Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
CNL-13-144, Third Quarterly Status Report to the Flooding Hazard Reevaluation Report Extension Request31 December 2013Third Quarterly Status Report to the Flooding Hazard Reevaluation Report Extension RequestFukushima Dai-Ichi
CNL-13-137, Third Progress Update on Improved Flood Mitigation System Project31 December 2013Third Progress Update on Improved Flood Mitigation System Project
CNL-13-122, Service List Update for Documents Containing Official Use Only and Safeguards Information24 December 2013Service List Update for Documents Containing Official Use Only and Safeguards Information
CNL-13-143, TVA Submittal of Revisions to Central Emergency Control Center - Emergency Plan Implementing Procedures24 December 2013TVA Submittal of Revisions to Central Emergency Control Center - Emergency Plan Implementing Procedures
CNL-13-145, TVA Submittal of Revisions to Central Emergency Control Center Emergency Plan Implementing Procedures24 December 2013TVA Submittal of Revisions to Central Emergency Control Center Emergency Plan Implementing Procedures
CNL-13-121, Service List Update for Routine Information24 December 2013Service List Update for Routine Information
CNL-13-146, Submittal of Central Emergency Control Center - Emergency Plan Implementing Procedure Revision24 December 2013Submittal of Central Emergency Control Center - Emergency Plan Implementing Procedure Revision
CNL-13-135, Application to Update Watts Bar Unit 1 License Condition 2.F to Allow Two-Unit Operation (WBN-TS-13-18)20 December 2013Application to Update Watts Bar Unit 1 License Condition 2.F to Allow Two-Unit Operation (WBN-TS-13-18)Hot Short
Safe Shutdown
Boric Acid
Shutdown Margin
High Radiation Area
Ultimate heat sink
Fire Barrier
Safe Shutdown Earthquake
Enforcement Discretion
Operating Basis Earthquake
Operator Manual Action
Zebra Mussel
Multiple Spurious Operation
Emergency Lighting
Incorporated by reference
Thermoset
B.5.b Mitigating Strategies
Earthquake
Accidental discharge
Continuous fire watch
Fire Protection Program
Fire Watch
Hourly Fire Watch
ML13343A03620 December 2013Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies)Safe Shutdown
Boric Acid
High winds
Shutdown Margin
Ultimate heat sink
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Operating Basis Earthquake
Emergency Lighting
FLEX
Fukushima Dai-Ichi
Frazil ice
Earthquake
ML13352A43319 December 2013Notice of Meeting with Tennessee Valley Authority Regarding Status of Construction and Licensing of Watts Bar Nuclear Plant, Unit 2
IR 05000390/201360918 December 2013IR 05000391-13-609, on 11/16/2013, Watts Bar Nuclaer Plant, Unit 2 Construction - NRC Integrated InspectionSafe Shutdown
Fire Barrier
Hydrostatic
Coatings
Nondestructive Examination
Battery sizing
Hemyc
Liquid penetrant
IR 05000391/201360918 December 2013IR 05000391-13-609, on 11/16/2013, Watts Bar Nuclaer Plant, Unit 2 Construction - NRC Integrated InspectionSafe Shutdown
Fire Barrier
Hydrostatic
Coatings
Nondestructive Examination
Battery sizing
Hemyc
Liquid penetrant
CNL-13-147, Supplemental Response to NRC Health Physics & Human Performance Branch Request for Additional Information Related to License Amendment Request for Watts Bar Unit 1, Updated Final Safety Analysis Report Changes Associated with Hydrologic A18 December 2013Supplemental Response to NRC Health Physics & Human Performance Branch Request for Additional Information Related to License Amendment Request for Watts Bar Unit 1, Updated Final Safety Analysis Report Changes Associated with Hydrologic Ana
ML13360A21017 December 2013Revision of Commitment for Inspection and Repair of Kapton Insulated Pigtails within Electrical Containment Penetrations
