Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ULNRC-06341, Callaway Plant Unit 1 - Enclosure 6 - 10-Q Filed Period 3/31/2016 | 31 March 2016 | Callaway Plant Unit 1 - Enclosure 6 - 10-Q Filed Period 3/31/2016 | Power change |
ML16348A380 | 31 March 2016 | Enclosure 6 - 10-Q Filed Period 3/31/2016 | Power change |
ML16348A388 | 31 March 2016 | Enclosure 14 - Schedule 14C Information for Union Electric Company - March 2016 | Incorporated by reference |
ML16091A152 | 31 March 2016 | Request to Review and Update Guidance in National Fire Protection Association (NFPA) 805 Frequently Asked Question (FAQ) 07-0040 | Time to boil Fire Protection Program |
ULNRC-06341, Callaway Plant Unit 1 - Enclosure 14 - Schedule 14C Information for Union Electric Company - March 2016 | 31 March 2016 | Callaway Plant Unit 1 - Enclosure 14 - Schedule 14C Information for Union Electric Company - March 2016 | |
ULNRC-06349, Callaway, Unit 1 - Enclosure 6 to ULNRC-06349 - Non-Unanimous Stipulation and Agreement | 30 March 2016 | Callaway, Unit 1 - Enclosure 6 to ULNRC-06349 - Non-Unanimous Stipulation and Agreement | |
ULNRC-06292, Transmittal of 10 CFR50.46 Annual Report ECCS Evaluation Model Revisions | 30 March 2016 | Transmittal of 10 CFR50.46 Annual Report ECCS Evaluation Model Revisions | |
ML17097A568 | 30 March 2016 | Enclosure 6 to ULNRC-06349 - Non-Unanimous Stipulation and Agreement | |
ML16089A071 | 29 March 2016 | Generic Fundamentals Examination Results for March 9, 2016 | Generic Fundamentals Examination |
ULNRC-06289, Nuclear Property Insurance Reporting | 28 March 2016 | Nuclear Property Insurance Reporting | |
ML16055A464 | 17 March 2016 | Relief Requests 13R-09 (Steam Generator Tubesheet Weld), 13R-11 (Pressurizer Welds) from Code Case N-460 and 13R-18 (SG Weld), from Appendix Viii Requirements, Third 10-Year Inservice Inspection Interval (CAC MF6735-MF6737) | VT-2 Incorporated by reference |
ML16082A271 | 16 March 2016 | SCP Annual Operator Employment Notices | |
ML16056A139 | 11 March 2016 | Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports | |
ML16070A145 | 10 March 2016 | Closure of Investigation (OI 4-2015-002) | |
ML16061A301 | 2 March 2016 | Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: March 15, 2016 | Safe Shutdown Earthquake Cyber Security Surveillance Frequency Control Program Process Control Program Time Critical Operator Action Exemption Request Fuel cladding |
IR 05000483/2015402 | 2 March 2016 | Non-Public Security Inspection Plan for Callaway Plant (NRC Physical Security Inspection Report Number 05000483/2015402) | |
ULNRC-06285, Single Positive Test Form Collected on 02/18/2016 | 2 March 2016 | Single Positive Test Form Collected on 02/18/2016 | |
ML16062A386 | 2 March 2016 | Single Positive Test Form Collected on 02/18/2016 | |
IR 05000483/2015006 | 2 March 2016 | Annual Assessment Letter for Callaway Plant (Report 05000483/2015006) | Spent Fuel Pool Instrumentation |
ML16020A516 | 29 February 2016 | Issuance of Amendment No. 216, Revise Technical Specification (TS) 2.1.1.1 and TS 5.6.5, to Remove Uncertainties from Departure from Nucleate Boiling Ratio Safety Limit and Adopt WCAP-14565-P-A Methodology | Anticipated operational occurrence |
ML16057A445 | 26 February 2016 | Single Positive Test Form Collected on 08/14/2015 | |
ML16057A444 | 26 February 2016 | Single Positive Test Form Collected on 08/13/2015 | |
ML16057A446 | 26 February 2016 | Single Positive Test Form Collected on 12/08/2015 | |
ML16057A447 | 26 February 2016 | Single Positive Test Form Collected on 12/21/2015 | |
ML16056A189 | 25 February 2016 | Annual Report Form for Drug and Alcohol Tests for 2015 | |
ULNRC-06281, Notice of Organization Change | 24 February 2016 | Notice of Organization Change | |
ML16054A835 | 23 February 2016 | Sequence of Events Timeline | Ultimate heat sink FLEX |
