Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
DCL-14-123, Radiation Release Response to NRC Request for Additional Information- National Fire Protection Association Standard 805 | 31 December 2014 | Radiation Release Response to NRC Request for Additional Information- National Fire Protection Association Standard 805 | |
ML16048A212 | 31 December 2014 | Hazardous Waste Volume Trends 1994-2014 | |
Press Release-IV-14-027, NRC Schedules Regulatory Conference to Discuss Apparent Violation at Diablo Canyon Nuclear Power Plant | 30 December 2014 | Press Release-IV-14-027: NRC Schedules Regulatory Conference to Discuss Apparent Violation at Diablo Canyon Nuclear Power Plant | |
ML14363A554 | 29 December 2014 | Regulatory Conference with Diablo Canyon Nuclear Power Plant | |
DCL-14-121, Cancellation of Licensee Event Report 1-2014-001 | 29 December 2014 | Cancellation of Licensee Event Report 1-2014-001 | Hydrostatic |
ML15014A504 | 29 December 2014 | 14-1213(D.C.Cir.)PG&E Response to Motion to Dismiss | Unanalyzed Condition Safe Shutdown Earthquake Enforcement Discretion Probabilistic Risk Assessment Operating Basis Earthquake Functionality Assessment Fukushima Dai-Ichi Operability Determination Non-Concurrence Process Earthquake Backfit Operability Assessment |
TAC:MF4476 | 23 December 2014 | ||
ML14351A047 | 23 December 2014 | Request for Additional Information, Relief Request REP-SI, Alternative for Repair/Replacement Activities for Certain Safety Injection Pump Welded Attachments, Remaining Useful Life +20 Years | Through-Wall Leak |
TAC:MF5315 | 22 December 2014 | ||
ML14364A012 | 22 December 2014 | Comment (00011) of Anonymous Individual on Southern California Edison Company; San Onofre Nuclear Generating Station, Units 2 and 3; Post-Shutdown Decommissioning Activities Report | Earthquake |
ML14364A261 | 22 December 2014 | 10 CFR 54.21(b) Annual Update to the Diablo Canyon Power Plant License Renewal Application (Lra), Amendment 48 and LRA Appendix E, Applicant'S Environmental Report -Operating License Renewal Stage, Amendment 1 | License Renewal |
ML14364A265 | 22 December 2014 | License Renewal Application Appendix E Applicant'S Environmental Report - Operating License Renewal Stage Amendment 1. Part 1 of 4 | Annual Radiological Environmental Operating Report License Renewal Environmental Justice Fatality |
DCL-14-103, License Renewal Application Appendix E Applicant'S Environmental Report - Operating License Renewal Stage Amendment 1. Part 4 of 4 | 22 December 2014 | License Renewal Application Appendix E Applicant'S Environmental Report - Operating License Renewal Stage Amendment 1. Part 4 of 4 | License Renewal Earthquake Environmental Justice Exclusive Use |
DCL-14-118, Supplement to Response to NRC Request for Additional Information Regarding Response to NRC Bulletin 2012-01 | 22 December 2014 | Supplement to Response to NRC Request for Additional Information Regarding Response to NRC Bulletin 2012-01 | Open Phase Condition |
ML14350A271 | 22 December 2014 | Summary of 12/11/14 Preapplication Meeting with Pacific Gas and Electric Company to Discuss License Amendment Request to Support Installation of 500 Kilovolt Output Generator Breakers at Diablo Canyon, Units 1 and 2 | |
ML14364A266 | 22 December 2014 | License Renewal Application Appendix E Applicant'S Environmental Report - Operating License Renewal Stage Amendment 1. Part 2 of 4 | Earthquake Environmental Justice |
ML14364A269 | 22 December 2014 | License Renewal Application Appendix E Applicant'S Environmental Report - Operating License Renewal Stage Amendment 1. Part 3 of 4 | Boric Acid Grab sample Coatings Incorporated by reference Aging Management License Renewal Biofouling Environmental Justice |
ML14364A262 | 22 December 2014 | 10 CFR 54.21(b) Annual Update to the Diablo Canyon Power Plant License Renewal Application (Lra), Amendment 48. Part 1 of 2 | |
ML14364A264 | 22 December 2014 | 10 CFR 54.21(b) Annual Update to the Diablo Canyon Power Plant License Renewal Application (Lra), Amendment 48. Part 2 of 2 | |
ML14352A093 | 18 December 2014 | December 2014 Board Schedule Update | |
ML14352A017 | 17 December 2014 | NRR E-mail Capture - Diablo Canyon Power Plant, Unit 2 - Acceptance Review for ASME Section XI ISI Program Relief Request NDE-RCS-SE-2R19 | |
ML14330A311 | 15 December 2014 | Results of NRC Assessment of New Seismic Hazards Information Developed in Response to State of California Assembly Bill 1632 | |
