ML13127A257

From kanterella
Jump to navigation Jump to search
2012-10-Draft Outline Comments
ML13127A257
Person / Time
Site: Waterford Entergy icon.png
Issue date: 10/01/2013
From: Brian Larson
Operations Branch IV
To:
Entergy Operations
laura hurley
References
Download: ML13127A257 (2)


Text

OUTLINE CHANGES Facility: W3 First Exam Date: October 1, 2012 Administrative JPM Outline (July 20, 2012)

Comment Resolution 1 A3 - Confirm this is RO level knowledge Yes. It is part of Technical Specification.

A7 - Does applicant have to approve Yes. 3.6.1.4. One hour to restore or Mode 2 this calculation? Are there TS actions? 3 in 6 hr, Mode 4, next 6 hrs, Mode 5 in following 30.

Control Room / In-Plant System JPM Outline (July 20, 2012)

Comment Resolution ES-301-2 for RO: one EN JPM (S8) Fixed 1

should be indicated in table ES-301-2 for SROI: S2 is missing P Fixed 2

designator ES-301-2 for SROI: S5 is identified as Fixed should have been P in S2 vice S5 3 P but not on the form for ROs and SROUs.

JPM S2 was changed from Alt Path as 4

discussed with the Lead Examiner Changed In-Plant JPMs for the SROU to 5 compensate for loss of S2 as an Alternate Path.

Simulator Scenario Outline Comments (July 20, 2012)

Comment Resolution ES-301-5: Scenario 1 - There are two Renumber HPSI pump failing to auto start as 1

Event 7s (SRO and BOP) Event 8. Fixed Scenario 1: Failure of one train of HPSI This is the only available train, HPSI A is 2 is not a Critical Task. (last event) tagged out initially. Discussed with B.

Larson.

Scenario 1: For Quantitative Attributes Fixed table - OP-902-002 procedure is the 1 3

substantive EOP (cant count SPTAs),

there are 0 contingency EOPs.

4 Scenario 1: Consider adding ATC event Added Event 9 (Relay Failure) Rev 0 OBDI 202 - ILE Process

post major transient.

Scenario 2: There are two Event 5s Renumber MFIV event as Event 6 and CCW 5 surge tank level switch event as Event 7.

Fixed Scenario 2: Proper response to major Discussed with B. Larson. Sent new critical 6

transient is one Critical Task, not two. Task document to him.

Scenario 2: For Quantitative Attributes Fixed. Scenario 4 had the same problem.

table - OP-902-004 procedure is the 1 Fixed Scenario 4.

7 substantive EOP, there are 0 contingency EOPs.

Scenario 3: Need a different major As agreed with Lead Examiner, changed 8 transient since LOCA is Scenario 1. event to a Large LOCA. Retained transition to Keep transition to Functional Recovery. OP-902-008.

Scenario 3: There are two Event 5s Renumber CS fails to auto actuate as Event 9

6, MSL break as Event 7. Fixed Scenario 3: For Quantitative Attributes Fixed 10 table - OP-902-002 procedure is the 1 substantive EOP.

Update ES-301-5 and recalculate Totals Updated 11 for each applicant type (lots of errors on Rev 0) Rev 0 OBDI 202 - ILE Process