Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML13360A063 | 24 December 2013 | NRR E-mail Capture - North Anna and Surry: RAI - Addition of an Analytical Methodology Core Operating Limits Reports (Colrs) and an Increase to the Surry Minimum Temperature | Shutdown Margin |
ML13358A316 | 19 December 2013 | Notification of Cyber Security Ti Milestones 1-7 Inspection and Request for Information (NRC Inspection Report No. 05000280-14-405 and 05000281-14-405)- OUO Removed | Cyber Security |
ML13347B190 | 10 December 2013 | Associated Independent Spent Fuel Storage Installations, Security, Training & Qualification, Safeguards Contingency Plan & ISFSIs Program Request for Additional Information | |
ML13350A109 | 9 December 2013 | ASME Section XI Fourth Interval Inservice Inspection (ISI) Program Revised Relief Requests SPT-003 and SPT-002 Alternative Testing Requirements for Small Diameter Reactor Coolant System Pressure Boundary Connections | Hydrostatic VT-2 |
TAC:MF0182 | 27 November 2013 | ||
ML13338A168 | 27 November 2013 | Response to Request for Additional Information Regarding Seismic Aspects of Recommendation 2.3 | Unanalyzed Condition Fukushima Dai-Ichi |
ML13336A142 | 26 November 2013 | Fifth 10-Year Interval Inservice Inspection Program and Alternative Requests | Boric Acid Non-Destructive Examination Weld Overlay Hydrostatic Nondestructive Examination VT-2 Incorporated by reference Foreign Material Exclusion |
TAC:MF3200 | 26 November 2013 | ||
ML13347B181 | 25 November 2013 | Units 1 and 2 - Confirmation of Payment | |
ML13322B227 | 20 November 2013 | G. Suber Memo Surry Power Station Trip Report for October 21-25, 2013 | |
IR 05000280/2013405 | 20 November 2013 | IR 05000280-13-405, 05000281-13-405, on 10/24/2013, Surry Power Station - NRC Security Inspection | Affidavit |
ML13317B626 | 6 November 2013 | Confirmation of Payment | |
ML13316A006 | 5 November 2013 | Inservice Testing Program for Pumps and Valves, Fifth Ten Year Interval Updated and Associated Relief Requests Response to Request for Additional Information - Relief Request P-5 | |
ML13304B418 | 1 November 2013 | Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns | |
ML13298A625 | 1 November 2013 | Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation | High Radiation Area Locked High Radiation Area FLEX Spent Fuel Pool Instrumentation Fire Protection Program |
IR 05000280/2013004 | 29 October 2013 | IR 05000280-13-004, 05000281-13-004; on 07/01/2013-09/30/2013004; Surry Power Station, Units 1 and 2: Routine Integrated Inspection Report | Safe Shutdown Fire Barrier Temporary Modification Functionality Assessment Operability Determination Maintenance Rule Program Fire Protection Program |
ML13308B906 | 28 October 2013 | Core Operating Limits Report, Surry 1 Cycle 26 Pattern Apx Revision 0 | Shutdown Margin |
ML13280A058 | 4 October 2013 | NRR E-mail Capture - RAI - Reliable Spent Fuel Pool (SFP) Instrumentation (Order Number EA-12-051) for Surry Power Station Units 1 and 2 | |
TAC:MF1811 | 2 October 2013 | ||
ML13282A576 | 2 October 2013 | NRR E-mail Capture - RAI for Surry Power Station Unit 1, Relief Request P-5 | |
ML13281A801 | 30 September 2013 | Units 1 & 2 - Confirmation of Payment | |
ML13280A311 | 30 September 2013 | Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J | Non-Destructive Examination |
ML13186A197 | 25 September 2013 | Independent Spent Fuel Storage Installations - Issuance of Amendments for Changes to the Emergency Action Level Revisions | Fire Protection Program |
ML13231A170 | 23 September 2013 | Issuance of Amendments Regarding Use of a Temporary Jumper for Providing Service Water | Ultimate heat sink Internal Flooding Probabilistic Risk Assessment Biofouling Fire Protection Program |
ML13262A181 | 17 September 2013 | Notification of Inspection and Request for Information | Boric Acid Nondestructive Examination |
ML13259A041 | 12 September 2013 | Response to March 12, 2012 Information Request Regarding Seismic Aspects of Recommendation 2.1 - 1.5 Year Response for CEUS Sites | Safe Shutdown Earthquake Fukushima Dai-Ichi Earthquake |
