Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML13365A029 | 31 December 2013 | Response to Recommendation 2.3 Flooding Walkdown RAIs (TACs MF0261 & MF0262) | |
TAC:MF0261 | 31 December 2013 | ||
ML14077A090 | 31 December 2013 | BWROG-TP-13-021, Rev. 0, Containment Accident Pressure Committee (344) Task 4 - Operation in Maximum Erosion Rate Zone (Cvic Pump), Attachment 11 | Mission time |
ML13364A283 | 30 December 2013 | Announcement of 2014 Generic Fundamentals Examination Administration Dates-Letter Dated Dec 30, 2013 | Generic Fundamentals Examination |
ML13358A083 | 20 December 2013 | Extended Power Uprate License Amendment Request- Supplement 16 Corrections, Clarifications and Additional Information - Extended Power Uprate | Safe Shutdown Flow Induced Vibration |
ML13351A390 | 19 December 2013 | Summary of Closed Meeting with Exelon Generation Company, LLC, to Discuss Steam Dryer Analysis Related to Proposed Extended Power Uprate for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 | |
ML13351A255 | 17 December 2013 | Letter to P. R. Simpson Peach Bottom Exemption Request (TAC No. L24749) | Exemption Request |
ML13347B326 | 16 December 2013 | M. Pacilio Ltr. Request for Additional for Decommissioning Funding Status Report for Dresden Unit 1 and Peach Bottom Unit 1 | |
RA-13-119, Response to RAI - Proposed Alternative to Utilize Code Case N-786, Alternative Requirements for Sleeve Reinforcement of Class 2 and 3 Moderate-Energy Carbon Steel Piping Section XI, Division 1. | 12 December 2013 | Response to RAI - Proposed Alternative to Utilize Code Case N-786, Alternative Requirements for Sleeve Reinforcement of Class 2 and 3 Moderate-Energy Carbon Steel Piping Section XI, Division 1. | |
ML13309A080 | 11 December 2013 | Memorandum to File: Transcript for 10 CFR 2.206 Petition from Beyond Nuclear (Et Al) Regarding General Electric Mark I and Mark II Boiling-Water Reactors | |
ML13322B230 | 11 December 2013 | Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 | |
TAC:MF1176 | 11 December 2013 | ||
ML13308C441 | 11 December 2013 | Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 | |
ML13345A687 | 6 December 2013 | Supplement 15 Response to Request for Additional Information Extended Power Uprate License Amendment Request | |
ML19064B233 | 6 December 2013 | Data Report or Intake Screen Sampling at Peach Bottom Atomic Power Station in 2013 | |
ML13340A382 | 5 December 2013 | Part 21 Reportable Condition Notification: Failure of Relay Logic Card Modules in 2 Out of 4 Voters | |
ML13339A780 | 4 December 2013 | License Amendment Request to Remove LCO 3.5.1 Note | |
TAC:MF3184 | 4 December 2013 | ||
ML13338A250 | 4 December 2013 | Notice of Forthcoming Closed Meeting with Exelon Generation Company, LLC (Exelon) to Discuss Steam Dryer Analysis Related to Proposed Extended Power Uprate (EPU) for Peach Bottom Atomic Power Station (Pbaps), Units 2 and 3 | |
IR 05000277/2013403 | 2 December 2013 | IR 05000277-13-403, 05000278-13-403; 10/21/2013 to 10/25/2013; Peach Bottom Atomic Power Station, Units 2 and 3; Baseline Security Inspection (Letter Only) | Affidavit |
RA-13-109, Response to Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns | 27 November 2013 | Response to Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns | Fukushima Dai-Ichi Design basis earthquake |
TAC:MF3671 | 22 November 2013 | ||
ML13220A105 | 22 November 2013 | Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 - Mitigation Strategies | Safe Shutdown High winds Reactor Vessel Water Level Ultimate heat sink Tornado Missile Time to boil Safe Shutdown Earthquake Internal Flooding Emergency Lighting FLEX Fukushima Dai-Ichi Frazil ice Earthquake |
ML13339A807 | 22 November 2013 | Comment (1) of Kevin Borton on Behalf of Exelon Generation Co. LLC, on Proposed License Amendment to Increase the Maximum Reactor Power Level | |
ML13338A170 | 22 November 2013 | Assistance in Obtaining Information on Dams | |
TAC:MF0166 | 21 November 2013 | ||
ML13302B895 | 21 November 2013 | Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit No. 3 | |
ML13317A950 | 20 November 2013 | Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Peach Bottom Atomic Power Station, Units 2 and 3, TAC Nos.: MF0845 and MF0846 | Safe Shutdown High winds Reactor Vessel Water Level Ultimate heat sink Time to boil Safe Shutdown Earthquake Internal Flooding Emergency Lighting FLEX Tornado Generated Missile Fukushima Dai-Ichi Frazil ice Earthquake |
