Attachment 6 Rev 0 OBDI 202 - ILE Process OUTLINE CHANGES Facility:

W3 First Exam Date:

October 1, 2012 Administrative JPM Outline (July 20, 2012)

Comment Resolution 1 A3 - Confirm this is RO level knowledge Yes. It is part of Technical Specification.

2 A7 - Does applicant have to approve this calculation? Are there TS actions?

Yes. 3.6.1.4. One hour to restore or Mode 3 in 6 hr, Mode 4, next 6 hrs, Mode 5 in following 30.

Control Room / In-Plant System JPM Outline (July 20, 2012)

Comment Resolution 1 ES-301-2 for RO: one EN JPM (S8) should be indicated in table Fixed 2 ES-301-2 for SROI: S2 is missing P designator Fixed 3

ES-301-2 for SROI: S5 is identified as P but not on the form for ROs and SROUs.

Fixed should have been P in S2 vice S5 4 JPM S2 was changed from Alt Path as discussed with the Lead Examiner 5

Changed In-Plant JPMs for the SROU to compensate for loss of S2 as an Alternate Path.

Simulator Scenario Outline Comments (July 20, 2012)

Comment Resolution 1 ES-301-5: Scenario 1 - There are two Event 7s (SRO and BOP)

Renumber HPSI pump failing to auto start as Event 8. Fixed 2

Scenario 1: Failure of one train of HPSI is not a Critical Task. (last event)

This is the only available train, HPSI A is tagged out initially. Discussed with B.

Larson.

3 Scenario 1: For Quantitative Attributes table - OP-902-002 procedure is the 1 substantive EOP (cant count SPTAs),

there are 0 contingency EOPs.

Fixed 4 Scenario 1: Consider adding ATC event Added Event 9 (Relay Failure)

Rev 0 OBDI 202 - ILE Process post major transient.

5 Scenario 2: There are two Event 5s Renumber MFIV event as Event 6 and CCW surge tank level switch event as Event 7.

Fixed 6 Scenario 2: Proper response to major transient is one Critical Task, not two.

Discussed with B. Larson. Sent new critical Task document to him.

7 Scenario 2: For Quantitative Attributes table - OP-902-004 procedure is the 1 substantive EOP, there are 0 contingency EOPs.

Fixed. Scenario 4 had the same problem.

Fixed Scenario 4.

8 Scenario 3: Need a different major transient since LOCA is Scenario 1.

Keep transition to Functional Recovery.

As agreed with Lead Examiner, changed event to a Large LOCA. Retained transition to OP-902-008.

9 Scenario 3: There are two Event 5s Renumber CS fails to auto actuate as Event 6, MSL break as Event 7. Fixed 10 Scenario 3: For Quantitative Attributes table - OP-902-002 procedure is the 1 substantive EOP.

Fixed 11 Update ES-301-5 and recalculate Totals for each applicant type (lots of errors on Rev 0)

Updated