Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML13365A216 | 31 December 2013 | Closure of Investigation (OI-4-2013-019) | |
W3F1-2013-0072, Reply to a Notice of Violation: EA-12-257 | 18 December 2013 | Reply to a Notice of Violation: EA-12-257 | |
W3F1-2013-0048, Supplement to NFPA 805 License Amendment Request (LAR) | 18 December 2013 | Supplement to NFPA 805 License Amendment Request (LAR) | Hot Short Safe Shutdown Boric Acid Shutdown Margin Mission time Fire Barrier Probabilistic Risk Assessment Operator Manual Action Multiple Spurious Operation Emergency Lighting Thermoset Earthquake Fire Protection Program |
W3F1-2013-0074, Core Operating Limits Report - Cycle 19 Revision 2 | 18 December 2013 | Core Operating Limits Report - Cycle 19 Revision 2 | Shutdown Margin Coatings |
ML13351A102 | 17 December 2013 | Notification of Generic Fundamentals Examinations for 2014 | Generic Fundamentals Examination |
W3F1-2013-0070, Submittal of Reactor Vessel Internals Aging Management Program Consistent with MRP-227-A | 16 December 2013 | Submittal of Reactor Vessel Internals Aging Management Program Consistent with MRP-227-A | Nondestructive Examination Functionality Assessment Aging Management EVT-1 Flow Induced Vibration |
W3F1-2013-0035, License Amendment Request to Address Multiple Administrative Issues with the Technical Specifications | 9 December 2013 | License Amendment Request to Address Multiple Administrative Issues with the Technical Specifications | Shutdown Margin High Radiation Area Grab sample Process Control Program |
TAC:MF3230 | 9 December 2013 | ||
IR 05000382/2013404 | 2 December 2013 | IR 05000382-13-404, 10/24/2013, Waterford Steam Electric Station, Unit 3 | Significance Determination Process Affidavit |
ML13333A532 | 27 November 2013 | NRR E-mail Capture - RAI Regarding W 3 Relief Request W3-ISI-022 | Through-Wall Leak |
W3F1-2013-0064, Supplemental Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Hazard Walkdowns Conducted to Verify Current Plant Compliance with the Current Licensing Basis (CLB) for Seismic Requirements | 27 November 2013 | Supplemental Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Hazard Walkdowns Conducted to Verify Current Plant Compliance with the Current Licensing Basis (CLB) for Seismic Requirements | |
ML13312A787 | 25 November 2013 | Interim Staff Evaluation and Request for Additional Information Regarding Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) | High Radiation Area Safe Shutdown Earthquake Finite Element Analysis FLEX Spent Fuel Pool Instrumentation Fire Protection Program |
ML13220A402 | 22 November 2013 | Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 - Mitigation Strategies | Safe Shutdown Boric Acid High winds Shutdown Margin Ultimate heat sink Tornado Missile Safe Shutdown Earthquake Internal Flooding Emergency Lighting FLEX Fukushima Dai-Ichi Frazil ice Battery sizing Earthquake |
ML13325B222 | 21 November 2013 | Notification of NRC Triennial Heat Sink Performance Inspection (Report Number 05000382/2014002) and Request for Information | Ultimate heat sink |
ML13317A969 | 20 November 2013 | Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Waterford Steam Electric Generating Station, Unit 3, TAC No.: MF0977 | Safe Shutdown Boric Acid High winds Shutdown Margin Ultimate heat sink Tornado Missile Safe Shutdown Earthquake Internal Flooding Emergency Lighting FLEX Fukushima Dai-Ichi Frazil ice Battery sizing Earthquake |
ML13324B133 | 20 November 2013 | IR 05000382-13-004; on 07/01/2013 - 09/30/2013; Waterford Steam Electric Station, Unit 3, Integrated Resident and Regional Report; Fire Protection, Post-Maintenance Testing, and Other Activities | Safe Shutdown Boric Acid High winds High Radiation Area Offsite Dose Calculation Manual Internal Flooding Enforcement Discretion Met Tower Temporary Modification Functionality Assessment Tornado-Generated Missile Significance Determination Process Job Performance Measure Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Large early release frequency Operability Determination Annual Radiological Effluent Release Report Fire Protection Program Fire Watch Substantial potential for overexposure Operability Assessment |
