Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ULNRC-06341, Callaway Plant Unit 1 - Enclosure 6 - 10-Q Filed Period 3/31/201631 March 2016Callaway Plant Unit 1 - Enclosure 6 - 10-Q Filed Period 3/31/2016Power change
ML16348A38031 March 2016Enclosure 6 - 10-Q Filed Period 3/31/2016Power change
ML16348A38831 March 2016Enclosure 14 - Schedule 14C Information for Union Electric Company - March 2016Incorporated by reference
ML16091A15231 March 2016Request to Review and Update Guidance in National Fire Protection Association (NFPA) 805 Frequently Asked Question (FAQ) 07-0040Time to boil
Fire Protection Program
ULNRC-06341, Callaway Plant Unit 1 - Enclosure 14 - Schedule 14C Information for Union Electric Company - March 201631 March 2016Callaway Plant Unit 1 - Enclosure 14 - Schedule 14C Information for Union Electric Company - March 2016
ULNRC-06349, Callaway, Unit 1 - Enclosure 6 to ULNRC-06349 - Non-Unanimous Stipulation and Agreement30 March 2016Callaway, Unit 1 - Enclosure 6 to ULNRC-06349 - Non-Unanimous Stipulation and Agreement
ULNRC-06292, Transmittal of 10 CFR50.46 Annual Report ECCS Evaluation Model Revisions30 March 2016Transmittal of 10 CFR50.46 Annual Report ECCS Evaluation Model Revisions
ML17097A56830 March 2016Enclosure 6 to ULNRC-06349 - Non-Unanimous Stipulation and Agreement
ML16089A07129 March 2016Generic Fundamentals Examination Results for March 9, 2016Generic Fundamentals Examination
ULNRC-06289, Nuclear Property Insurance Reporting28 March 2016Nuclear Property Insurance Reporting
ML16055A46417 March 2016Relief Requests 13R-09 (Steam Generator Tubesheet Weld), 13R-11 (Pressurizer Welds) from Code Case N-460 and 13R-18 (SG Weld), from Appendix Viii Requirements, Third 10-Year Inservice Inspection Interval (CAC MF6735-MF6737)VT-2
Incorporated by reference
ML16082A27116 March 2016SCP Annual Operator Employment Notices
ML16056A13911 March 2016Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports
ML16070A14510 March 2016Closure of Investigation (OI 4-2015-002)
ML16061A3012 March 2016Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: March 15, 2016Safe Shutdown Earthquake
Cyber Security
Surveillance Frequency Control Program
Process Control Program
Time Critical Operator Action
Exemption Request
Fuel cladding
IR 05000483/20154022 March 2016Non-Public Security Inspection Plan for Callaway Plant (NRC Physical Security Inspection Report Number 05000483/2015402)
ULNRC-06285, Single Positive Test Form Collected on 02/18/20162 March 2016Single Positive Test Form Collected on 02/18/2016
ML16062A3862 March 2016Single Positive Test Form Collected on 02/18/2016
IR 05000483/20150062 March 2016Annual Assessment Letter for Callaway Plant (Report 05000483/2015006)Spent Fuel Pool Instrumentation
ML16020A51629 February 2016Issuance of Amendment No. 216, Revise Technical Specification (TS) 2.1.1.1 and TS 5.6.5, to Remove Uncertainties from Departure from Nucleate Boiling Ratio Safety Limit and Adopt WCAP-14565-P-A MethodologyAnticipated operational occurrence
ML16057A44526 February 2016Single Positive Test Form Collected on 08/14/2015
ML16057A44426 February 2016Single Positive Test Form Collected on 08/13/2015
ML16057A44626 February 2016Single Positive Test Form Collected on 12/08/2015
ML16057A44726 February 2016Single Positive Test Form Collected on 12/21/2015
ML16056A18925 February 2016Annual Report Form for Drug and Alcohol Tests for 2015
ULNRC-06281, Notice of Organization Change24 February 2016Notice of Organization Change
ML16054A83523 February 2016Sequence of Events TimelineUltimate heat sink
FLEX
ML16054A84223 February 2016Sixth Six-Month Status Report for the Implementation of Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation.FLEX
Spent Fuel Pool Instrumentation
ULNRC-06279, Submittal of Single Positive Test Forms for 201523 February 2016Submittal of Single Positive Test Forms for 2015
ULNRC-06280, Submittal of Callaway Unit 1 Fitness for Duty Program Performance Data for 201523 February 2016Submittal of Callaway Unit 1 Fitness for Duty Program Performance Data for 2015Fitness for Duty
CAC:MF077223 February 2016
ULNRC-06282, Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)23 February 2016Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)FLEX
ULNRC-06283, Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)23 February 2016Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)Spent Fuel Pool Instrumentation
ML16054A83723 February 2016Sixth Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events.Safe Shutdown
Boric Acid
Shutdown Margin
Time to boil
Safe Shutdown Earthquake
FLEX
Earthquake
IR 05000483/201500411 February 2016NRC Integrated Inspection Report 05000483/2015004Safe Shutdown
Boric Acid
High winds
High Radiation Area
Ultimate heat sink
Internal Flooding
Emergency Lighting
Functionality Assessment
Locked High Radiation Area
Condition Adverse to Quality
Significance Determination Process
Pressure and Temperature Limits Report
Operability Determination
Fuel cladding
Fire Protection Program
Downpower
Unidentified leakage
TAC:MF71497 February 2016
ML16013A4567 February 2016Response Regarding Phase 2 Staffing Submittals Associated with Near-Term Task Force Recommendation 9.3 Related to the Fukushima Dai-Ichi Nuclear Power PlantFukushima Dai-Ichi
Minimum staff
ML16034A1573 February 2016Annual Fatigue Report Form for 2015
ML15324A1142 February 2016Issuance of Amendment No. 215, Adopt Technical Specification Task Force (TSTF) Traveler TSTF-510, Revision 2, Revision to Steam Generator Program Inspection Frequencies and Tube Sample SelectionShutdown Margin
High Radiation Area
Offsite Dose Calculation Manual
Post Accident Monitoring
Hydrostatic
Nondestructive Examination
Pressure and Temperature Limits Report
Surveillance Frequency Control Program
Annual Radiological Environmental Operating Report
Process Control Program
CAC:MF561329 January 2016
ML16027A15829 January 2016Relief Request I4R-02 from Requirements of ASME Code Section XI, Table IWF-2500-1 for 100% Visual Examination of Class 1 Supports, Fourth 10-Year Inservice Inspection IntervalIncorporated by reference
CAC:MF618028 January 2016
ML15328A05928 January 2016Issuance of Amendment No. 214, Request to Revise Operating License Condition Related to Cyber Security Plan Milestone 8 Full Implementation DateCyber Security
05000483/LER-2015-00321 January 2016Reactor Trip Caused by Transmission Line Fault
LER 15-003-01 for Callaway, Unit 1, Regarding Reactor Trip Caused by Transmission Line Fault
IR 05000483/201500913 January 2016IR 05000483/2015009, September 21, 2015 Through December 9, 2015, Callaway Plant - Special ReportStroke time
Condition Adverse to Quality
Significance Determination Process
Operability Determination
Operability Assessment
ULNRC-06275, Response to Request for Additional Information (RA) Related to Operating Quality Assurance Manual (Oqam), Revision 31, Oqam Change Notice 15-00212 January 2016Response to Request for Additional Information (RA) Related to Operating Quality Assurance Manual (Oqam), Revision 31, Oqam Change Notice 15-002Commercial Grade Dedication
IR 05000483/20155016 January 2016NRC Emergency Preparedness Annual Inspection Report 05000483/2015501