05000270/2022006, and 05000287/2022006) ML23039A1632023-02-0808 February 2023 Requalification Program Inspection ML23037A0772023-02-0606 February 2023 402 Cyber Notification and RFI Letter Final IR 05000269/20220042023-02-0202 February 2023 Integrated Inspection Report 05000269 2022004 and 05000270/2022004 and 05000287/2022004 ML22363A3942023-01-12012 January 2023 Subsequent License Renewal Environmental Report Supplement - Proposed Review Schedule ML22356A0512022-12-14014 December 2022 Curtiss-Wright Nuclear Division, Letter Regarding Potential Efect in a Configuration of the 11/2 Inch Quick Disconnect Connector Cable Assemblies Supplied to Duke Energy (See Attached Spreadsheet) for a Total of 460 of Connectors Only Suppl ML22321A0492022-12-0808 December 2022 Issuance of Amendment Nos. 426, 428 and 427, Additional Mode Change Limitations Applicable to the Adoption of TSTF- 359, Revision 9, Increase Flexibility in Mode Restraints ML22329A1042022-11-29029 November 2022 Review of the Fall 2021 Steam Generator Tube Inspection Report ML22321A1582022-11-22022 November 2022 Summary of Conference Call Regarding the Fall 2022 Steam Generator Tube Inspections ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 IR 05000269/20220032022-11-0707 November 2022 Integrated Inspection Station 05000269/2022003 and 05000270/2022003 and 05000287/2022003 ML22301A0112022-11-0303 November 2022 Request for Withholding Information from Public Disclosure Regarding the SLR Application - September 2, 2022 ML22298A0752022-10-27027 October 2022 Request for Withholding Information from Public Disclosure Regarding the Subsequent License Renewal Application Duke Energy Letter Dated July 25, 2022 ML22264A0322022-10-20020 October 2022 _Request for Withholding Information from Public Disclosure Regarding the Subsequent License Renewal Application - Duke Energy Letter Dated July 8, 2022 IR 05000269/20220112022-09-26026 September 2022 NRC Inspection Report 05000269/2022011 and 05000270/2022011 and 05000287/2022011 ML22258A0302022-09-15015 September 2022 Evacuation Time Estimate Reports ML22222A0072022-09-14014 September 2022 Request for Withholding Information from Public Disclosure Regarding the Subsequent License Renewal Application ML22231B1362022-09-0101 September 2022 Review of the Draft Environmental Assessment and Findings of No Significant Impact for Catawba Nuclear Station, H.B. Robinson Steam Electric Plant, and Oconee Nuclear Station Independent Spent Fuel Storage Installation Decommissioning Fundi ML22234A0062022-08-30030 August 2022 SLRA - Closed Public Meeting Summary - August 18, 2022 2024-02-01
[Table view] |
Text
KJN.cFOB ~95U.S. NU1CLEAR REGULATORY COMWSIO DOCKET NUMBER
. 5 0-26 2 87 NRC DISTRIBUTION FOR PART 50 IDOCKET MATERIAL W ri E NUMBER TO: FROM 0 uk [V[-, Co. DATE OF DOCUMENT B.C. Rusche Charlotte, N.C... 2-46 ~
W.Parker, Jr. DATE RECEIVED 2-10-761 EUXETTEn LINOTORIZED PROP INPUT FORM NMBER OF COPIES RECEIVED INORIGINAL EJUNCLASSIFIED Ejcopy DIESCRIPTION ENCLOSURE Summary of Fish Impingement Report which occur-ed on 1-30-76... W/Attached Summary Data.
(1 Copy Received)'
DO NOT RMOVE ACKNOWLEDGED PLANT NAMEW: Oconee #1,2,&3 FOR ACTION/INFORM0ATION ENVI7-SR7FW7--27 ILICO &
__SAIETY A--TSSTCGNDAD. ASSIGNED AD) ______
BRAWN-, Dckpr W/2 -__
PROJLCT 1iIANAGER- - PROJECT 1,ANAC ER .