IR 05000275/2014008 | 15 December 2014 | IR 05000275/2014008 and 05000323/2014008, September 10, 2014 Through November 13, 2014, Diablo Canyon, Focused Baseline | Unanalyzed Condition Functionality Assessment Significance Determination Process Operability Determination Earthquake |
ML14349A177 | 15 December 2014 | Hearing File Update December 2014 | |
TAC:MF4750 | 15 December 2014 | ||
ML14344A630 | 15 December 2014 | Close-out letter-California Facilities Preemption Safety Evaluation | Preemption Authority |
ML14346A439 | 12 December 2014 | LTR-14-0710 - Donna Gilmore, San Onofre Safety.Org Email Diablo, San Onofre and Holtec Canisters | |
ML15012A546 | 12 December 2014 | 14-1213(D.C.Cir.) Certified Index of Record (Filed) | |
ML16061A471 | 12 December 2014 | Revision 0 to 993754-12-854-1-NP, Protection Set Ii, Factory Acceptance Report | |
DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-14-854-1-NP, Protection Set Iv, Factory Acceptance Test Report | 12 December 2014 | Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-14-854-1-NP, Protection Set Iv, Factory Acceptance Test Report | |
ML14349A603 | 12 December 2014 | LTR-14-0713 - Joe Holtzman Email Diablo, San Onofre and Holtec Canisters | |
DCL-16-020, Revision 0 to 993754-13-854-1-NP, Protection Set III, Factory Acceptance Test Report | 12 December 2014 | Revision 0 to 993754-13-854-1-NP, Protection Set III, Factory Acceptance Test Report | |
ML16061A475 | 12 December 2014 | Revision 0 to 993754-14-854-1-NP, Protection Set Iv, Factory Acceptance Test Report | |
DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-12-854-1-NP, Protection Set Ii, Factory Acceptance Report | 12 December 2014 | Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-12-854-1-NP, Protection Set Ii, Factory Acceptance Report | |
ML14227A347 | 11 December 2014 | Request for Permission to Use Copyrighted Graphics and Material | |
ML14345A330 | 11 December 2014 | Announcement of the Generic Fundamentals Section of the Written Operator Licensing Examinations for 2015 | Generic Fundamentals Examination |
ML14349A387 | 11 December 2014 | FOIA/PA-2014-0059 - Resp 2 - Final. Group C (Records Being Released in Part) | Ultimate heat sink Safe Shutdown Earthquake Probabilistic Risk Assessment Operating Basis Earthquake Cyber Security FLEX Fukushima Dai-Ichi Design basis earthquake Open House Earthquake Fire Protection Program |
ML15012A536 | 10 December 2014 | 14-1213(D.C.Cir.)Respondents Motion to Dismiss (Filed) | Safe Shutdown Unanalyzed Condition Safe Shutdown Earthquake Probabilistic Risk Assessment Operating Basis Earthquake Functionality Assessment Fukushima Dai-Ichi Design basis earthquake Operability Determination Non-Concurrence Process Exemption Request Earthquake Operability Assessment Affidavit |
ML14029A450 | 10 December 2014 | Summary of 12/18/13 Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 | Cyber Security Earthquake |
ML14307B707 | 10 December 2014 | Supplemental Information Related to Development of Seismic Risk Evaluations for Information Request Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-T | Probabilistic Risk Assessment Fukushima Dai-Ichi |
ML14343A533 | 9 December 2014 | LTR-14-0393-1 - Jack Wada Ltr. Shutdown of the Diablo Canyon Power Plant | |
DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 9 to 993754-1-915-NP, Safety Analysis | 9 December 2014 | Diablo Canyon, Units 1 and 2 - Revision 9 to 993754-1-915-NP, Safety Analysis | Safe Shutdown |
ML16061A460 | 9 December 2014 | Revision 9 to 993754-1-915-NP, Safety Analysis | Safe Shutdown |
ML14343A987 | 9 December 2014 | December 2014 Seismic Study Update Letter | |
TAC:MF4499 | 9 December 2014 | ||
ML14339A629 | 5 December 2014 | NRR E-mail Capture - Target Date for Response to the RAI Re. Proposed Amendment Using TSTF-505, Rev. 1 | |
ML14338A317 | 4 December 2014 | Notice and Order (Scheduling Oral Argument), in the Matter of Diablo Canyon, Units 1 and 2 | |
DCL-14-111, American Society of Mechanical Engineers Section Xl Lnservice Inspection Program Relief Request NDE-RCS-SE-2R19 - Use of Alternate Sizing Qualification Criteria Through a Protective Clad Layer | 2 December 2014 | American Society of Mechanical Engineers Section Xl Lnservice Inspection Program Relief Request NDE-RCS-SE-2R19 - Use of Alternate Sizing Qualification Criteria Through a Protective Clad Layer | Dissimilar Metal Weld |
ML16061A469 | 1 December 2014 | Revision 0 to 993754-13-818-NP, Protection Set Ii, System Time Response Confirmation Report | |
ML16061A473 | 1 December 2014 | Revision 0 to 993754-14-818-NP, Protection Set Iv, System Time Response Confirmation Report |