 Issue dateTitleTopic
TAC:MF330330 December 2013
PNP 2013-086, License Amendment Request - Cyber Security Plan Implementation Schedule30 December 2013License Amendment Request - Cyber Security Plan Implementation ScheduleSafe Shutdown
Cyber Security
Fire Protection Program
ML13357A77123 December 2013NRR E-mail Capture - LIC-109 Acceptance Review - Palisades - RR 4-17, Proposed Alternative, Request for Relief from Immediate ASME Code Flaw Repair of Service Water System Manual Valve MV-SW135 - MF3192
ML14022A28221 December 2013Comment (00930) of Michael Keegan on PR-51, Waste Confidence - Continued Storage of Spent Nuclear FuelTime to boil
Operating Basis Earthquake
License Renewal
Earthquake
Chernobyl
Fuel cladding
Affidavit
ML14014A11019 December 2013Comment (00915) of Corinne Carey on PR-51, Waste Confidence - Continued Storage of Spent Nuclear Fuel
PNP 2013-092, Schedule for Generic Safety Issue - 191 Resolution18 December 2013Schedule for Generic Safety Issue - 191 Resolution
ML13353A04216 December 2013NRR E-mail Capture - Request for Additional Information - Palisades - Proposed Revision to Palisades Site Emergency Plan (SEP) Emergency Response Organization (ERO) MF2321
ML13347B28613 December 2013Summary of Public Meeting Webinar Regarding Independent Spent Fuel Storage Installation (ISFSI) BasicsHigh winds
Safe Shutdown Earthquake
Tornado Generated Missile
Earthquake
ML13346A64412 December 2013NRR E-mail Capture - Palisades - Request for Additional Information - Reactor Vessel Internals - ME9569 - Email ResendAging Management
Power change
PNP 2013-076, License Amendment Request - Application for Technical Specification Change (TSTF-427) to Add LCO 3.0.9 Regarding the Unavailability of Barriers Using the Consolidated Line Item Improvement Process11 December 2013License Amendment Request - Application for Technical Specification Change (TSTF-427) to Add LCO 3.0.9 Regarding the Unavailability of Barriers Using the Consolidated Line Item Improvement ProcessTime of Discovery
Fire Barrier
Incorporated by reference
ML13343A1856 December 2013NRR E-mail Capture - Conference Call with Palisades Regarding SG Tube Inspections During 1R23 Refueling Outage - M3196
IR 05000255/20134063 December 2013IR 05000255-13-406; on 10/21/2013 - 10/24/2013; Palisades Nuclear Plant; Routine Security Baseline Inspection. (Cover Letter Only)Affidavit
ML13337A6553 December 2013Ltr 12/3/13 Palisades Fire Protection Request for InformationBoric Acid
Nondestructive Examination
Dissimilar Metal Weld
Scaffolding
PNP 2013-082, Relief Request Number 4-17, Proposed Alternative, Request for Relief from Immediate ASME Code Flaw Repair of Service Water System Manual Valve MV-SW1353 December 2013Relief Request Number 4-17, Proposed Alternative, Request for Relief from Immediate ASME Code Flaw Repair of Service Water System Manual Valve MV-SW135Safe Shutdown
Ultimate heat sink
Offsite Dose Calculation Manual
Internal Flooding
Anchor Darling
Cyber Security
Functionality Assessment
Pressure and Temperature Limits Report
Process Control Program
Maintenance Rule Program
Through Wall Leak
Fire Protection Program
PNP 2013-083, Response to Request for Additional Information - License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors2 December 2013Response to Request for Additional Information - License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water ReactorsHot Short
Safe Shutdown
Mission time
Fire Barrier
Internal Flooding
Probabilistic Risk Assessment
Fire impairment
Multiple Spurious Operation
Emergency Lighting
Significance Determination Process
Thermoset
Large early release frequency
Cable Tray Ignition
Earthquake
Fire Protection Program
Fire Watch
Scaffolding
Weak link
ML13312A42326 November 2013Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool InstrumentationHigh Radiation Area
Safe Shutdown Earthquake
Finite Element Analysis
FLEX
Spent Fuel Pool Instrumentation
Fire Protection Program
PNP 2013-084, Response to Request for Additional Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Hazard Walkdowns Conducted to Verify Current Plant Compliance with the Current Licensing Basis for Seismic Requirements22 November 2013Response to Request for Additional Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Hazard Walkdowns Conducted to Verify Current Plant Compliance with the Current Licensing Basis for Seismic RequirementsFukushima Dai-Ichi
ML13329A50220 November 2013LIC-109 Acceptance of Palisades Nuclear Plant'S 10 CFR 50 Appendix G Equivalent Margins Analysis - MF2962
ENOC-13-00028, Vermont, Notice of Change in Corporate Form of Energy Nuclear Holding Company19 November 2013Vermont, Notice of Change in Corporate Form of Energy Nuclear Holding Company
ML13295A65914 November 2013Target Set Inspection - Cover Letter
