Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML14007A680 | 31 December 2013 | Ltr. 12/31/2013 Perry Nuclear Power Plant Re NRC Office of Investigations No. 3-2013-007 Synopsis | |
ML14022A282 | 21 December 2013 | Comment (00930) of Michael Keegan on PR-51, Waste Confidence - Continued Storage of Spent Nuclear Fuel | Time to boil Operating Basis Earthquake License Renewal Earthquake Chernobyl Fuel cladding Affidavit |
ML13351A323 | 16 December 2013 | CDBI Request for Information | Stroke time Temporary Modification Job Performance Measure Large early release frequency Time Critical Operator Action |
ML13340A653 | 11 December 2013 | Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation | High Radiation Area FLEX Spent Fuel Pool Instrumentation Fire Protection Program |
L-13-306, Request for Licensing Action Pursuant to 10 CFR 50.59. 50.67. and 50.90: Full Implementation of Alternative Accident Source Term Design Basis Accident Analyses. and an Associated Technical Specification Change | 6 December 2013 | Request for Licensing Action Pursuant to 10 CFR 50.59. 50.67. and 50.90: Full Implementation of Alternative Accident Source Term Design Basis Accident Analyses. and an Associated Technical Specification Change | Safe Shutdown Shutdown Margin Offsite Dose Calculation Manual Anticipated operational occurrence Tornado Missile Safe Shutdown Earthquake Operating Basis Earthquake Tornado Generated Missile Abnormal operational transient Tornado Missile Protection Large early release frequency Earthquake Deep Dose Equivalent Fuel cladding Recently irradiated fuel Backfit Power Uprate Overexposure |
TAC:MF3197 | 6 December 2013 | ||
ML13340A147 | 26 November 2013 | Davis-Besse Nuclear Power Station & Perry Nuclear Power Plant - Response to RAI Associated with Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident (TAC Nos. MF0116 & MF0 | Condition Adverse to Quality Fukushima Dai-Ichi |
IR 05000440/2013407 | 14 November 2013 | IR 05000440-13-407; 09/30/2013 - 10/03/2013; Perry Nuclear Power Plant; Routine Security Baseline Inspection (Cover Letter Only) | Affidavit |
IR 05000440/2013004 | 14 November 2013 | IR 05000440-13-004, on 07/01/2013 - 09/30/2013; Perry Nuclear Power Plant. Annual Fire Protection Drill Observation; Occupational Radiation Safety; and Public Radiation Safety | High Radiation Area Offsite Dose Calculation Manual Temporary Modification Functionality Assessment Locked High Radiation Area B.5.b Significance Determination Process Annual Radiological Environmental Operating Report Process Control Program Operability Determination Pressure Boundary Leakage Through-Wall Leakage Fire Protection Program Substantial potential for an overexposure Unidentified leakage Siren Overexposure |
ML13324A391 | 8 November 2013 | Part 21 - Machining Error Identified in Geared Limit Switches | |
IR 05000440/2013202 | 7 November 2013 | IR 05000440-13-202, on September 13, 2013, Perry Nuclear Power Plant - NRC Security | Significance Determination Process Affidavit |
ML13304B418 | 1 November 2013 | Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns | |
ML13294A597 | 21 October 2013 | FENOC Presentation Slides for Public Meeting September 24, 2013 | Cyber Security FLEX |
ML13281A536 | 15 October 2013 | Meeting Slide for FENOC Presubmittal Guidance Checklist Part I | Probabilistic Risk Assessment Exemption Request |
ML13281A530 | 15 October 2013 | Meeting Slide for FENOC - NRC Pre-Submittal Meeting Request for Licensing Action | |
ML13340A157 | 9 October 2013 | Perry Nuclear Power Plant Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report Revision 1, Appendix B (1 of 2) | Scaffolding |
ML13340A156 | 9 October 2013 | Perry Nuclear Power Plant Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report Revision 1, Appendix a | |
ML13340A155 | 9 October 2013 | Perry Nuclear Power Plant Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report Revision 1 | |
ML13282A646 | 9 October 2013 | Notice of Cancelled Forthcoming Meeting with Firstenergy Nuclear Operating Company (FENOC) to Discuss Proposed Dose Calculations for Fuel | |
L-13-358, Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report Revision 1, Appendix B (2 of 2) | 9 October 2013 | Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report Revision 1, Appendix B (2 of 2) | |
ML13284A084 | 3 October 2013 | Deficiency Report from Baldor Electric Co., on Nuclear Nonconformance Event No. 49302 | |
IR 05000440/2013008 | 3 October 2013 | IR 05000440-13-008; 07/08/2013 - 09/17/2013; Perry Nuclear Power Plant; Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications | Significance Determination Process |
ML13276A494 | 3 October 2013 | Notice of Forthcoming Meeting with Firstenergy Nuclear Operating Company (FENOC) to Discuss Proposed Dose Calculations for Fuel | |
L-13-300, Submittal of 10 CFR 71.95 Report on the 8-120B Cask | 1 October 2013 | Submittal of 10 CFR 71.95 Report on the 8-120B Cask | |
ML13254A138 | 18 September 2013 | No. 1, and Perry Nuclear Power Plant, Unit No. 1 - Replacement of Parent Company Guarantee | |
ML13267A394 | 18 September 2013 | Ohio Department of Public Safety/Request Permission to Observe a Radiological Environmental Monitoring Program (REMP) Inspection at the Perry Nuclear Power Plant/Letter | Fitness for Duty |
