ML13365A02931 December 2013Response to Recommendation 2.3 Flooding Walkdown RAIs (TACs MF0261 & MF0262)
TAC:MF026131 December 2013
ML14077A09031 December 2013BWROG-TP-13-021, Rev. 0, Containment Accident Pressure Committee (344) Task 4 - Operation in Maximum Erosion Rate Zone (Cvic Pump), Attachment 11Mission time
ML13364A28330 December 2013Announcement of 2014 Generic Fundamentals Examination Administration Dates-Letter Dated Dec 30, 2013Generic Fundamentals Examination
ML13358A08320 December 2013Extended Power Uprate License Amendment Request- Supplement 16 Corrections, Clarifications and Additional Information - Extended Power UprateSafe Shutdown
Flow Induced Vibration
ML13351A39019 December 2013Summary of Closed Meeting with Exelon Generation Company, LLC, to Discuss Steam Dryer Analysis Related to Proposed Extended Power Uprate for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3
ML13351A25517 December 2013Letter to P. R. Simpson Peach Bottom Exemption Request (TAC No. L24749)Exemption Request
ML13347B32616 December 2013M. Pacilio Ltr. Request for Additional for Decommissioning Funding Status Report for Dresden Unit 1 and Peach Bottom Unit 1
RA-13-119, Response to RAI - Proposed Alternative to Utilize Code Case N-786, Alternative Requirements for Sleeve Reinforcement of Class 2 and 3 Moderate-Energy Carbon Steel Piping Section XI, Division 1.12 December 2013Response to RAI - Proposed Alternative to Utilize Code Case N-786, Alternative Requirements for Sleeve Reinforcement of Class 2 and 3 Moderate-Energy Carbon Steel Piping Section XI, Division 1.
ML13309A08011 December 2013Memorandum to File: Transcript for 10 CFR 2.206 Petition from Beyond Nuclear (Et Al) Regarding General Electric Mark I and Mark II Boiling-Water Reactors
ML13322B23011 December 2013Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3
TAC:MF117611 December 2013
ML13308C44111 December 2013Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3
ML13345A6876 December 2013Supplement 15 Response to Request for Additional Information Extended Power Uprate License Amendment Request
ML19064B2336 December 2013Data Report or Intake Screen Sampling at Peach Bottom Atomic Power Station in 2013
ML13340A3825 December 2013Part 21 Reportable Condition Notification: Failure of Relay Logic Card Modules in 2 Out of 4 Voters
ML13339A7804 December 2013License Amendment Request to Remove LCO 3.5.1 Note
TAC:MF31844 December 2013
ML13338A2504 December 2013Notice of Forthcoming Closed Meeting with Exelon Generation Company, LLC (Exelon) to Discuss Steam Dryer Analysis Related to Proposed Extended Power Uprate (EPU) for Peach Bottom Atomic Power Station (Pbaps), Units 2 and 3
IR 05000277/20134032 December 2013IR 05000277-13-403, 05000278-13-403; 10/21/2013 to 10/25/2013; Peach Bottom Atomic Power Station, Units 2 and 3; Baseline Security Inspection (Letter Only)Affidavit
RA-13-109, Response to Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns27 November 2013Response to Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic WalkdownsFukushima Dai-Ichi
Design basis earthquake
TAC:MF367122 November 2013
ML13220A10522 November 2013Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 - Mitigation StrategiesSafe Shutdown
High winds
Reactor Vessel Water Level
Ultimate heat sink
Tornado Missile
Time to boil
Safe Shutdown Earthquake
Internal Flooding
Emergency Lighting
FLEX
Fukushima Dai-Ichi
Frazil ice
Earthquake
ML13339A80722 November 2013Comment (1) of Kevin Borton on Behalf of Exelon Generation Co. LLC, on Proposed License Amendment to Increase the Maximum Reactor Power Level
ML13338A17022 November 2013Assistance in Obtaining Information on Dams
TAC:MF016621 November 2013
ML13302B89521 November 2013Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit No. 3
ML13317A95020 November 2013Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Peach Bottom Atomic Power Station, Units 2 and 3, TAC Nos.: MF0845 and MF0846Safe Shutdown
High winds
Reactor Vessel Water Level
Ultimate heat sink
Time to boil
Safe Shutdown Earthquake
Internal Flooding
Emergency Lighting
FLEX