IR 05000382/2013004 | 20 November 2013 | IR 05000382-13-004; on 07/01/2013 - 09/30/2013; Waterford Steam Electric Station, Unit 3, Integrated Resident and Regional Report; Fire Protection, Post-Maintenance Testing, and Other Activities | Safe Shutdown Boric Acid High winds High Radiation Area Ultimate heat sink Offsite Dose Calculation Manual Internal Flooding Met Tower Temporary Modification Functionality Assessment Tornado-Generated Missile Significance Determination Process Job Performance Measure Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Large early release frequency Operability Determination Annual Radiological Effluent Release Report Fire Protection Program Fire Watch Substantial potential for overexposure Operability Assessment |
ML13304A736 | 15 November 2013 | Reassignment to the DORL Plant Licensing IV-2 and Decommissioning Transition Branch Effective 11/3/2013 | |
TAC:MF0296 | 11 November 2013 | ||
W3F1-2013-0043, Request for Review and Approval of Change to Updated Final Safety Analysis Report Clarifying Pressurizer Heaters Function for Natural Circulation at the Onset of a Loss of Offsite Power | 11 November 2013 | Request for Review and Approval of Change to Updated Final Safety Analysis Report Clarifying Pressurizer Heaters Function for Natural Circulation at the Onset of a Loss of Offsite Power | Boric Acid Emergency Lighting Time Critical Operator Action |
W3F1-2013-0059, Revised Flooding Walkdown Report - Entergy'S Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Da | 11 November 2013 | Revised Flooding Walkdown Report - Entergy'S Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi | High winds Hydrostatic Locked High Radiation Area Fukushima Dai-Ichi |
W3F1-2013-0058, Registration of Cask Use | 7 November 2013 | Registration of Cask Use | |
ML13311B381 | 7 November 2013 | Planned Modification of the Entergy Quality Assurance Program Manual (QAPM) | |
IR 05000382/2013403 | 5 November 2013 | IR 05000382-13-403, on 10/04/13, Waterford Steam Electric Station, Unit 3, NRC Security Inspection Report. Cover Letter Only | Affidavit |
ENOC-13-00029, Planned Modification of the Entergy Quality Assurance Program Manual (EA-11-096) | 4 November 2013 | Planned Modification of the Entergy Quality Assurance Program Manual (EA-11-096) | |
ML13304B418 | 1 November 2013 | Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns | |
W3F1-2013-0062, Commitment Change for UT Examination Frequency for the Pressurizer Safety/Relief Valves' Nozzle Weld Overlays | 31 October 2013 | Commitment Change for UT Examination Frequency for the Pressurizer Safety/Relief Valves' Nozzle Weld Overlays | Weld Overlay Dissimilar Metal Weld |
ML13295A563 | 22 October 2013 | NRR E-mail Capture - Acceptance Review Result for Waterford 3 Request for Relief, W3-ISI-022 | |
ML13282A308 | 9 October 2013 | Acceptance Review Email, Request for Alternative W3-ISI-023, ASME Code Case N-770-1 Successive Examinations, Third 10-Year Inservice Inspection Interval | Dissimilar Metal Weld |
ML13282A695 | 7 October 2013 | Notification of NRC Initial Operator Licensing Examination 05000382-14-301 | |
ML13127A257 | 1 October 2013 | 2012-10-Draft Outline Comments | |
ML13003A238 | 1 October 2013 | 2012-10-FINAL OP Test | Boric Acid Shutdown Margin High Radiation Area Met Tower Job Performance Measure Power change |