Press Release-I-13-039, New NRC Resident Inspector Assigned to Peach Bottom Nuclear Power Plant | 19 November 2013 | Press Release-I-13-039: New NRC Resident Inspector Assigned to Peach Bottom Nuclear Power Plant | New Resident Inspector |
IR 05000277/2013004 | 15 November 2013 | IR 05000277-13-004 & 05000278-13-004; 07/01/2013 - 09/30/2013; Peach Bottom Atomic Power Station (Pbaps), Units 2 and 3; Surveillance Testing and Other Activities | High Radiation Area Non-Destructive Examination Fire Barrier Anticipated operational occurrence Water Inventory Control Nondestructive Examination Functionality Assessment Locked High Radiation Area Significance Determination Process Annual Radiological Environmental Operating Report Operability Determination Dissimilar Metal Weld Substantial potential for overexposure Downpower Coast down Power Uprate Overexposure |
ML13309B072 | 15 November 2013 | Reassignment of U.S. Nuclear Regulatory Commission Branch Chief for Three Mile Island Nuclear Station, Unit 1, Peach Bottom Atomic Power Station, Units 2 and 3, Oyster Creek Nuclear Generating Station, and Limerick Generating Station, Units | |
ML13312A054 | 7 November 2013 | September 4, 2013,NRC Generic Fundamentals Examination Results for Peach Bottom (Cover Ltr) | Generic Fundamentals Examination |
ML13310B685 | 6 November 2013 | NRR E-mail Capture - Preliminary Additional RAI Questions Regarding Use of Code Case N-786 | |
ML13291A122 | 6 November 2013 | Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 | |
ML13311A313 | 6 November 2013 | 2013 Annual Report - Guarantees of Payment of Deferred Premiums | |
ML13304B418 | 1 November 2013 | Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns | |
ML13308A331 | 31 October 2013 | Extended Power Uprate License Amendment Request - Supplement 14, Response to Request for Additional Information | |
ML13295A303 | 30 October 2013 | Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation (TAC Nos. MF0849. | High Radiation Area Spent Fuel Pool Instrumentation Fire Protection Program |
RA-13-077, Company License Amendment Request to Revise the Emergency Plan Requalification Training Frequency for Emergency Response Organization Personnel | 30 October 2013 | Company License Amendment Request to Revise the Emergency Plan Requalification Training Frequency for Emergency Response Organization Personnel | Grace period |
TAC:MF3003 | 30 October 2013 | ||
RS-13-264, Company, Executed Trust Fund Agreement Amendments and Subordinate Trust Agreement | 29 October 2013 | Company, Executed Trust Fund Agreement Amendments and Subordinate Trust Agreement | Incorporated by reference |
ML13297A261 | 17 October 2013 | Email from J. Nguyen to T. Levering Environmental Assessment at Peach Bottom Nuclear Station | Exemption Request |
ML13289A300 | 15 October 2013 | Extended Power Uprate License Amendment Request - Supplement 13 Response to Request for Additional Information | Safe Shutdown Mission time Severe Accident Management Guideline Power Uprate |
ML13289A191 | 11 October 2013 | Extended Power Uprate License Amendment Request - Supplement 12, Response to Request for Additional Information | Code Reconciliation Earthquake Flow Induced Vibration |
ML13290A564 | 9 October 2013 | NRR E-mail Capture - Acceptance Review for Proposed Alternative to Utilize Code Case N-649, Alternative Requirements for IWE-5240 Visual Examination Section XI, Division 1 | |
ML13290A561 | 9 October 2013 | NRR E-mail Capture - Acceptance Review for Request to Use a Provision of a Later Addenda of the ASME Boiler and Pressure Vessel Code, Section XI | |
ML13295A452 | 3 October 2013 | Issuance of the Core Operating Limits Report for Reload 19, Cycle 20, Rev. 7 | |
ML13295A453 | 2 October 2013 | Attachment 3, Core Operating Limits Report for Reload 19, Cycle 20, Revision 7 | |
ML13268A400 | 1 October 2013 | Enclosure 2 - Peach Bottom Atomic Power Station, Units 2 and 3 - Request for Additional Information Regarding License Amendment Request for Extended Power Uprate | |
ML13242A108 | 1 October 2013 | Draft Environmental Assessment and Finding of No Significant Impact Related to the Proposed Extended Power Uprate | Incorporated by reference License Renewal Environmental Justice Power Uprate |