ML13347B190

From kanterella
Jump to navigation Jump to search
Associated Independent Spent Fuel Storage Installations, Security, Training & Qualification, Safeguards Contingency Plan & ISFSIs Program Request for Additional Information
ML13347B190
Person / Time
Site: Millstone, Surry, North Anna, 07200002, 07200055  Dominion icon.png
Issue date: 12/10/2013
From: Blasioli P
Dominion, Dominion Nuclear Connecticut, Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
References
Download: ML13347B190 (3)


Text

R 0

Q Dominion Dominion Nuclear Connecticut, Inc.

5000 Dominion Boulevard, Glen Allen, VA 23060 Wcb Address: Nwv.don.com Safeguards Information December 10, 2013 Re:

10 CFR 10 CFR 50.54 72.186 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001 Serial No.

NL&OS/Mv Docket N 13-6 1AE: RO os.:

50-2 50-3 DOMINION NUCLEAR CONNECTICUT, INC.

50-2 VIRGINIA ELECTRIC AND POWER COMPANY 72-2 MILLSTONE POWER STATION UNITS 1, 2, AND 3 License Nos.: DPF NORTH ANNA POWER STATION UNITS I AND 2 NPF SURRY POWER STATION UNITS 1 AND 2 NPF AND ASSOCIATED INDEPENDENT SPENT FUEL STORAGE DPR INSTALLATIONS (ISFSls)

SNM-250 SECURITY PLAN, TRAINING AND QUALIFICATION PLAN, SAFEGUARDS CONTINGENCY PLAN.,

AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION PROGRAM REQUEST FOR ADDITIONAL INFORMATION (RAI)

.44

45/336/423 38/339

.80/281

/16/47/55/56

{-21/65

-49

-4/7

{-32/37 1/2507 Revision 18 of Millstone, North Anna and Surry Power Stations' Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program was submitted to the Nuclear Regulatory Commission (NRC) on August 6, 2013 (Serial No. 13-126B). The NRC provided an RAI to Dominion Nuclear Connecticut, Inc. (DNC) by letter dated December 4, 2013. DNC's response to the RAI is provided in the attachment to this letter.

The attached material contains Safeguards Information as defined by 10 CFR 73.22 and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended.

If you have any questions, please contact Ms. Margaret Earle at 804-273-2768.

Sincerely, Paul A. Blasioli Director Nuclear Protection Services and Emergency Preparedness for Dominion Nuclear Connecticut, Inc.

Virginia Electric and Power Company Classified By:

Name: Mark Gelinas

Title:

COORD NUCLEAR SECURITY PROGRAMS Organization: Nuc. Protection Services/ Dominion Effective Date: December 4. 2013 I

Unauthorized Disclosure Of Safeguards Information Will Be Subiect To Civil And Criminal Sanctions Ii NOTE: THE ATTACHMENT TO THIS LETTER CONTAINS "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF THE ATTACHMENT, THIS LETTER IS "DECONTROLLED."

Safeguards Information sc)Dý

Safeguards Information Serial No.13-644 Request for Additional Information Page 2 of 3 Attachment (Safeguards Information)

Commitments made by this letter: None cc:

U. S. Nuclear Regulatory Commission, Region I Attn.: Regional Administrator 2100 Renaissance Blvd., Suite 100 King of Prussia, PA 19406-2713 U. S. Nuclear Regulatory Commission, Region II Attn.: Regional Administrator 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 Director, Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 Mr. J. M. Goshen (Without Attachment)

NRC Project Manager U. S. Nuclear Regulatory Commission Mail Stop EBB-E3 D2M One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Ms. J. Davis (Without Attachment)

NRC Project Manager U. S. Nuclear Regulatory Commission Mail Stop EBB-E3 D2M One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Mr. S. J. Giebel (Without Attachment)

NRC Project Manager Millstone Unit 1 U. S. Nuclear Regulatory Commission Mail Stop T-8 F5 Two White Flint North 11545 Rockville Pike Rockville, MD 20852-2738 NOTE: THE ATTACHMENT TO THIS LETTER CONTAINS "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF THE ATTACHMENT, THIS LETTER IS "DECONTROLLED."

Safeguards Information

Safeguards Information Serial No.13-644 Request for Additional Information Page 3 of 3 Mr. J. S. Kim (Without Attachment)

NRC Project Manager Millstone Units 2 and 3 U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 C 2A 11555 Rockville Pike Rockville, MD 20852-2738 Ms. K. R. Cotton (Without Attachment)

NRC Project Manager Surry U. S. Nuclear Regulatory Commission Mail Stop 0 8G-9A One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Dr. V. Sreenivas (Without Attachment)

NRC Project Manager North Anna U. S. Nuclear Regulatory Commission Mail Stop 0 8G-9A One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Ms. L. A. Kauffman (Without Attachment)

NRC Inspector 2100 Renaissance Blvd.,

Suite 100 King of Prussia, PA 19406-2713 NRC Senior Resident Inspector (Without Attachment)

Millstone Power Station NRC Senior Resident Inspector (Without Attachment)

North Anna Power Station NRC Senior Resident Inspector (Without Attachment)

Surry Power Station NOTE: THE ATTACHMENT TO THIS LETTER CONTAINS "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF THE ATTACHMENT, THIS LETTER IS "DECONTROLLED."

Safeguards Information