10 CFR 54.21(b) Annual Update to the Diablo Canyon Power Plant License Renewal Application (Lra), Amendment 48 and LRA Appendix E, Applicant'S Environmental Report -Operating License Renewal Stage, Amendment 1
ML14364A261
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 12/22/2014
From: Halpin E D
Pacific Gas & Electric Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML14364A259 List:
References
DCL-14-103, FOIA/PA-2016-0438
Download: ML14364A261 (2)


Text

Pacific Gas and Electric Company*Edward D. Halpin Diablo Canyon Power Plant Senior Vice President Mail Code 104/6 Nuclear Generation

& Chief Nuclear Officer P. 0. Box 56 Avila Beach, CA 93424 805.545.4100 December 22, 2014 E-Mail: E1H8@pge.corn PG&E Letter DCL-14-103 U.S. Nuclear Regulatory Commission 10 CFR 54.21(b)ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 10 CFR 54.21(b) Annual Update to the Diablo Canyon Power Plant License Renewal Application (LRA), Amendment 48 and LRA Appendix E, Applicant's Environmental Report -Operating License Renewal Stage, Amendment 1 Dear Commissioners and Staff: By PG&E Letter DCL-07-079, "License Renewal Application," dated November 23, 2009, Pacific Gas and Electric Company (PG&E) submitted an application to the U.S. Nuclear Regulatory Commission (NRC) for the renewal of Facility Operating Licenses DPR-80 and DPR-82, for Diablo Canyon Power Plant (DCPP) Units 1 and 2, respectively.

The application included the license renewal application (LRA) and LRA Appendix E, "Applicant's Environmental Report -Operating License Renewal Stage." As required by 10 CFR 54.21(b), each year following submittal of the LRA, an update to the LRA must be submitted that identifies any change to the current licensing basis that materially affects the contents of the LRA, including the Final Safety Analysis Report Supplement.

This 10 CFR 54.21(b) update covers the period from October 1, 2013, through September 30, 2014, and provides information necessary to complete the NRC safety review as requested in NRC letter, "Summary of June 5, 2014, Conference Call to Discuss the Status of the License Renewal Application Review of the Diablo Canyon Nuclear Power Plant, Units 1 and 2," dated July 3, 2014.Enclosure 1 identifies DCPP LRA changes that are being made pursuant to 10 CFR 54.21(b), the subject of the change, and a reference to the attachment where further bases and applicable LRA mark-ups may be found. Enclosure 1 addressed the draft LR-ISG-2013-01.

The final LR-ISG-2013-01 was issued on November 14, 2014. PG&E will evaluate and submit an updated response to LR-ISG-2013-01, which is currently scheduled for February 2015.A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Catlaway .Comanche Peak

  • Diablo Canyon -Palo Verde -Wolf Creek Document Control Desk PG&E Letter DCL-14-103 December 22, 2014 Page 2 Enclosure 2 provides a list of updated LRA Appendix E sections, tables, figures, and attachments followed by Amendment I to LRA Appendix E. LRA Appendix E, Chapter 7, "Alternatives to the Proposed Action," Chapter 8, "Comparison of Environmental Impacts of License Renewal With the Alternatives," Section 9.2,"Alternatives," and Attachment F, "Severe Accident Mitigation Alternatives," are currently scheduled to be submitted to the NRC by February 2015. PG&E is in the process of addressing Coastal Consistency Certification comments on the original Coastal Consistency Certification (Attachment E). A schedule for potential coastal consistency review will be established and provided when available.

PG&E makes new regulatory commitments and changes to existing commitments (as defined by NEI 99-04) in this letter. New and revised commitments are contained in LRA Table A4-1.If you have any questions regarding this response, please contact Mr. Terence L. Grebel, License Renewal Project Manager, at (805) 458-0534.I declare under penalty of perjury that the foregoing is true and correct.Executed on December 22, 2014.Sincerely, Edward D. Halpin Senior Vice President Nuclear Generation and Chief Nuclear Officer gwh/50593843 Enclosures cc: Diablo Distribution cc/enc: Marc L. Dapas, NRC Region IV Administrator Thomas R. Hipschman, NRC, Senior Resident Inspector Elaine M. Keegan, NRC/NRR Siva P. Lingam, NRC Project Manager Richard A. Plasse, NRC Project Manager, License Renewal A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway