CNL-13-144, Third Quarterly Status Report to the Flooding Hazard Reevaluation Report Extension Request | 31 December 2013 | Third Quarterly Status Report to the Flooding Hazard Reevaluation Report Extension Request | Fukushima Dai-Ichi |
CNL-13-137, Third Progress Update on Improved Flood Mitigation System Project | 31 December 2013 | Third Progress Update on Improved Flood Mitigation System Project | |
CNL-13-122, Service List Update for Documents Containing Official Use Only and Safeguards Information | 24 December 2013 | Service List Update for Documents Containing Official Use Only and Safeguards Information | |
CNL-13-143, TVA Submittal of Revisions to Central Emergency Control Center - Emergency Plan Implementing Procedures | 24 December 2013 | TVA Submittal of Revisions to Central Emergency Control Center - Emergency Plan Implementing Procedures | |
CNL-13-145, TVA Submittal of Revisions to Central Emergency Control Center Emergency Plan Implementing Procedures | 24 December 2013 | TVA Submittal of Revisions to Central Emergency Control Center Emergency Plan Implementing Procedures | |
CNL-13-121, Service List Update for Routine Information | 24 December 2013 | Service List Update for Routine Information | |
CNL-13-146, Submittal of Central Emergency Control Center - Emergency Plan Implementing Procedure Revision | 24 December 2013 | Submittal of Central Emergency Control Center - Emergency Plan Implementing Procedure Revision | |
CNL-13-135, Application to Update Watts Bar Unit 1 License Condition 2.F to Allow Two-Unit Operation (WBN-TS-13-18) | 20 December 2013 | Application to Update Watts Bar Unit 1 License Condition 2.F to Allow Two-Unit Operation (WBN-TS-13-18) | Hot Short Safe Shutdown Boric Acid Shutdown Margin High Radiation Area Ultimate heat sink Fire Barrier Safe Shutdown Earthquake Enforcement Discretion Operating Basis Earthquake Operator Manual Action Zebra Mussel Multiple Spurious Operation Emergency Lighting Incorporated by reference Thermoset B.5.b Mitigating Strategies Earthquake Accidental discharge Continuous fire watch Fire Protection Program Fire Watch Hourly Fire Watch |
ML13343A036 | 20 December 2013 | Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) | Safe Shutdown Boric Acid High winds Shutdown Margin Ultimate heat sink Tornado Missile Safe Shutdown Earthquake Internal Flooding Operating Basis Earthquake Emergency Lighting FLEX Fukushima Dai-Ichi Frazil ice Earthquake |
ML13352A433 | 19 December 2013 | Notice of Meeting with Tennessee Valley Authority Regarding Status of Construction and Licensing of Watts Bar Nuclear Plant, Unit 2 | |
IR 05000390/2013609 | 18 December 2013 | IR 05000391-13-609, on 11/16/2013, Watts Bar Nuclaer Plant, Unit 2 Construction - NRC Integrated Inspection | Safe Shutdown Fire Barrier Hydrostatic Coatings Nondestructive Examination Battery sizing Hemyc Liquid penetrant |
IR 05000391/2013609 | 18 December 2013 | IR 05000391-13-609, on 11/16/2013, Watts Bar Nuclaer Plant, Unit 2 Construction - NRC Integrated Inspection | Safe Shutdown Fire Barrier Hydrostatic Coatings Nondestructive Examination Battery sizing Hemyc Liquid penetrant |
CNL-13-147, Supplemental Response to NRC Health Physics & Human Performance Branch Request for Additional Information Related to License Amendment Request for Watts Bar Unit 1, Updated Final Safety Analysis Report Changes Associated with Hydrologic A | 18 December 2013 | Supplemental Response to NRC Health Physics & Human Performance Branch Request for Additional Information Related to License Amendment Request for Watts Bar Unit 1, Updated Final Safety Analysis Report Changes Associated with Hydrologic Ana | |
ML13360A210 | 17 December 2013 | Revision of Commitment for Inspection and Repair of Kapton Insulated Pigtails within Electrical Containment Penetrations | |
CNL-13-140, Submittal of Central Emergency Control Center - Emergency Plan Implementing Procedure Revision | 13 December 2013 | Submittal of Central Emergency Control Center - Emergency Plan Implementing Procedure Revision | |
IR 05000390/2013403 | 13 December 2013 | IR 05000390-13-403, on 11/07/2013, Watts Bar Nuclear Plant, NRC Security Inspection | Affidavit |
ML13357A051 | 12 December 2013 | Synopsis of Revisions Included in Watts Bar Unit 2 Developmental Revision H of Technical Specifications and Technical Specification Bases. Part 2 of 2 | Safe Shutdown Anticipated operational occurrence Battery sizing Fuel cladding |
ML13357A053 | 12 December 2013 | Technical Specifications | Time of Discovery Shutdown Margin Reactor Vessel Water Level High Radiation Area Ultimate heat sink Grab sample Offsite Dose Calculation Manual Post Accident Monitoring Hydrostatic Nondestructive Examination Pressure and Temperature Limits Report Annual Radiological Environmental Operating Report Process Control Program Pressure Boundary Leakage Offsite Circuit Fire Protection Program Power change Unidentified leakage |
ML13353A478 | 12 December 2013 | Fuel Handling Accident Dose Analysis Final Safety Analysis Report and Technical Specification Revision | Safe Shutdown Earthquake |
CNL-13-149, Updated Inservice Test (IST) Program (Unit 1) and Ist/Preservice Test (Pst) Program | 12 December 2013 | Updated Inservice Test (IST) Program (Unit 1) and Ist/Preservice Test (Pst) Program | Safe Shutdown Unanalyzed Condition Boric Acid Stroke time Incorporated by reference Exemption Request Power Operated Valves Scaffolding |
ML13357A048 | 12 December 2013 | Submittal of Developmental Revision H of the Technical Specification and Technical Specification Bases | |
ML13357A054 | 12 December 2013 | Technical Specifications Bases | |
ML13357A050 | 12 December 2013 | Synopsis of Revisions Included in Watts Bar Unit 2 Developmental Revision H of Technical Specifications and Technical Specification Bases. Part 1 of 2 | Reactor Vessel Water Level Offsite Dose Calculation Manual Post Accident Monitoring Annual Radiological Environmental Operating Report Power change |
IR 05000390/2013302 | 11 December 2013 | Er 05000390-13-302; Operating Test, October 22 - 25, 2013, & Written Examination, October 30, 2013; Watts Bar Nuclear Power Plant; Operator License Examinations | |
CNL-13-134, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A | 5 December 2013 | Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A | Fitness for Duty Offsite Dose Calculation Manual Safe Shutdown Earthquake Coatings Nondestructive Examination B.5.b Process Control Program Fire Protection Program Grace period |
TAC:MF0192 | 2 December 2013 | | |
CNL-13-124, Tennessee Valley Authority - Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding the Watts Bar Nuclear Plant Seismic Walkdown Results of Recommendation 2.3 of the Near-Term Ta | 2 December 2013 | Tennessee Valley Authority - Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding the Watts Bar Nuclear Plant Seismic Walkdown Results of Recommendation 2.3 of the Near-Term Task | Fukushima Dai-Ichi Design basis earthquake Earthquake Scaffolding |
ML13338A179 | 26 November 2013 | G20130843 - J. Sam Armijo Ltr Re Interim ACRS Review of Watts Bar Nuclear, Unit 2, Operating License Application | Operator Manual Action Backfit |
ML13338A683 | 26 November 2013 | Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Watts Bar Nuclear Plant, Units 1 and 2, TAC MF0950 and MF1177 | Safe Shutdown Boric Acid High winds Shutdown Margin Ultimate heat sink Safe Shutdown Earthquake Internal Flooding Operating Basis Earthquake Emergency Lighting FLEX Tornado Generated Missile Fukushima Dai-Ichi Frazil ice Earthquake |
ML13333A269 | 25 November 2013 | Submittal of Pre-Op Test Instruction | Boric Acid Stroke time Temporary Modification |
ML13326A739 | 22 November 2013 | Transcript of the 609th ACRS Meeting, November 7, 2013 (Open) Pages 1-174 | Safe Shutdown Fire Barrier Post Accident Monitoring Hydrostatic Operator Manual Action Cyber Security Multiple Spurious Operation Emergency Lighting FLEX Spent Fuel Pool Instrumentation Generic Issues Program Fire Protection Program Backfit |
TAC:MF2337 | 22 November 2013 | | |
TAC:MF3162 | 22 November 2013 | | |
CNL-13-119, Revision to Watts Bar Nuclear Plant, Unit 1, Reactor Vessel Surveillance Capsule Withdrawal Schedule | 22 November 2013 | Revision to Watts Bar Nuclear Plant, Unit 1, Reactor Vessel Surveillance Capsule Withdrawal Schedule | |
CNL-13-125, Response to NRC Request for Additional Information Related to Overall Integrated Plan in Response to the Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) | 22 November 2013 | Response to NRC Request for Additional Information Related to Overall Integrated Plan in Response to the Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) ( | Safe Shutdown Earthquake Operating Basis Earthquake FLEX Design basis earthquake Spent Fuel Pool Instrumentation Earthquake |
CNL-13-116, Response to NRC Request for Additional Information Related to 2012 Steam Generator Inspection Report | 22 November 2013 | Response to NRC Request for Additional Information Related to 2012 Steam Generator Inspection Report | |
Press Release-13-099, NRC Extends Construction Permit for Watts Bar Unit 2 | 22 November 2013 | Press Release-13-099: NRC Extends Construction Permit for Watts Bar Unit 2 | |
ML13326A092 | 21 November 2013 | Order for Extension of Construction Permit | Exemption Request |
ML13312A907 | 14 November 2013 | Branch Chief Reassignment for Plant Licensing Branch II-2 | |
ML13319B206 | 14 November 2013 | Differences and Training Plan Report, September 2013 | |
ML13312A908 | 14 November 2013 | Bellefonte Nuclear Plant, Units 1 and 2; Watts Bar Nuclear Plant, Unit 2, Branch Chief Reassignment for Plant Licensing Branch II-2 | |
ML13312A419 | 8 November 2013 | 302 Final RO Written Exam | Shutdown Margin Ultimate heat sink Stroke time Power change |
ML13312A453 | 8 November 2013 | 302 Post Exam Comments | |
ML13312A082 | 8 November 2013 | Construction Operational Preparedness Inspection Plan | Safe Shutdown Offsite Dose Calculation Manual Operator Manual Action Temporary Modification Multiple Spurious Operation Emergency Lighting Fire Protection Program |
ML13312A425 | 8 November 2013 | 302 Final SRO Written Exam | Safe Shutdown Unanalyzed Condition Time of Discovery Stroke time Contraband Severe Accident Management Guideline Offsite Circuit Power change |
IR 05000391/2013608 | 8 November 2013 | IR 05000391-13-608, on 08/18/2013 - 09/28/2013, Watts Bar Nuclear Plant, Unit 2, NRC Integrated Inspection Report | Safe Shutdown Nondestructive Examination Liquid penetrant Fire Watch Scaffolding |
IR 05000390/2013608 | 8 November 2013 | IR 05000391-13-608, on 08/18/2013 - 09/28/2013, Watts Bar Nuclear Plant, Unit 2, NRC Integrated Inspection Report | Safe Shutdown Non-Destructive Examination Hydrostatic Nondestructive Examination Multiple Spurious Operation Liquid penetrant Fire Protection Program Fire Watch Scaffolding |
CNL-13-110, Central Emergency Control Center - Revision 20 to Emergency Plan Implementing Procedure Revision CECC EPIP-19, Post Accident Fuel Damage Assessment | 8 November 2013 | Central Emergency Control Center - Revision 20 to Emergency Plan Implementing Procedure Revision CECC EPIP-19, Post Accident Fuel Damage Assessment | |
IR 05000390/2013503 | 7 November 2013 | IR 05000390-13-503; 10/28/2013 - 11/01/2013; Watts Bar Nuclear Plant, Unit 1; Exercise Evaluation and Baseline Inspection | |
IR 05000390/2013008 | 6 November 2013 | IR 05000390-13-008, on 09/09-13/2013 and 09/23-27/2013; Watts Bar Nuclear Plant, Unit 1, Fire Protection (Triennial); and Unit 2, Fire Construction Deficiency Reports Inspection (Report No. 05000391/2013615) | Hot Short Safe Shutdown Fire Barrier Operator Manual Action Multiple Spurious Operation Emergency Lighting B.5.b Significance Determination Process Job Performance Measure Time Critical Operator Action Hemyc Fire Protection Program Fire Watch |