A-STO ___________ LTC. ASST. Seppard ___
_________INTERNAL DISTRIBUTION EQ ~~~~SYSTEMhS SAFETY __ i TYS.L 'I~iJcL____
- Nx PD__________ ~ LP~iA~ ___IIIIIEGO ___ ERNST EDR BENAROYA -BLLR OFLD0_______ LAI NAS SPANGLER
- OSSICK &_STAFF- -FriTlIN- IPPOLITOSIETC CASE ____KITCHT -- __ ___ OPERATING REACTORS GANI4ILL 1NA Ul'R ____ 17ILL___ _ STELLO ___ STE-up
-PAIUIL TCKI _________ -- IAN
____ _______________OPERlATING TECH _______
PROJECT MANAGEMENT REA CTORSAFETY ElSENHUT ST. Ti' ANALYSIS B-OYD ROSS ___ SIIAO ___ VOLLNMER P. COLLINS NOVAK BAER ____________ j HOUSTON _____ ROSZTOCZY SCEWENCER ,;--J. COLLINS __
PTRSON CCKGRIE _____ n1EGER 1-1ELTEMIES___ __ AT & I___ -SITE SAFE'iY & ENVIR _ ______ __
1 ___ 0____T SALTENAN -ANALYSIS- - __________
zifsuv ~ ~ ~ R Tu - -, ---.--.--- G N76i7O& MjL*LER_______
fm~
EXTERJNAL DISTRIBUTION CONTROL- NUNIGER ThPR:Wa] hal 1s S -j !TL LIAB ORNL __ ROHVNET LAB
-TIC RE"C. V-Ir ____ ULRIKSON (ORILQ ___//
I...............__ i2~i C1 __A ____ 307 ASXCONStILTAN'r ___ .-.----- _______
NRiC FORM 1915 (2-76)
DUKE POWERZ COMPANY POWEr BUILDING 422 Sour CnuncH STREET, CHARLOTTE, N. C. 28242 WILLIAM 0. PARKER,JR.
VICE PRESIDENT TELEPHONE: AREA 704 STEAM PRODUCTION 373-4083 February 4, 1976 Mr. Benard C. Rusche Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission uct Washington, D. C. 20555 i S ,"
Re: Oconee Nuclear Station Docket Nos. 50-269, -270, -287 \
Dear Mr. Rusche:
On January 30, 1976, two of the 24 condenser cooling water (CCW) intake screens at the Oconee Nuclear Station were inspected. A total of 13,250 small fingerling fish, weighing 33.1 Kg., had collected on the screens.
The fish were removed from the screens and categorized, where possible, as to screen location, type, size, degree of decomposition, and weight.
This information is tabulated in Enclosure 1. It is concluded that the mortality of these 33.1 Kg. of fish had an insignificant effect on fisheries resources in Lake Keowee.
Very truly yours, William 0. Parker, Jr. E Matt SectIon MST:mmb Docket Clerk Enclosure CC Mr. H. J. Logan S. C. Wildlife & Marine Resources Department 1317
Enclosure 1 Summary of Fish Impingement Data Per Intake Screen Oconee Nuclear Station January 30, 1976 Screen 2Al Total Fish'Impinged - 10,100 Species Composition Size Groups Decomposition* Weight Threadfin shad - 6600 4-6 cm - 8300 Class 2 - 900 Unidentifiable - 3500 6-8 cm - 1800 Class 3 - 5700 x,25.25 kg Class 4 - 3500 Screen 2A2 Total Fish Impinged - 3,150 Species Composition Size Groups Decomposition Weight Threadfin shad - 2450 4-6 cm - 2700 Class 2 - 700 Unidentifiable - 700 6-8 cm - 450 Class 3 - 1750 "7.88 kg Class 4 - 700
- Class 1 - No noticeable decomposition Class 2 - Slightly decomposed Class 3 - Badly decomposed, .identifiable Class 4 - Badly decomposed, unidentifiable
KJN.cFOB ~95U.S. NU1CLEAR REGULATORY COMWSIO DOCKET NUMBER
. 5 0-26 2 87 NRC DISTRIBUTION FOR PART 50 IDOCKET MATERIAL W ri E NUMBER TO: FROM 0 uk [V[-, Co. DATE OF DOCUMENT B.C. Rusche Charlotte, N.C... 2-46 ~
W.Parker, Jr. DATE RECEIVED 2-10-761 EUXETTEn LINOTORIZED PROP INPUT FORM NMBER OF COPIES RECEIVED INORIGINAL EJUNCLASSIFIED Ejcopy DIESCRIPTION ENCLOSURE Summary of Fish Impingement Report which occur-ed on 1-30-76... W/Attached Summary Data.
