MONTHYEARIR 05000382/20233012023-08-15015 August 2023 NRC Initial Operator Licensing Examination Approval 05000382/2023301 ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML22075A3442022-03-16016 March 2022 Response to Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML22108A2662022-03-0909 March 2022 WAT-2022-02 Public Forms W3F1-2022-0019, WAT-2022-02 Post Exam Analysis2022-03-0909 March 2022 WAT-2022-02 Post Exam Analysis ML21117A2932021-04-28028 April 2021 Notification of NRC Initial Operator Licensing Examination 05000382/2022301 ML21106A1512021-04-16016 April 2021 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations W3F1-2020-0056, 08 Post Exam Analysis2020-09-10010 September 2020 08 Post Exam Analysis ML20267A2132020-08-26026 August 2020 08 Final Operating Test ML20267A2062020-08-26026 August 2020 05000382/202008 Draft Outline Comments ML20267A2092020-08-26026 August 2020 08 Draft Operating Test.Pdf ML20267A2102020-08-26026 August 2020 08 Draft Operating Test Comments ML20267A2082020-08-26026 August 2020 08 Draft Written Exam Comments ES-401-9 ML20267A2072020-08-26026 August 2020 08 Draft Written Exam ML20267A2052020-08-26026 August 2020 08 Draft Outlines ML20267A2122020-08-26026 August 2020 Examination Inspection Report 05000382/2020008 Final Written Exam IR 05000382/20200082020-08-26026 August 2020 Examination Inspection Report 05000382/2020008 Final Outlines ML20294A1372020-08-26026 August 2020 08 Public Forms ML20307A1742020-08-10010 August 2020 08 Exam Approval Letter ML20219A292 ML20072L2192020-03-12012 March 2020 Response to Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations ML20307A1732020-01-0707 January 2020 05000382/2020008 Corporate Notification Letter ML20007E607 ML19135A6642019-05-15015 May 2019 Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML19011A3712019-01-10010 January 2019 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2019 ML18304A4862018-10-30030 October 2018 NRC Initial Operator Licensing Examination Approval 05000382/2018301 ML18089A0412018-03-29029 March 2018 Notification of NRC Initial Operator Licensing Examination 05000382/2018301 ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17122A0502017-04-10010 April 2017 2017-03 Post Exam Comments ML17122A0482017-04-0505 April 2017 2017-03 Final Written Examination ML17137A1862017-04-0505 April 2017 WATERFORD-2017-03 Draft Written Examination - Do Not Release Until 4-30-19 ML17137A1842017-04-0505 April 2017 2017-03 Draft Outlines - Do Not Release Until 04/30/2019 ML17137A1852017-04-0505 April 2017 WATERFORD-2017-03 Draft Outline Comments - Do Not Release Until 4-30-19 ML17137A1902017-04-0505 April 2017 2017-03 Final Outlines ML17137A1882017-04-0505 April 2017 WATERFORD-2017-03 Draft Operating Test - Do Not Release Until 4-30-19 ML17137A1892017-04-0505 April 2017 2017-03 Draft Operting Test Comments - Do Not Release Until 04/30/2019 ML17137A1912017-04-0505 April 2017 WATERFORD-2017-03 Public Forms ML17137A1872017-04-0505 April 2017 WATERFORD-2017-03 Draft Written Exam Comments - Do Not Release Until 4-30-19 ML17122A0492017-03-27027 March 2017 2017-03 Final Operating Test - Do Not Release Until 4-30-19.pdf ML17075A3402017-03-14014 March 2017 NRC Initial Operator Licensing Examination Approval 05000382/2017301 ML17013A5482017-01-13013 January 2017 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2017 ML15351A0282015-12-17017 December 2015 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2016 ML15273A3322015-09-30030 September 2015 Generic Fundamentals Examination Results Sept 2015 ML15278A2222015-09-14014 September 2015 2015-09-FINAL Outlines ML15308A3802015-09-14014 September 2015 2015-09 