Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML13365A21631 December 2013Closure of Investigation (OI-4-2013-019)
W3F1-2013-0072, Reply to a Notice of Violation: EA-12-25718 December 2013Reply to a Notice of Violation: EA-12-257
W3F1-2013-0048, Supplement to NFPA 805 License Amendment Request (LAR)18 December 2013Supplement to NFPA 805 License Amendment Request (LAR)Hot Short
Safe Shutdown
Boric Acid
Shutdown Margin
Mission time
Fire Barrier
Probabilistic Risk Assessment
Operator Manual Action
Multiple Spurious Operation
Emergency Lighting
Thermoset
Earthquake
Fire Protection Program
W3F1-2013-0074, Core Operating Limits Report - Cycle 19 Revision 218 December 2013Core Operating Limits Report - Cycle 19 Revision 2Shutdown Margin
Coatings
ML13351A10217 December 2013Notification of Generic Fundamentals Examinations for 2014Generic Fundamentals Examination
W3F1-2013-0070, Submittal of Reactor Vessel Internals Aging Management Program Consistent with MRP-227-A16 December 2013Submittal of Reactor Vessel Internals Aging Management Program Consistent with MRP-227-ANondestructive Examination
Functionality Assessment
Aging Management
EVT-1
Flow Induced Vibration
W3F1-2013-0035, License Amendment Request to Address Multiple Administrative Issues with the Technical Specifications9 December 2013License Amendment Request to Address Multiple Administrative Issues with the Technical SpecificationsShutdown Margin
High Radiation Area
Grab sample
Process Control Program
TAC:MF32309 December 2013
IR 05000382/20134042 December 2013IR 05000382-13-404, 10/24/2013, Waterford Steam Electric Station, Unit 3Significance Determination Process
Affidavit
ML13333A53227 November 2013NRR E-mail Capture - RAI Regarding W 3 Relief Request W3-ISI-022Through-Wall Leak
W3F1-2013-0064, Supplemental Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Hazard Walkdowns Conducted to Verify Current Plant Compliance with the Current Licensing Basis (CLB) for Seismic Requirements27 November 2013Supplemental Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Hazard Walkdowns Conducted to Verify Current Plant Compliance with the Current Licensing Basis (CLB) for Seismic Requirements
ML13312A78725 November 2013Interim Staff Evaluation and Request for Additional Information Regarding Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)High Radiation Area
Safe Shutdown Earthquake
Finite Element Analysis
FLEX
Spent Fuel Pool Instrumentation
Fire Protection Program
ML13220A40222 November 2013Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 - Mitigation StrategiesSafe Shutdown
Boric Acid
High winds
Shutdown Margin
Ultimate heat sink
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Emergency Lighting
FLEX
Fukushima Dai-Ichi
Frazil ice
Battery sizing
Earthquake
ML13325B22221 November 2013Notification of NRC Triennial Heat Sink Performance Inspection (Report Number 05000382/2014002) and Request for InformationUltimate heat sink
ML13317A96920 November 2013Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Waterford Steam Electric Generating Station, Unit 3, TAC No.: MF0977Safe Shutdown
Boric Acid
High winds
Shutdown Margin
Ultimate heat sink
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Emergency Lighting
FLEX
Fukushima Dai-Ichi
Frazil ice
Battery sizing
Earthquake
ML13324B13320 November 2013IR 05000382-13-004; on 07/01/2013 - 09/30/2013; Waterford Steam Electric Station, Unit 3, Integrated Resident and Regional Report; Fire Protection, Post-Maintenance Testing, and Other ActivitiesSafe Shutdown
Boric Acid
High winds
High Radiation Area
Offsite Dose Calculation Manual
Internal Flooding
Enforcement Discretion
Met Tower
Temporary Modification
Functionality Assessment
Tornado-Generated Missile
Significance Determination Process
Job Performance Measure
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Large early release frequency
Operability Determination
Annual Radiological Effluent Release Report
Fire Protection Program
Fire Watch
Substantial potential for overexposure
Operability Assessment
IR 05000382/201300420 November 2013IR 05000382-13-004; on 07/01/2013 - 09/30/2013; Waterford Steam Electric Station, Unit 3, Integrated Resident and Regional Report; Fire Protection, Post-Maintenance Testing, and Other ActivitiesSafe Shutdown
Boric Acid
High winds
High Radiation Area
Ultimate heat sink
Offsite Dose Calculation Manual
Internal Flooding
Met Tower
Temporary Modification
Functionality Assessment
Tornado-Generated Missile
Significance Determination Process
Job Performance Measure
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Large early release frequency
Operability Determination
Annual Radiological Effluent Release Report
Fire Protection Program
Fire Watch
Substantial potential for overexposure
Operability Assessment
ML13304A73615 November 2013Reassignment to the DORL Plant Licensing IV-2 and Decommissioning Transition Branch Effective 11/3/2013
TAC:MF029611 November 2013
W3F1-2013-0043, Request for Review and Approval of Change to Updated Final Safety Analysis Report Clarifying Pressurizer Heaters Function for Natural Circulation at the Onset of a Loss of Offsite Power11 November 2013Request for Review and Approval of Change to Updated Final Safety Analysis Report Clarifying Pressurizer Heaters Function for Natural Circulation at the Onset of a Loss of Offsite PowerBoric Acid
Emergency Lighting
Time Critical Operator Action
W3F1-2013-0059, Revised Flooding Walkdown Report - Entergy'S Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Da11 November 2013Revised Flooding Walkdown Report - Entergy'S Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichiHigh winds
