ML14007A68031 December 2013Ltr. 12/31/2013 Perry Nuclear Power Plant Re NRC Office of Investigations No. 3-2013-007 Synopsis
ML14022A28221 December 2013Comment (00930) of Michael Keegan on PR-51, Waste Confidence - Continued Storage of Spent Nuclear FuelTime to boil
Operating Basis Earthquake
License Renewal
Earthquake
Chernobyl
Fuel cladding
Affidavit
ML13351A32316 December 2013CDBI Request for InformationStroke time
Temporary Modification
Job Performance Measure
Large early release frequency
Time Critical Operator Action
ML13340A65311 December 2013Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool InstrumentationHigh Radiation Area
FLEX
Spent Fuel Pool Instrumentation
Fire Protection Program
L-13-306, Request for Licensing Action Pursuant to 10 CFR 50.59. 50.67. and 50.90: Full Implementation of Alternative Accident Source Term Design Basis Accident Analyses. and an Associated Technical Specification Change6 December 2013Request for Licensing Action Pursuant to 10 CFR 50.59. 50.67. and 50.90: Full Implementation of Alternative Accident Source Term Design Basis Accident Analyses. and an Associated Technical Specification ChangeSafe Shutdown
Shutdown Margin
Offsite Dose Calculation Manual
Anticipated operational occurrence
Tornado Missile
Safe Shutdown Earthquake
Operating Basis Earthquake
Tornado Generated Missile
Abnormal operational transient
Tornado Missile Protection
Large early release frequency
Earthquake
Deep Dose Equivalent
Fuel cladding
Recently irradiated fuel
Backfit
Power Uprate
Overexposure
TAC:MF31976 December 2013
ML13340A14726 November 2013Davis-Besse Nuclear Power Station & Perry Nuclear Power Plant - Response to RAI Associated with Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident (TAC Nos. MF0116 & MF0Condition Adverse to Quality
Fukushima Dai-Ichi
IR 05000440/201340714 November 2013IR 05000440-13-407; 09/30/2013 - 10/03/2013; Perry Nuclear Power Plant; Routine Security Baseline Inspection (Cover Letter Only)Affidavit
IR 05000440/201300414 November 2013IR 05000440-13-004, on 07/01/2013 - 09/30/2013; Perry Nuclear Power Plant. Annual Fire Protection Drill Observation; Occupational Radiation Safety; and Public Radiation SafetyHigh Radiation Area
Offsite Dose Calculation Manual
Temporary Modification
Functionality Assessment
Locked High Radiation Area
B.5.b
Significance Determination Process
Annual Radiological Environmental Operating Report
Process Control Program
Operability Determination
Pressure Boundary Leakage
Through-Wall Leakage
Fire Protection Program
Substantial potential for an overexposure
Unidentified leakage
Siren
Overexposure
ML13324A3918 November 2013Part 21 - Machining Error Identified in Geared Limit Switches
IR 05000440/20132027 November 2013IR 05000440-13-202, on September 13, 2013, Perry Nuclear Power Plant - NRC SecuritySignificance Determination Process
Affidavit
ML13304B4181 November 2013Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns
ML13294A59721 October 2013FENOC Presentation Slides for Public Meeting September 24, 2013Cyber Security
FLEX
ML13281A53615 October 2013Meeting Slide for FENOC Presubmittal Guidance Checklist Part IProbabilistic Risk Assessment
Exemption Request
ML13281A53015 October 2013Meeting Slide for FENOC - NRC Pre-Submittal Meeting Request for Licensing Action
ML13340A1579 October 2013Perry Nuclear Power Plant Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report Revision 1, Appendix B (1 of 2)Scaffolding
ML13340A1569 October 2013Perry Nuclear Power Plant Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report Revision 1, Appendix a
ML13340A1559 October 2013Perry Nuclear Power Plant Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report Revision 1
ML13282A6469 October 2013Notice of Cancelled Forthcoming Meeting with Firstenergy Nuclear Operating Company (FENOC) to Discuss Proposed Dose Calculations for Fuel
L-13-358, Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report Revision 1, Appendix B (2 of 2)9 October 2013Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report Revision 1, Appendix B (2 of 2)
ML13284A0843 October 2013Deficiency Report from Baldor Electric Co., on Nuclear Nonconformance Event No. 49302
IR 05000440/20130083 October 2013IR 05000440-13-008; 07/08/2013 - 09/17/2013; Perry Nuclear Power Plant; Evaluations of Changes, Tests, or Experiments and Permanent Plant ModificationsSignificance Determination Process
ML13276A4943 October 2013Notice of Forthcoming Meeting with Firstenergy Nuclear Operating Company (FENOC) to Discuss Proposed Dose Calculations for Fuel
L-13-300, Submittal of 10 CFR 71.95 Report on the 8-120B Cask1 October 2013Submittal of 10 CFR 71.95 Report on the 8-120B Cask
ML13254A13818 September 2013No. 1, and Perry Nuclear Power Plant, Unit No. 1 - Replacement of Parent Company Guarantee
ML13267A39418 September 2013Ohio Department of Public Safety/Request Permission to Observe a Radiological Environmental Monitoring Program (REMP) Inspection at the Perry Nuclear Power Plant/LetterFitness for Duty
