ML13360A06324 December 2013NRR E-mail Capture - North Anna and Surry: RAI - Addition of an Analytical Methodology Core Operating Limits Reports (Colrs) and an Increase to the Surry Minimum TemperatureShutdown Margin
ML13358A31619 December 2013Notification of Cyber Security Ti Milestones 1-7 Inspection and Request for Information (NRC Inspection Report No. 05000280-14-405 and 05000281-14-405)- OUO RemovedCyber Security
ML13347B19010 December 2013Associated Independent Spent Fuel Storage Installations, Security, Training & Qualification, Safeguards Contingency Plan & ISFSIs Program Request for Additional Information
ML13350A1099 December 2013ASME Section XI Fourth Interval Inservice Inspection (ISI) Program Revised Relief Requests SPT-003 and SPT-002 Alternative Testing Requirements for Small Diameter Reactor Coolant System Pressure Boundary ConnectionsHydrostatic
VT-2
TAC:MF018227 November 2013
ML13338A16827 November 2013Response to Request for Additional Information Regarding Seismic Aspects of Recommendation 2.3Unanalyzed Condition
Fukushima Dai-Ichi
ML13336A14226 November 2013Fifth 10-Year Interval Inservice Inspection Program and Alternative RequestsBoric Acid
Non-Destructive Examination
Weld Overlay
Hydrostatic
Nondestructive Examination
VT-2
Incorporated by reference
Foreign Material Exclusion
TAC:MF320026 November 2013
ML13347B18125 November 2013Units 1 and 2 - Confirmation of Payment
ML13322B22720 November 2013G. Suber Memo Surry Power Station Trip Report for October 21-25, 2013
IR 05000280/201340520 November 2013IR 05000280-13-405, 05000281-13-405, on 10/24/2013, Surry Power Station - NRC Security InspectionAffidavit
ML13317B6266 November 2013Confirmation of Payment
ML13316A0065 November 2013Inservice Testing Program for Pumps and Valves, Fifth Ten Year Interval Updated and Associated Relief Requests Response to Request for Additional Information - Relief Request P-5
ML13304B4181 November 2013Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns
ML13298A6251 November 2013Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool InstrumentationHigh Radiation Area
Locked High Radiation Area
FLEX
Spent Fuel Pool Instrumentation
Fire Protection Program
IR 05000280/201300429 October 2013IR 05000280-13-004, 05000281-13-004; on 07/01/2013-09/30/2013004; Surry Power Station, Units 1 and 2: Routine Integrated Inspection ReportSafe Shutdown
Fire Barrier
Temporary Modification
Functionality Assessment
Operability Determination
Maintenance Rule Program
Fire Protection Program
ML13308B90628 October 2013Core Operating Limits Report, Surry 1 Cycle 26 Pattern Apx Revision 0Shutdown Margin
ML13280A0584 October 2013NRR E-mail Capture - RAI - Reliable Spent Fuel Pool (SFP) Instrumentation (Order Number EA-12-051) for Surry Power Station Units 1 and 2
TAC:MF18112 October 2013
ML13282A5762 October 2013NRR E-mail Capture - RAI for Surry Power Station Unit 1, Relief Request P-5
ML13281A80130 September 2013Units 1 & 2 - Confirmation of Payment
ML13280A31130 September 2013Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.JNon-Destructive Examination
ML13186A19725 September 2013Independent Spent Fuel Storage Installations - Issuance of Amendments for Changes to the Emergency Action Level RevisionsFire Protection Program
ML13231A17023 September 2013Issuance of Amendments Regarding Use of a Temporary Jumper for Providing Service WaterUltimate heat sink
Internal Flooding
Probabilistic Risk Assessment
Biofouling
Fire Protection Program
ML13262A18117 September 2013Notification of Inspection and Request for InformationBoric Acid
Nondestructive Examination
ML13259A04112 September 2013Response to March 12, 2012 Information Request Regarding Seismic Aspects of Recommendation 2.1 - 1.5 Year Response for CEUS SitesSafe Shutdown Earthquake
Fukushima Dai-Ichi
Earthquake
ML13256A38011 September 2013NRR E-mail Capture - Acceptance Review -SURRY Power Station, Units 1 and 2 (Surry) - Permanent 15 Years Type a Test Interval-LAR (Tacs MF2612/MF2613)