(1 Copy Received)'
DO NOT RMOVE ACKNOWLEDGED PLANT NAMEW: Oconee #1,2,&3 FOR ACTION/INFORM0ATION ENVI7-SR7FW7--27 ILICO &
__SAIETY A--TSSTCGNDAD. ASSIGNED AD) ______
BRAWN-, Dckpr W/2 -__
PROJLCT 1iIANAGER- - PROJECT 1,ANAC ER .
A-STO ___________ LTC. ASST. Seppard ___
_________INTERNAL DISTRIBUTION EQ ~~~~SYSTEMhS SAFETY __ i TYS.L 'I~iJcL____
- Nx PD__________ ~ LP~iA~ ___IIIIIEGO ___ ERNST EDR BENAROYA -BLLR OFLD0_______ LAI NAS SPANGLER
- OSSICK &_STAFF- -FriTlIN- IPPOLITOSIETC CASE ____KITCHT -- __ ___ OPERATING REACTORS GANI4ILL 1NA Ul'R ____ 17ILL___ _ STELLO ___ STE-up
-PAIUIL TCKI _________ -- IAN
____ _______________OPERlATING TECH _______
PROJECT MANAGEMENT REA CTORSAFETY ElSENHUT ST. Ti' ANALYSIS B-OYD ROSS ___ SIIAO ___ VOLLNMER P. COLLINS NOVAK BAER ____________ j HOUSTON _____ ROSZTOCZY SCEWENCER ,;--J. COLLINS __
PTRSON CCKGRIE _____ n1EGER 1-1ELTEMIES___ __ AT & I___ -SITE SAFE'iY & ENVIR _ ______ __
1 ___ 0____T SALTENAN -ANALYSIS- - __________
zifsuv ~ ~ ~ R Tu - -, ---.--.--- G N76i7O& MjL*LER_______
fm~
EXTERJNAL DISTRIBUTION CONTROL- NUNIGER ThPR:Wa] hal 1s S -j !TL LIAB ORNL __ ROHVNET LAB
-TIC RE"C. V-Ir ____ ULRIKSON (ORILQ ___//
I...............__ i2~i C1 __A ____ 307 ASXCONStILTAN'r ___ .-.----- _______
NRiC FORM 1915 (2-76)
DUKE POWERZ COMPANY POWEr BUILDING 422 Sour CnuncH STREET, CHARLOTTE, N. C. 28242 WILLIAM 0. PARKER,JR.
VICE PRESIDENT TELEPHONE: AREA 704 STEAM PRODUCTION 373-4083 February 4, 1976 Mr. Benard C. Rusche Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission uct Washington, D. C. 20555 i S ,"
Re: Oconee Nuclear Station Docket Nos. 50-269, -270, -287 \
Dear Mr. Rusche:
On January 30, 1976, two of the 24 condenser cooling water (CCW) intake screens at the Oconee Nuclear Station were inspected. A total of 13,250 small fingerling fish, weighing 33.1 Kg., had collected on the screens.
The fish were removed from the screens and categorized, where possible, as to screen location, type, size, degree of decomposition, and weight.
This information is tabulated in Enclosure 1. It is concluded that the mortality of these 33.1 Kg. of fish had an insignificant effect on fisheries resources in Lake Keowee.
Very truly yours, William 0. Parker, Jr. E Matt SectIon MST:mmb Docket Clerk Enclosure CC Mr. H. J. Logan S. C. Wildlife & Marine Resources Department 1317
Enclosure 1 Summary of Fish Impingement Data Per Intake Screen Oconee Nuclear Station January 30, 1976 Screen 2Al Total Fish'Impinged - 10,100 Species Composition Size Groups Decomposition* Weight Threadfin shad - 6600 4-6 cm - 8300 Class 2 - 900 Unidentifiable - 3500 6-8 cm - 1800 Class 3 - 5700 x,25.25 kg Class 4 - 3500 Screen 2A2 Total Fish Impinged - 3,150 Species Composition Size Groups Decomposition Weight Threadfin shad - 2450 4-6 cm - 2700 Class 2 - 700 Unidentifiable - 700 6-8 cm - 450 Class 3 - 1750 "7.88 kg Class 4 - 700
- Class 1 - No noticeable decomposition Class 2 - Slightly decomposed Class 3 - Badly decomposed, .identifiable Class 4 - Badly decomposed, unidentifiable