Press Release-I-13-032, NRC Staff to Meet with Firstenergy on Sept. 24 in Coraopolis, Pa. to Discuss Performance of Company & Nuclear Power Plants16 September 2013Press Release-I-13-032: NRC Staff to Meet with Firstenergy on Sept. 24 in Coraopolis, Pa. to Discuss Performance of Company & Nuclear Power Plants
L-13-245, Response to NRC Request for Information Pursuant to 10 CFS 50.54(f) Regarding Seismic Aspects of Recommendation 2.1 of Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident11 September 2013Response to NRC Request for Information Pursuant to 10 CFS 50.54(f) Regarding Seismic Aspects of Recommendation 2.1 of Near-Term Task Force Review of Insights from the Fukushima Dai-ichi AccidentSafe Shutdown Earthquake
Fukushima Dai-Ichi
Earthquake
ML13252A1719 September 20139/24/13 - Notice of Public Meeting - Firstenergy Nuclear Operating Company (Fenoc)(Beaver Valley, Perry, and Davis-Besse)
Press Release-13-073, NRC Issues Mid-Cycle Assessments for Nation'S Nuclear Plants6 September 2013Press Release-13-073: NRC Issues Mid-Cycle Assessments for Nation'S Nuclear Plants
IR 05000440/20134035 September 2013IR 05000440-13-403, 8/16/2013, Perry Nuclear Power Plant - NRC Material Control and Accounting Program Inspection Report (Cover Letter Only)Affidavit
ML13246A2373 September 20132013 Perry Nuclear Power Plant Mid-Cycle Letter Combined
L-13-294, Notification of Change in Management3 September 2013Notification of Change in Management
L-13-243, Firstenergy Nuclear Operating Company'S, First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No26 August 2013Firstenergy Nuclear Operating Company'S, First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order NoFLEX
L-13-244, First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses Re Reliable Spent Fuel Pool Instrumentation (Order EA-12-051)26 August 2013First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses Re Reliable Spent Fuel Pool Instrumentation (Order EA-12-051)Spent Fuel Pool Instrumentation
ML13235A34723 August 2013Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection at the Perry Nuclear Power PlantTemporary Modification
Power change
ML13246A08723 August 2013Nuclear Nonconformance Event Number 49302 - 10CFR21 Notification
ML13233A36423 August 2013Establishment of Mitigation Strategies Directorate for Nuclear Regulatory Commission Review of Order EA-12-049Fukushima Dai-Ichi
L-13-270, Response to a Request for Additional Information Related to the Decommissioning Funding Status Reports for Beaver Valley Power Station, Unit Nos. 1 and 2: Davis-Besse Nuclear Power Station, Unit No. 1: and Perry Nuclear Power Plant, Unit No22 August 2013Response to a Request for Additional Information Related to the Decommissioning Funding Status Reports for Beaver Valley Power Station, Unit Nos. 1 and 2: Davis-Besse Nuclear Power Station, Unit No. 1: and Perry Nuclear Power Plant, Unit No
L-13-247, Emergency Response Data System (ERDS) Point Library Change14 August 2013Emergency Response Data System (ERDS) Point Library Change
IR 05000440/201300912 August 2013IR 05000440-13-009, 6/10/2013 - 6/28/2013, Perry Nuclear Power Plant; Supplemental Inspection - Inspection Procedure (IP) 95002, One Degraded Cornerstone or Any Three White Inputs in a Strategic Performance AreaHigh Radiation Area
Locked High Radiation Area
Significance Determination Process
Fuel cladding
Substantial potential for an overexposure
Overexposure
ML13225A55712 August 2013Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit
L-13-190, Fourteenth Inservice Inspection Summary Report9 August 2013Fourteenth Inservice Inspection Summary Report
IR 05000440/20130037 August 2013IR 05000440-13-003, 04/01/2013 - 06/30/2013; Perry Nuclear Power Plant. Routine Integrated Inspection ReportHigh Radiation Area
Water Inventory Control
Internal Flooding
Probabilistic Risk Assessment
Temporary Modification
Functionality Assessment
Significance Determination Process
Scram Discharge Volume
Operability Determination
Fire Protection Program
Operability Assessment
Unidentified leakage
IR 05000440/20134056 August 2013IR 05000440-13-405, 06/24/2013 - 06/27/2013, Perry Nuclear Power Plant; Routine Security Baseline Inspection (Cover Letter Only)Significance Determination Process
Affidavit
L-13-254, Online Reference Portal for Review of Mitigation Strategies Submittal in Response to Order EA-12-0495 August 2013Online Reference Portal for Review of Mitigation Strategies Submittal in Response to Order EA-12-049
ML13161A2862 August 2013Acknowledgement Letter for 60 Day Response to Issuance of Seismic Guidance Related to the NTTF Recommendation 2.1, Seismic ReevaluationsProbabilistic Risk Assessment
Earthquake
ML13206A4271 August 2013Online Reference Portal for Nuclear Regulatory Commission Review of Fukushima Near Term Task Force Related Documents
ML13191A25218 July 2013Request for Additional Information Regarding the 2013 Decommissioning Funding Status Report (TAC MF2162, MF2163 & MF2229)