TAC:MF18729 September 2013
ML13260A2509 September 2013Proposed License Amendment Request Regarding Relocation of Snubber Surveillance Requirements from Technical Specifications 4.17 to Snubber Program - Supplement
ML13247A7084 September 2013Notification of Inspection and Request for Information 05000280 and 05000281High Radiation Area
Process Control Program
ML13248A1073 September 2013Proposed License Amendment Request Regarding Temporary Service Water Jumper to the Component Cooling Heat Exchangers Correction of Identified DiscrepancyProbabilistic Risk Assessment
ML13246A1353 September 2013Mid Cycle Assessment Letter
ML13240A24231 August 2013NUREG/CR-7110 Vol 2 Rev 1 State-of-the-Art Reactor Consequence Analyses Project Volume 2: Surry Integrated AnalysisBoric Acid
Reactor Vessel Water Level
Loop seal
Ultimate heat sink
Mission time
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
Finite Element Analysis
Fukushima Dai-Ichi
Large early release frequency
Severe Accident Management Guideline
B.5.b Mitigating Strategies
Earthquake
Fuel cladding
ML13234A50328 August 2013Nuclear Regulatory Commission Audits of Licensee Responses to Mitigation Strategies Order EA-12-049FLEX
ML13231A11627 August 2013Relief from the Requirements of the ASME Code (TAC Nos. MF1805 and MF1806)Nondestructive Examination
Incorporated by reference
ML13242A01623 August 2013Virginia Electric & Power Company Surry Power Station Units 1 & 2 Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent FuelSpent Fuel Pool Instrumentation
ML13242A01323 August 2013Six Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049)Boric Acid
Safe Shutdown Earthquake
FLEX
ML13233A36423 August 2013Establishment of Mitigation Strategies Directorate for Nuclear Regulatory Commission Review of Order EA-12-049Fukushima Dai-Ichi
Press Release-II-13-052, NRC Assigns New Senior Resident Inspector to Surry Nuclear Power Plant22 August 2013Press Release-II-13-052: NRC Assigns New Senior Resident Inspector to Surry Nuclear Power PlantNew Resident Inspector
IR 05000280/201300720 August 2013IR 05000280-13-007, 05000281-13-007; 07/8/2013 - 07/25/2013; Surry Power Station, Units 1 and 2; Biennial Inspection of Problem Identification and Resolution Program
ML13212A36316 August 2013Review of the Steam Generator Tube Inservice Inspection Report for the Surry Power Station, Unit 1, Refueling Outage in 2012 (TAC Number MF0062)
TAC:MF261212 August 2013
ML13225A29312 August 20137/23-24/2013, Summary of Meeting 2013 U.S. Nuclear Regulatory Commission (NRC) Initial Exam Writers' Workshop
ML13232A04212 August 2013Proposed License Amendment Request Permanent Fifteen-Year Type a Test IntervalHigh winds
Mission time
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
Large early release frequency
Maintenance Rule Program
Scaffolding
ML13225A55712 August 2013Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit
ML13228A39912 August 2013Letter to Holders of Independent Spent Fuel Storage Installation (ISFSI) Licenses Re Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit - Rin 3150-AI64 (NRC-2009-0163) EA-02-109
ML13225A0078 August 2013March 12, 2012 Commission Order Modifying License with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order No. EA-12-051) Request for Additional Information (RAI) ResponseHigh Radiation Area
Locked High Radiation Area
FLEX
Spent Fuel Pool Instrumentation
IR 05000280/20135038 August 2013IR 0500028-13-503 and 05000281-13-503; 07/15/2013 - 07/19/2013; Surry Power Station, Units 1 and 2; Exercise and Baseline Inspection
ML13224A2476 August 2013Isfsis, Submittal of Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program - Rev. 18
ML13161A2862 August 2013Acknowledgement Letter for 60 Day Response to Issuance of Seismic Guidance Related to the NTTF Recommendation 2.1, Seismic ReevaluationsProbabilistic Risk Assessment
Earthquake