Hydrostatic
Locked High Radiation Area
Fukushima Dai-Ichi
W3F1-2013-0058, Registration of Cask Use7 November 2013Registration of Cask Use
ML13311B3817 November 2013Planned Modification of the Entergy Quality Assurance Program Manual (QAPM)
IR 05000382/20134035 November 2013IR 05000382-13-403, on 10/04/13, Waterford Steam Electric Station, Unit 3, NRC Security Inspection Report. Cover Letter OnlyAffidavit
ENOC-13-00029, Planned Modification of the Entergy Quality Assurance Program Manual (EA-11-096)4 November 2013Planned Modification of the Entergy Quality Assurance Program Manual (EA-11-096)
ML13304B4181 November 2013Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns
W3F1-2013-0062, Commitment Change for UT Examination Frequency for the Pressurizer Safety/Relief Valves' Nozzle Weld Overlays31 October 2013Commitment Change for UT Examination Frequency for the Pressurizer Safety/Relief Valves' Nozzle Weld OverlaysWeld Overlay
Dissimilar Metal Weld
ML13295A56322 October 2013NRR E-mail Capture - Acceptance Review Result for Waterford 3 Request for Relief, W3-ISI-022
ML13282A3089 October 2013Acceptance Review Email, Request for Alternative W3-ISI-023, ASME Code Case N-770-1 Successive Examinations, Third 10-Year Inservice Inspection IntervalDissimilar Metal Weld
ML13282A6957 October 2013Notification of NRC Initial Operator Licensing Examination 05000382-14-301
ML13127A2571 October 20132012-10-Draft Outline Comments
ML13003A2381 October 20132012-10-FINAL OP TestBoric Acid
Shutdown Margin
High Radiation Area
Met Tower
Job Performance Measure
Power change
W3F1-2013-0055, Response to Request for Additional Information (RAI) for the Overall Integrated Plan (OIP) in Response to the Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool (SFP) Instrumentation26 September 2013Response to Request for Additional Information (RAI) for the Overall Integrated Plan (OIP) in Response to the Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool (SFP) InstrumentationSafe Shutdown Earthquake
Finite Element Analysis
FLEX
Spent Fuel Pool Instrumentation
TAC:MF281526 September 2013
W3F1-2013-0044, Request for Alternative W3-ISI-023, ASME Code Case N-770-1 Successive Examinations26 September 2013Request for Alternative W3-ISI-023, ASME Code Case N-770-1 Successive ExaminationsDissimilar Metal Weld
W3F1-2013-0053, Entergy'S Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near- Term Task Force Review of Insights from the Fukushima Dai-ichi Accident - 1.5 Year Response12 September 2013Entergy'S Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near- Term Task Force Review of Insights from the Fukushima Dai-ichi Accident - 1.5 Year Response for CFukushima Dai-Ichi
Earthquake
IR 05000382/201340610 September 2013IR 05000382-13-406, 8/5/2013, Waterford Steam Electric Station, Unit 3, Temporary Instruction 2515/186, Inspection of Procedures and Process for Responding to Potential Aircraft Threats.Affidavit
ML13263A29010 September 2013Letter from Micheal R. Caster Forwarding Enclosed Standard Practice Procedures Plan'S for Waterford 3 Nuclear Power Station and Palisades Nuclear Plant
W3F1-2013-0054, CFR 71.95 Report on Issues Involving Radwaste Cask 8-120B9 September 2013CFR 71.95 Report on Issues Involving Radwaste Cask 8-120B
IR 05000382/20130063 September 2013Mid-Cycle Assessment Letter for Waterford Steam Electric Station, Unit 3 (Report 05000382-13-006)
Press Release-IV-13-026, NRC Will Hold an Open House on Waterford 3 Nuclear Plant Performance3 September 2013Press Release-IV-13-026: NRC Will Hold an Open House on Waterford 3 Nuclear Plant PerformanceOpen House
ML13246A31828 August 2013Request for Additional Information E-mail, Overall Integrated Plan in Response to 3/12/12 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)Spent Fuel Pool Instrumentation
W3F1-2013-0050, First Six Month Status Report for Implementation of Order EA-12-049, Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events28 August 2013First Six Month Status Report for Implementation of Order EA-12-049, Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External EventsFLEX
W3F1-2013-0049, First Six Month Status Report for Implementation of Order EA-12-051, Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation28 August 2013First Six Month Status Report for Implementation of Order EA-12-051, Commission Order Modifying License with Regard to Reliable Spent Fuel Pool InstrumentationSpent Fuel Pool Instrumentation
ML13234A50328 August 2013Nuclear Regulatory Commission Audits of Licensee Responses to Mitigation Strategies Order EA-12-049FLEX
ML13239A23327 August 2013Notice of Open House with Members of the Public, Waterford Steam Electric Station, Unit 3Open House
TAC:MF281427 August 2013
W3F1-2013-0018, Request for Relief from American Society of Mechanical Engineers (ASME) Code, Section XI for the Third 10-year Interval - Inservice Inspection Request for Relief W3-ISI-02227 August 2013Request for Relief from American Society of Mechanical Engineers (ASME) Code, Section XI for the Third 10-year Interval - Inservice Inspection Request for Relief W3-ISI-022Boric Acid
VT-2
Foreign Material Exclusion
W3F1-2013-0032, Core Operating Limits Report - Cycle 19 Revision 126 August 2013Core Operating Limits Report - Cycle 19 Revision 1Shutdown Margin
Coatings
ML13248A61123 August 2013LTR-13-0720 - Peggy Hatch, Louisiana Department of Environmental Quality Ltr. Letter from the Union of Concerned Scientists Regarding the Compliance of the Waterford Nuclear Power Plant with Fire Safety Standards Promulgated by the NRC