Tornado Generated Missile
Fukushima Dai-Ichi
Frazil ice
Earthquake
Press Release-I-13-039, New NRC Resident Inspector Assigned to Peach Bottom Nuclear Power Plant19 November 2013Press Release-I-13-039: New NRC Resident Inspector Assigned to Peach Bottom Nuclear Power PlantNew Resident Inspector
IR 05000277/201300415 November 2013IR 05000277-13-004 & 05000278-13-004; 07/01/2013 - 09/30/2013; Peach Bottom Atomic Power Station (Pbaps), Units 2 and 3; Surveillance Testing and Other ActivitiesHigh Radiation Area
Non-Destructive Examination
Fire Barrier
Anticipated operational occurrence
Water Inventory Control
Nondestructive Examination
Functionality Assessment
Locked High Radiation Area
Significance Determination Process
Annual Radiological Environmental Operating Report
Operability Determination
Dissimilar Metal Weld
Substantial potential for overexposure
Downpower
Coast down
Power Uprate
Overexposure
ML13309B07215 November 2013Reassignment of U.S. Nuclear Regulatory Commission Branch Chief for Three Mile Island Nuclear Station, Unit 1, Peach Bottom Atomic Power Station, Units 2 and 3, Oyster Creek Nuclear Generating Station, and Limerick Generating Station, Units
ML13312A0547 November 2013September 4, 2013,NRC Generic Fundamentals Examination Results for Peach Bottom (Cover Ltr)Generic Fundamentals Examination
ML13310B6856 November 2013NRR E-mail Capture - Preliminary Additional RAI Questions Regarding Use of Code Case N-786
ML13291A1226 November 2013Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3
ML13311A3136 November 20132013 Annual Report - Guarantees of Payment of Deferred Premiums
ML13304B4181 November 2013Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns
ML13308A33131 October 2013Extended Power Uprate License Amendment Request - Supplement 14, Response to Request for Additional Information
ML13295A30330 October 2013Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation (TAC Nos. MF0849.High Radiation Area
Spent Fuel Pool Instrumentation
Fire Protection Program
RA-13-077, Company License Amendment Request to Revise the Emergency Plan Requalification Training Frequency for Emergency Response Organization Personnel30 October 2013Company License Amendment Request to Revise the Emergency Plan Requalification Training Frequency for Emergency Response Organization PersonnelGrace period
TAC:MF300330 October 2013
RS-13-264, Company, Executed Trust Fund Agreement Amendments and Subordinate Trust Agreement29 October 2013Company, Executed Trust Fund Agreement Amendments and Subordinate Trust AgreementIncorporated by reference
ML13297A26117 October 2013Email from J. Nguyen to T. Levering Environmental Assessment at Peach Bottom Nuclear StationExemption Request
ML13289A30015 October 2013Extended Power Uprate License Amendment Request - Supplement 13 Response to Request for Additional InformationSafe Shutdown
Mission time
Severe Accident Management Guideline
Power Uprate
ML13289A19111 October 2013Extended Power Uprate License Amendment Request - Supplement 12, Response to Request for Additional InformationCode Reconciliation
Earthquake
Flow Induced Vibration
ML13290A5649 October 2013NRR E-mail Capture - Acceptance Review for Proposed Alternative to Utilize Code Case N-649, Alternative Requirements for IWE-5240 Visual Examination Section XI, Division 1
ML13290A5619 October 2013NRR E-mail Capture - Acceptance Review for Request to Use a Provision of a Later Addenda of the ASME Boiler and Pressure Vessel Code, Section XI
ML13295A4523 October 2013Issuance of the Core Operating Limits Report for Reload 19, Cycle 20, Rev. 7
ML13295A4532 October 2013Attachment 3, Core Operating Limits Report for Reload 19, Cycle 20, Revision 7
ML13268A4001 October 2013Enclosure 2 - Peach Bottom Atomic Power Station, Units 2 and 3 - Request for Additional Information Regarding License Amendment Request for Extended Power Uprate
ML13242A1081 October 2013Draft Environmental Assessment and Finding of No Significant Impact Related to the Proposed Extended Power UprateIncorporated by reference
License Renewal
Environmental Justice
Power Uprate