Press Release-I-13-032, NRC Staff to Meet with Firstenergy on Sept. 24 in Coraopolis, Pa. to Discuss Performance of Company & Nuclear Power Plants | 16 September 2013 | Press Release-I-13-032: NRC Staff to Meet with Firstenergy on Sept. 24 in Coraopolis, Pa. to Discuss Performance of Company & Nuclear Power Plants | |
L-13-245, Response to NRC Request for Information Pursuant to 10 CFS 50.54(f) Regarding Seismic Aspects of Recommendation 2.1 of Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident | 11 September 2013 | Response to NRC Request for Information Pursuant to 10 CFS 50.54(f) Regarding Seismic Aspects of Recommendation 2.1 of Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident | Safe Shutdown Earthquake Fukushima Dai-Ichi Earthquake |
ML13252A171 | 9 September 2013 | 9/24/13 - Notice of Public Meeting - Firstenergy Nuclear Operating Company (Fenoc)(Beaver Valley, Perry, and Davis-Besse) | |
Press Release-13-073, NRC Issues Mid-Cycle Assessments for Nation'S Nuclear Plants | 6 September 2013 | Press Release-13-073: NRC Issues Mid-Cycle Assessments for Nation'S Nuclear Plants | |
IR 05000440/2013403 | 5 September 2013 | IR 05000440-13-403, 8/16/2013, Perry Nuclear Power Plant - NRC Material Control and Accounting Program Inspection Report (Cover Letter Only) | Affidavit |
ML13246A237 | 3 September 2013 | 2013 Perry Nuclear Power Plant Mid-Cycle Letter Combined | |
L-13-294, Notification of Change in Management | 3 September 2013 | Notification of Change in Management | |
L-13-243, Firstenergy Nuclear Operating Company'S, First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No | 26 August 2013 | Firstenergy Nuclear Operating Company'S, First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No | FLEX |
L-13-244, First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses Re Reliable Spent Fuel Pool Instrumentation (Order EA-12-051) | 26 August 2013 | First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses Re Reliable Spent Fuel Pool Instrumentation (Order EA-12-051) | Spent Fuel Pool Instrumentation |
ML13235A347 | 23 August 2013 | Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection at the Perry Nuclear Power Plant | Temporary Modification Power change |
ML13246A087 | 23 August 2013 | Nuclear Nonconformance Event Number 49302 - 10CFR21 Notification | |
ML13233A364 | 23 August 2013 | Establishment of Mitigation Strategies Directorate for Nuclear Regulatory Commission Review of Order EA-12-049 | Fukushima Dai-Ichi |
L-13-270, Response to a Request for Additional Information Related to the Decommissioning Funding Status Reports for Beaver Valley Power Station, Unit Nos. 1 and 2: Davis-Besse Nuclear Power Station, Unit No. 1: and Perry Nuclear Power Plant, Unit No | 22 August 2013 | Response to a Request for Additional Information Related to the Decommissioning Funding Status Reports for Beaver Valley Power Station, Unit Nos. 1 and 2: Davis-Besse Nuclear Power Station, Unit No. 1: and Perry Nuclear Power Plant, Unit No | |
L-13-247, Emergency Response Data System (ERDS) Point Library Change | 14 August 2013 | Emergency Response Data System (ERDS) Point Library Change | |
IR 05000440/2013009 | 12 August 2013 | IR 05000440-13-009, 6/10/2013 - 6/28/2013, Perry Nuclear Power Plant; Supplemental Inspection - Inspection Procedure (IP) 95002, One Degraded Cornerstone or Any Three White Inputs in a Strategic Performance Area | High Radiation Area Locked High Radiation Area Significance Determination Process Fuel cladding Substantial potential for an overexposure Overexposure |
ML13225A557 | 12 August 2013 | Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit | |
L-13-190, Fourteenth Inservice Inspection Summary Report | 9 August 2013 | Fourteenth Inservice Inspection Summary Report | |
IR 05000440/2013003 | 7 August 2013 | IR 05000440-13-003, 04/01/2013 - 06/30/2013; Perry Nuclear Power Plant. Routine Integrated Inspection Report | High Radiation Area Water Inventory Control Internal Flooding Probabilistic Risk Assessment Temporary Modification Functionality Assessment Significance Determination Process Scram Discharge Volume Operability Determination Fire Protection Program Operability Assessment Unidentified leakage |
IR 05000440/2013405 | 6 August 2013 | IR 05000440-13-405, 06/24/2013 - 06/27/2013, Perry Nuclear Power Plant; Routine Security Baseline Inspection (Cover Letter Only) | Significance Determination Process Affidavit |
L-13-254, Online Reference Portal for Review of Mitigation Strategies Submittal in Response to Order EA-12-049 | 5 August 2013 | Online Reference Portal for Review of Mitigation Strategies Submittal in Response to Order EA-12-049 | |
ML13161A286 | 2 August 2013 | Acknowledgement Letter for 60 Day Response to Issuance of Seismic Guidance Related to the NTTF Recommendation 2.1, Seismic Reevaluations | Probabilistic Risk Assessment Earthquake |
ML13206A427 | 1 August 2013 | Online Reference Portal for Nuclear Regulatory Commission Review of Fukushima Near Term Task Force Related Documents | |
ML13191A252 | 18 July 2013 | Request for Additional Information Regarding the 2013 Decommissioning Funding Status Report (TAC MF2162, MF2163 & MF2229) | |
TAC:MF0962 | 3 July 2013 |