CNL-13-140, Submittal of Central Emergency Control Center - Emergency Plan Implementing Procedure Revision13 December 2013Submittal of Central Emergency Control Center - Emergency Plan Implementing Procedure Revision
IR 05000390/201340313 December 2013IR 05000390-13-403, on 11/07/2013, Watts Bar Nuclear Plant, NRC Security InspectionAffidavit
ML13357A05112 December 2013Synopsis of Revisions Included in Watts Bar Unit 2 Developmental Revision H of Technical Specifications and Technical Specification Bases. Part 2 of 2Safe Shutdown
Anticipated operational occurrence
Battery sizing
Fuel cladding
ML13357A05312 December 2013Technical SpecificationsTime of Discovery
Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Ultimate heat sink
Grab sample
Offsite Dose Calculation Manual
Post Accident Monitoring
Hydrostatic
Nondestructive Examination
Pressure and Temperature Limits Report
Annual Radiological Environmental Operating Report
Process Control Program
Pressure Boundary Leakage
Offsite Circuit
Fire Protection Program
Power change
Unidentified leakage
ML13353A47812 December 2013Fuel Handling Accident Dose Analysis Final Safety Analysis Report and Technical Specification RevisionSafe Shutdown Earthquake
CNL-13-149, Updated Inservice Test (IST) Program (Unit 1) and Ist/Preservice Test (Pst) Program12 December 2013Updated Inservice Test (IST) Program (Unit 1) and Ist/Preservice Test (Pst) ProgramSafe Shutdown
Unanalyzed Condition
Boric Acid
Stroke time
Incorporated by reference
Exemption Request
Power Operated Valves
Scaffolding
ML13357A04812 December 2013Submittal of Developmental Revision H of the Technical Specification and Technical Specification Bases
ML13357A05412 December 2013Technical Specifications Bases
ML13357A05012 December 2013Synopsis of Revisions Included in Watts Bar Unit 2 Developmental Revision H of Technical Specifications and Technical Specification Bases. Part 1 of 2Reactor Vessel Water Level
Offsite Dose Calculation Manual
Post Accident Monitoring
Annual Radiological Environmental Operating Report
Power change
IR 05000390/201330211 December 2013Er 05000390-13-302; Operating Test, October 22 - 25, 2013, & Written Examination, October 30, 2013; Watts Bar Nuclear Power Plant; Operator License Examinations
CNL-13-134, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A5 December 2013Nuclear Quality Assurance Plan, TVA-NQA-PLN89-AFitness for Duty
Offsite Dose Calculation Manual
Safe Shutdown Earthquake
Coatings
Nondestructive Examination
B.5.b
Process Control Program
Fire Protection Program
Grace period
TAC:MF01922 December 2013
CNL-13-124, Tennessee Valley Authority - Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding the Watts Bar Nuclear Plant Seismic Walkdown Results of Recommendation 2.3 of the Near-Term Ta2 December 2013Tennessee Valley Authority - Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding the Watts Bar Nuclear Plant Seismic Walkdown Results of Recommendation 2.3 of the Near-Term TaskFukushima Dai-Ichi
Design basis earthquake
Earthquake
Scaffolding
ML13338A17926 November 2013G20130843 - J. Sam Armijo Ltr Re Interim ACRS Review of Watts Bar Nuclear, Unit 2, Operating License ApplicationOperator Manual Action
Backfit
ML13338A68326 November 2013Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Watts Bar Nuclear Plant, Units 1 and 2, TAC MF0950 and MF1177Safe Shutdown
Boric Acid
High winds
Shutdown Margin
Ultimate heat sink
Safe Shutdown Earthquake
Internal Flooding
Operating Basis Earthquake
Emergency Lighting
FLEX
Tornado Generated Missile
Fukushima Dai-Ichi
Frazil ice
Earthquake
ML13333A26925 November 2013Submittal of Pre-Op Test InstructionBoric Acid
Stroke time
Temporary Modification
ML13326A73922 November 2013Transcript of the 609th ACRS Meeting, November 7, 2013 (Open) Pages 1-174Safe Shutdown
Fire Barrier
Post Accident Monitoring
Hydrostatic
Operator Manual Action