ML16054A842 | 23 February 2016 | Sixth Six-Month Status Report for the Implementation of Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation. | FLEX Spent Fuel Pool Instrumentation |
ULNRC-06279, Submittal of Single Positive Test Forms for 2015 | 23 February 2016 | Submittal of Single Positive Test Forms for 2015 | |
ULNRC-06280, Submittal of Callaway Unit 1 Fitness for Duty Program Performance Data for 2015 | 23 February 2016 | Submittal of Callaway Unit 1 Fitness for Duty Program Performance Data for 2015 | Fitness for Duty |
CAC:MF0772 | 23 February 2016 | ||
ULNRC-06282, Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | 23 February 2016 | Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | FLEX |
ULNRC-06283, Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) | 23 February 2016 | Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) | Spent Fuel Pool Instrumentation |
ML16054A837 | 23 February 2016 | Sixth Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events. | Safe Shutdown Boric Acid Shutdown Margin Time to boil Safe Shutdown Earthquake FLEX Earthquake |
IR 05000483/2015004 | 11 February 2016 | NRC Integrated Inspection Report 05000483/2015004 | Safe Shutdown Boric Acid High winds High Radiation Area Ultimate heat sink Internal Flooding Emergency Lighting Functionality Assessment Locked High Radiation Area Condition Adverse to Quality Significance Determination Process Pressure and Temperature Limits Report Operability Determination Fuel cladding Fire Protection Program Downpower Unidentified leakage |
TAC:MF7149 | 7 February 2016 | ||
ML16013A456 | 7 February 2016 | Response Regarding Phase 2 Staffing Submittals Associated with Near-Term Task Force Recommendation 9.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant | Fukushima Dai-Ichi Minimum staff |
ML16034A157 | 3 February 2016 | Annual Fatigue Report Form for 2015 | |
ML15324A114 | 2 February 2016 | Issuance of Amendment No. 215, Adopt Technical Specification Task Force (TSTF) Traveler TSTF-510, Revision 2, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection | Shutdown Margin High Radiation Area Offsite Dose Calculation Manual Post Accident Monitoring Hydrostatic Nondestructive Examination Pressure and Temperature Limits Report Surveillance Frequency Control Program Annual Radiological Environmental Operating Report Process Control Program |
CAC:MF5613 | 29 January 2016 | ||
ML16027A158 | 29 January 2016 | Relief Request I4R-02 from Requirements of ASME Code Section XI, Table IWF-2500-1 for 100% Visual Examination of Class 1 Supports, Fourth 10-Year Inservice Inspection Interval | Incorporated by reference |
CAC:MF6180 | 28 January 2016 | ||
ML15328A059 | 28 January 2016 | Issuance of Amendment No. 214, Request to Revise Operating License Condition Related to Cyber Security Plan Milestone 8 Full Implementation Date | Cyber Security |
05000483/LER-2015-003 | 21 January 2016 | Reactor Trip Caused by Transmission Line Fault LER 15-003-01 for Callaway, Unit 1, Regarding Reactor Trip Caused by Transmission Line Fault | |
IR 05000483/2015009 | 13 January 2016 | IR 05000483/2015009, September 21, 2015 Through December 9, 2015, Callaway Plant - Special Report | Stroke time Condition Adverse to Quality Significance Determination Process Operability Determination Operability Assessment |
ULNRC-06275, Response to Request for Additional Information (RA) Related to Operating Quality Assurance Manual (Oqam), Revision 31, Oqam Change Notice 15-002 | 12 January 2016 | Response to Request for Additional Information (RA) Related to Operating Quality Assurance Manual (Oqam), Revision 31, Oqam Change Notice 15-002 | Commercial Grade Dedication |
IR 05000483/2015501 | 6 January 2016 | NRC Emergency Preparedness Annual Inspection Report 05000483/2015501 |