Public Forms ML15278A2442015-09-14014 September 2015 WT-2015-09 Draft Written Exam Comments ML15278A2402015-09-14014 September 2015 WT - 2015 - 09 Draft Operating Test Comments ML15278A2372015-09-14014 September 2015 2015-09 Draft Outline Comments ML15278A2312015-09-14014 September 2015 2015-09 Final Operating Test ML15278A2282015-09-14014 September 2015 2015-09 Final Written Examination ML15273A4332015-09-14014 September 2015 2015-09 Post Exam Comments ML15225A5642015-09-14014 September 2015 2015-09 Draft Operating Test and Revised Outlines 2023-08-15
[Table view] Category:Part 55 Examination Related Material
MONTHYEARIR 05000382/20233012023-08-15015 August 2023 NRC Initial Operator Licensing Examination Approval 05000382/2023301 ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML22075A3442022-03-16016 March 2022 Response to Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML22108A2662022-03-0909 March 2022 WAT-2022-02 Public Forms W3F1-2022-0019, WAT-2022-02 Post Exam Analysis2022-03-0909 March 2022 WAT-2022-02 Post Exam Analysis ML21117A2932021-04-28028 April 2021 Notification of NRC Initial Operator Licensing Examination 05000382/2022301 ML21106A1512021-04-16016 April 2021 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations W3F1-2020-0056, 08 Post Exam Analysis2020-09-10010 September 2020 08 Post Exam Analysis IR 05000382/20200082020-08-26026 August 2020 Examination Inspection Report 05000382/2020008 Final Outlines ML20294A1372020-08-26026 August 2020 08 Public Forms ML20267A2132020-08-26026 August 2020 08 Final Operating Test ML20267A2122020-08-26026 August 2020 Examination Inspection Report 05000382/2020008 Final Written Exam ML20267A2052020-08-26026 August 2020 08 Draft Outlines ML20267A2072020-08-26026 August 2020 08 Draft Written Exam ML20267A2082020-08-26026 August 2020 08 Draft Written Exam Comments ES-401-9 ML20267A2102020-08-26026 August 2020 08 Draft Operating Test Comments ML20267A2092020-08-26026 August 2020 08 Draft Operating Test.Pdf ML20267A2062020-08-26026 August 2020 05000382/202008 Draft Outline Comments ML20307A1742020-08-10010 August 2020 08 Exam Approval Letter ML20219A292 ML20072L2192020-03-12012 March 2020 Response to Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations ML20307A1732020-01-0707 January 2020 05000382/2020008 Corporate Notification Letter ML20007E607 ML19135A6642019-05-15015 May 2019 Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML18304A4862018-10-30030 October 2018 NRC Initial Operator Licensing Examination Approval 05000382/2018301 ML18089A0412018-03-29029 March 2018 Notification of NRC Initial Operator Licensing Examination 05000382/2018301 ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17122A0502017-04-10010 April 2017 2017-03 Post Exam Comments ML17137A1862017-04-0505 April 2017 WATERFORD-2017-03 Draft Written Examination - Do Not Release Until 4-30-19 ML17137A1882017-04-0505 April 2017 WATERFORD-2017-03 Draft Operating Test - Do Not Release Until 4-30-19 ML17137A1902017-04-0505 April 2017 2017-03 Final Outlines ML17137A1872017-04-0505 April 2017 WATERFORD-2017-03 Draft Written Exam Comments - Do Not Release Until 4-30-19 ML17137A1892017-04-0505 April 2017 2017-03 Draft Operting Test Comments - Do Not Release Until 04/30/2019 ML17122A0482017-04-0505 April 2017 2017-03 Final Written Examination ML17137A1912017-04-0505 April 2017 WATERFORD-2017-03 Public Forms ML17137A1842017-04-0505 April 2017 2017-03 Draft Outlines - Do Not Release Until 04/30/2019 ML17137A1852017-04-0505 April 2017 WATERFORD-2017-03 Draft Outline Comments - Do Not Release Until 4-30-19 ML17122A0492017-03-27027 March 2017 2017-03 Final Operating Test - Do