W3F1-2013-0055, Response to Request for Additional Information (RAI) for the Overall Integrated Plan (OIP) in Response to the Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool (SFP) Instrumentation | 26 September 2013 | Response to Request for Additional Information (RAI) for the Overall Integrated Plan (OIP) in Response to the Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool (SFP) Instrumentation | Safe Shutdown Earthquake Finite Element Analysis FLEX Spent Fuel Pool Instrumentation |
TAC:MF2815 | 26 September 2013 | ||
W3F1-2013-0044, Request for Alternative W3-ISI-023, ASME Code Case N-770-1 Successive Examinations | 26 September 2013 | Request for Alternative W3-ISI-023, ASME Code Case N-770-1 Successive Examinations | Dissimilar Metal Weld |
W3F1-2013-0053, Entergy'S Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near- Term Task Force Review of Insights from the Fukushima Dai-ichi Accident - 1.5 Year Response | 12 September 2013 | Entergy'S Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near- Term Task Force Review of Insights from the Fukushima Dai-ichi Accident - 1.5 Year Response for C | Fukushima Dai-Ichi Earthquake |
IR 05000382/2013406 | 10 September 2013 | IR 05000382-13-406, 8/5/2013, Waterford Steam Electric Station, Unit 3, Temporary Instruction 2515/186, Inspection of Procedures and Process for Responding to Potential Aircraft Threats. | Affidavit |
ML13263A290 | 10 September 2013 | Letter from Micheal R. Caster Forwarding Enclosed Standard Practice Procedures Plan'S for Waterford 3 Nuclear Power Station and Palisades Nuclear Plant | |
W3F1-2013-0054, CFR 71.95 Report on Issues Involving Radwaste Cask 8-120B | 9 September 2013 | CFR 71.95 Report on Issues Involving Radwaste Cask 8-120B | |
IR 05000382/2013006 | 3 September 2013 | Mid-Cycle Assessment Letter for Waterford Steam Electric Station, Unit 3 (Report 05000382-13-006) | |
Press Release-IV-13-026, NRC Will Hold an Open House on Waterford 3 Nuclear Plant Performance | 3 September 2013 | Press Release-IV-13-026: NRC Will Hold an Open House on Waterford 3 Nuclear Plant Performance | Open House |
ML13246A318 | 28 August 2013 | Request for Additional Information E-mail, Overall Integrated Plan in Response to 3/12/12 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) | Spent Fuel Pool Instrumentation |
W3F1-2013-0050, First Six Month Status Report for Implementation of Order EA-12-049, Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events | 28 August 2013 | First Six Month Status Report for Implementation of Order EA-12-049, Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events | FLEX |
W3F1-2013-0049, First Six Month Status Report for Implementation of Order EA-12-051, Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation | 28 August 2013 | First Six Month Status Report for Implementation of Order EA-12-051, Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation | Spent Fuel Pool Instrumentation |
ML13234A503 | 28 August 2013 | Nuclear Regulatory Commission Audits of Licensee Responses to Mitigation Strategies Order EA-12-049 | FLEX |
ML13239A233 | 27 August 2013 | Notice of Open House with Members of the Public, Waterford Steam Electric Station, Unit 3 | Open House |
TAC:MF2814 | 27 August 2013 | ||
W3F1-2013-0018, Request for Relief from American Society of Mechanical Engineers (ASME) Code, Section XI for the Third 10-year Interval - Inservice Inspection Request for Relief W3-ISI-022 | 27 August 2013 | Request for Relief from American Society of Mechanical Engineers (ASME) Code, Section XI for the Third 10-year Interval - Inservice Inspection Request for Relief W3-ISI-022 | Boric Acid VT-2 Foreign Material Exclusion |
W3F1-2013-0032, Core Operating Limits Report - Cycle 19 Revision 1 | 26 August 2013 | Core Operating Limits Report - Cycle 19 Revision 1 | Shutdown Margin Coatings |
ML13248A611 | 23 August 2013 | LTR-13-0720 - Peggy Hatch, Louisiana Department of Environmental Quality Ltr. Letter from the Union of Concerned Scientists Regarding the Compliance of the Waterford Nuclear Power Plant with Fire Safety Standards Promulgated by the NRC |