Cyber Security
Multiple Spurious Operation
Emergency Lighting
FLEX
Spent Fuel Pool Instrumentation
Generic Issues Program
Fire Protection Program
Backfit
TAC:MF233722 November 2013
TAC:MF316222 November 2013
CNL-13-119, Revision to Watts Bar Nuclear Plant, Unit 1, Reactor Vessel Surveillance Capsule Withdrawal Schedule22 November 2013Revision to Watts Bar Nuclear Plant, Unit 1, Reactor Vessel Surveillance Capsule Withdrawal Schedule
CNL-13-125, Response to NRC Request for Additional Information Related to Overall Integrated Plan in Response to the Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)22 November 2013Response to NRC Request for Additional Information Related to Overall Integrated Plan in Response to the Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) (Safe Shutdown Earthquake
Operating Basis Earthquake
FLEX
Design basis earthquake
Spent Fuel Pool Instrumentation
Earthquake
CNL-13-116, Response to NRC Request for Additional Information Related to 2012 Steam Generator Inspection Report22 November 2013Response to NRC Request for Additional Information Related to 2012 Steam Generator Inspection Report
Press Release-13-099, NRC Extends Construction Permit for Watts Bar Unit 222 November 2013Press Release-13-099: NRC Extends Construction Permit for Watts Bar Unit 2
ML13326A09221 November 2013Order for Extension of Construction PermitExemption Request
ML13312A90714 November 2013Branch Chief Reassignment for Plant Licensing Branch II-2
ML13319B20614 November 2013Differences and Training Plan Report, September 2013
ML13312A90814 November 2013Bellefonte Nuclear Plant, Units 1 and 2; Watts Bar Nuclear Plant, Unit 2, Branch Chief Reassignment for Plant Licensing Branch II-2
ML13312A4198 November 2013302 Final RO Written ExamShutdown Margin
Ultimate heat sink
Stroke time
Power change
ML13312A4538 November 2013302 Post Exam Comments
ML13312A0828 November 2013Construction Operational Preparedness Inspection PlanSafe Shutdown
Offsite Dose Calculation Manual
Operator Manual Action
Temporary Modification
Multiple Spurious Operation
Emergency Lighting
Fire Protection Program
ML13312A4258 November 2013302 Final SRO Written ExamSafe Shutdown
Unanalyzed Condition
Time of Discovery
Stroke time
Contraband
Severe Accident Management Guideline
Offsite Circuit
Power change
IR 05000391/20136088 November 2013IR 05000391-13-608, on 08/18/2013 - 09/28/2013, Watts Bar Nuclear Plant, Unit 2, NRC Integrated Inspection ReportSafe Shutdown
Nondestructive Examination
Liquid penetrant
Fire Watch
Scaffolding
IR 05000390/20136088 November 2013IR 05000391-13-608, on 08/18/2013 - 09/28/2013, Watts Bar Nuclear Plant, Unit 2, NRC Integrated Inspection ReportSafe Shutdown
Non-Destructive Examination
Hydrostatic
Nondestructive Examination
Multiple Spurious Operation
Liquid penetrant
Fire Protection Program
Fire Watch
Scaffolding
CNL-13-110, Central Emergency Control Center - Revision 20 to Emergency Plan Implementing Procedure Revision CECC EPIP-19, Post Accident Fuel Damage Assessment8 November 2013Central Emergency Control Center - Revision 20 to Emergency Plan Implementing Procedure Revision CECC EPIP-19, Post Accident Fuel Damage Assessment
IR 05000390/20135037 November 2013IR 05000390-13-503; 10/28/2013 - 11/01/2013; Watts Bar Nuclear Plant, Unit 1; Exercise Evaluation and Baseline Inspection
IR 05000390/20130086 November 2013IR 05000390-13-008, on 09/09-13/2013 and 09/23-27/2013; Watts Bar Nuclear Plant, Unit 1, Fire Protection (Triennial); and Unit 2, Fire Construction Deficiency Reports Inspection (Report No. 05000391/2013615)Hot Short
Safe Shutdown
Fire Barrier
Operator Manual Action
Multiple Spurious Operation
Emergency Lighting
B.5.b
Significance Determination Process
Job Performance Measure
Time Critical Operator Action
Hemyc
Fire Protection Program
Fire Watch