Not Release Until 4-30-19.pdf ML17075A3402017-03-14014 March 2017 NRC Initial Operator Licensing Examination Approval 05000382/2017301 ML15351A0282015-12-17017 December 2015 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2016 ML15273A3322015-09-30030 September 2015 Generic Fundamentals Examination Results Sept 2015 ML15308A3802015-09-14014 September 2015 2015-09 Public Forms ML15278A2442015-09-14014 September 2015 WT-2015-09 Draft Written Exam Comments ML15278A2402015-09-14014 September 2015 WT - 2015 - 09 Draft Operating Test Comments ML15278A2372015-09-14014 September 2015 2015-09 Draft Outline Comments ML15278A2312015-09-14014 September 2015 2015-09 Final Operating Test ML15278A2282015-09-14014 September 2015 2015-09 Final Written Examination ML15278A2222015-09-14014 September 2015 2015-09-FINAL Outlines ML15273A4332015-09-14014 September 2015 2015-09 Post Exam Comments ML15225A5642015-09-14014 September 2015 2015-09 Draft Operating Test and Revised Outlines ML15225A5222015-09-14014 September 2015 2015-09 Draft Written Exam and Revised Outlines ML15225A4902015-09-14014 September 2015 2015-09-DRAFT Outlines 2023-08-15
[Table view] |
Text
OUTLINE CHANGES Facility: W3 First Exam Date: October 1, 2012 Administrative JPM Outline (July 20, 2012)
Comment Resolution 1 A3 - Confirm this is RO level knowledge Yes. It is part of Technical Specification.
A7 - Does applicant have to approve Yes. 3.6.1.4. One hour to restore or Mode 2 this calculation? Are there TS actions? 3 in 6 hr, Mode 4, next 6 hrs, Mode 5 in following 30.
Control Room / In-Plant System JPM Outline (July 20, 2012)
Comment Resolution ES-301-2 for RO: one EN JPM (S8) Fixed 1
should be indicated in table ES-301-2 for SROI: S2 is missing P Fixed 2
designator ES-301-2 for SROI: S5 is identified as Fixed should have been P in S2 vice S5 3 P but not on the form for ROs and SROUs.
JPM S2 was changed from Alt Path as 4
discussed with the Lead Examiner Changed In-Plant JPMs for the SROU to 5 compensate for loss of S2 as an Alternate Path.
Simulator Scenario Outline Comments (July 20, 2012)
Comment Resolution ES-301-5: Scenario 1 - There are two Renumber HPSI pump failing to auto start as 1
Event 7s (SRO and BOP) Event 8. Fixed Scenario 1: Failure of one train of HPSI This is the only available train, HPSI A is 2 is not a Critical Task. (last event) tagged out initially. Discussed with B.
Larson.
Scenario 1: For Quantitative Attributes Fixed table - OP-902-002 procedure is the 1 3
substantive EOP (cant count SPTAs),
there are 0 contingency EOPs.
4 Scenario 1: Consider adding ATC event Added Event 9 (Relay Failure) Rev 0 OBDI 202 - ILE Process
post major transient.
Scenario 2: There are two Event 5s Renumber MFIV event as Event 6 and CCW 5 surge tank level switch event as Event 7.
Fixed Scenario 2: Proper response to major Discussed with B. Larson. Sent new critical 6
transient is one Critical Task, not two. Task document to him.
Scenario 2: For Quantitative Attributes Fixed. Scenario 4 had the same problem.
table - OP-902-004 procedure is the 1 Fixed Scenario 4.
7 substantive EOP, there are 0 contingency EOPs.
Scenario 3: Need a different major As agreed with Lead Examiner, changed 8 transient since LOCA is Scenario 1. event to a Large LOCA. Retained transition to Keep transition to Functional Recovery. OP-902-008.
Scenario 3: There are two Event 5s Renumber CS fails to auto actuate as Event 9
6, MSL break as Event 7. Fixed Scenario 3: For Quantitative Attributes Fixed 10 table - OP-902-002 procedure is the 1 substantive EOP.
Update ES-301-5 and recalculate Totals Updated 11 for each applicant type (lots of errors on Rev 0) Rev 0 OBDI 202 - ILE Process