ML13256A380 | 11 September 2013 | NRR E-mail Capture - Acceptance Review -SURRY Power Station, Units 1 and 2 (Surry) - Permanent 15 Years Type a Test Interval-LAR (Tacs MF2612/MF2613) | |
TAC:MF1872 | 9 September 2013 | ||
ML13260A250 | 9 September 2013 | Proposed License Amendment Request Regarding Relocation of Snubber Surveillance Requirements from Technical Specifications 4.17 to Snubber Program - Supplement | |
ML13247A708 | 4 September 2013 | Notification of Inspection and Request for Information 05000280 and 05000281 | High Radiation Area Process Control Program |
ML13248A107 | 3 September 2013 | Proposed License Amendment Request Regarding Temporary Service Water Jumper to the Component Cooling Heat Exchangers Correction of Identified Discrepancy | Probabilistic Risk Assessment |
ML13246A135 | 3 September 2013 | Mid Cycle Assessment Letter | |
ML13240A242 | 31 August 2013 | NUREG/CR-7110 Vol 2 Rev 1 State-of-the-Art Reactor Consequence Analyses Project Volume 2: Surry Integrated Analysis | Boric Acid Reactor Vessel Water Level Loop seal Ultimate heat sink Mission time Internal Flooding Hydrostatic Probabilistic Risk Assessment Finite Element Analysis Fukushima Dai-Ichi Large early release frequency Severe Accident Management Guideline B.5.b Mitigating Strategies Earthquake Fuel cladding |
ML13234A503 | 28 August 2013 | Nuclear Regulatory Commission Audits of Licensee Responses to Mitigation Strategies Order EA-12-049 | FLEX |
ML13231A116 | 27 August 2013 | Relief from the Requirements of the ASME Code (TAC Nos. MF1805 and MF1806) | Nondestructive Examination Incorporated by reference |
ML13242A016 | 23 August 2013 | Virginia Electric & Power Company Surry Power Station Units 1 & 2 Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel | Spent Fuel Pool Instrumentation |
ML13242A013 | 23 August 2013 | Six Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049) | Boric Acid Safe Shutdown Earthquake FLEX |
ML13233A364 | 23 August 2013 | Establishment of Mitigation Strategies Directorate for Nuclear Regulatory Commission Review of Order EA-12-049 | Fukushima Dai-Ichi |
Press Release-II-13-052, NRC Assigns New Senior Resident Inspector to Surry Nuclear Power Plant | 22 August 2013 | Press Release-II-13-052: NRC Assigns New Senior Resident Inspector to Surry Nuclear Power Plant | New Resident Inspector |
IR 05000280/2013007 | 20 August 2013 | IR 05000280-13-007, 05000281-13-007; 07/8/2013 - 07/25/2013; Surry Power Station, Units 1 and 2; Biennial Inspection of Problem Identification and Resolution Program | |
ML13212A363 | 16 August 2013 | Review of the Steam Generator Tube Inservice Inspection Report for the Surry Power Station, Unit 1, Refueling Outage in 2012 (TAC Number MF0062) | |
TAC:MF2612 | 12 August 2013 | ||
ML13225A293 | 12 August 2013 | 7/23-24/2013, Summary of Meeting 2013 U.S. Nuclear Regulatory Commission (NRC) Initial Exam Writers' Workshop | |
ML13232A042 | 12 August 2013 | Proposed License Amendment Request Permanent Fifteen-Year Type a Test Interval | High winds Mission time Internal Flooding Hydrostatic Probabilistic Risk Assessment Large early release frequency Maintenance Rule Program Scaffolding |
ML13225A557 | 12 August 2013 | Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit | |
ML13228A399 | 12 August 2013 | Letter to Holders of Independent Spent Fuel Storage Installation (ISFSI) Licenses Re Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit - Rin 3150-AI64 (NRC-2009-0163) EA-02-109 | |
ML13225A007 | 8 August 2013 | March 12, 2012 Commission Order Modifying License with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order No. EA-12-051) Request for Additional Information (RAI) Response | High Radiation Area Locked High Radiation Area FLEX Spent Fuel Pool Instrumentation |
IR 05000280/2013503 | 8 August 2013 | IR 0500028-13-503 and 05000281-13-503; 07/15/2013 - 07/19/2013; Surry Power Station, Units 1 and 2; Exercise and Baseline Inspection | |
ML13224A247 | 6 August 2013 | Isfsis, Submittal of Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program - Rev. 18 | |
ML13161A286 | 2 August 2013 | Acknowledgement Letter for 60 Day Response to Issuance of Seismic Guidance Related to the NTTF Recommendation 2.1, Seismic Reevaluations | Probabilistic Risk Assessment Earthquake |