ML13316C47214 November 2013Palisades Independent Spent Fuel Storage Installation (ISFSI) at Nuclear Power PlantsEarthquake
ML13318A86914 November 2013LTR-13-0884 Sen Edward Markey and Sen Bernard Sanders Letter Sufficient Funds to Operate Entergy'S Plants After Entergy Officials Contacted Senior NRC Officials to Complain About Pending NRC Oversight
IR 05000255/201300413 November 2013IR 05000255-13-004, on 07/01/2013 - 09/30/2013; Palisades Nuclear Plant; Radiological Hazard Assessment and Exposure ControlsBoric Acid
High Radiation Area
Hydrostatic
Probabilistic Risk Assessment
Temporary Modification
Condition Adverse to Quality
B.5.b
Significance Determination Process
Operability Determination
Fire Protection Program
Substantial potential for an overexposure
Operability Assessment
Siren
Overexposure
ML13311B3817 November 2013Planned Modification of the Entergy Quality Assurance Program Manual (QAPM)
ENOC-13-00029, Planned Modification of the Entergy Quality Assurance Program Manual (EA-11-096)4 November 2013Planned Modification of the Entergy Quality Assurance Program Manual (EA-11-096)
CAC:MF62484 November 2013
ML13302C11729 October 2013Notice of Public Webinar Meeting - Palisades Nuclear Plant Independent Spent Fuel Storage Installation (ISFSI) Basics Webinar
ML13296A54028 October 2013Summary of Pre-Application Teleconference Meeting with Entergy Nuclear Operations, Inc., to Discuss a Forthcoming Palisades Equivalent Margin Analysis Submittal
PNP 2013-079, Response to Request for Additional Information License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors24 October 2013Response to Request for Additional Information License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water ReactorsHot Short
Safe Shutdown
Boric Acid
Probabilistic Risk Assessment
Large early release frequency
Fire Protection Program
TAC:MF296221 October 2013
PNP 2013-028, 10 CFR 50 Appendix G Equivalent Margins Analysis21 October 201310 CFR 50 Appendix G Equivalent Margins Analysis
ML13270A48017 October 2013Withholding of Relief Request Number RR-4-16, Proposed Alternative Leak Repair Addition of Safety Injection and Refueling Water Tank Bottom Liner, Fourth 10-Year Inservice Inspection Interval for Palisades Nuclear Plant
PNP 2013-072, Report of Changes, Tests and Experiments and Summary of Commitment Changes14 October 2013Report of Changes, Tests and Experiments and Summary of Commitment ChangesBoric Acid
Offsite Dose Calculation Manual
FLEX
Dissimilar Metal Weld
Seismic Walkdown Report
PNP 2013-077, 10 CFR 71.95 Report - 8-120B Cask Certificate of Compliance Noncompliance Due to an Inadequate Vendor Leak Test Procedure10 October 201310 CFR 71.95 Report - 8-120B Cask Certificate of Compliance Noncompliance Due to an Inadequate Vendor Leak Test Procedure
ML13276A2711 October 2013FEMA, Final Report for the July 10, 2013, Radiological Emergency Preparedness (REP) Full Participation Plume Exposure Pathway Exercise for the Palisades Nuclear Power Plant, Letter
PNP 2013-075, Response to Request for Additional Information - License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors30 September 2013Response to Request for Additional Information - License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water ReactorsHot Short
Safe Shutdown
Boric Acid
Fire Barrier
Internal Flooding
Probabilistic Risk Assessment
Coatings
Multiple Spurious Operation
Large early release frequency
Power Operated Valves
Fire Protection Program
Fire Watch
TAC:MF015325 September 2013
PNP 2013-074, Notification of Commitment Changes25 September 2013Notification of Commitment ChangesFLEX
Dissimilar Metal Weld
ML13262A44923 September 2013October 9, 2013, EMA Presentation Slides for Conference Call with Entergy Nuclear Operations
ML13261A22823 September 2013Notice of Forthcoming Conference Call with Entergy Nuclear Operations, Inc., on Palisades Equivalent Margins Analysis
TAC:MF274423 September 2013
ML13196A51119 September 2013G20130397/LTR-13-0440 - Letter to David Lochbaum, Union of Concerned Scientists from Chairman Macfarlane Responds to His Letter Regarding the Nuclear Regulatory Commission'S Enabling Unsafe and Illegal Operations - PalisadesEnforcement Discretion
Significance Determination Process
Pressure Boundary Leakage
TAC:MF186519 September 2013
PNP 2013-063, Unsatisfactory Laboratory Testing Report18 September 2013Unsatisfactory Laboratory Testing ReportFitness for Duty
TAC:MF008913 September 2013
ML13232A27013 September 2013Closure of Confirmatory Action Letter NRR-07-023Dissimilar Metal Weld
ML13260A13013 September 2013Letter, 9/13/2013, Palisades Re NRC Office of Investigations Report 3-2013-004
PNP 2013-053, Retraction of Relief Request Number RR 4-16, Proposed Alternative, Alternate Leak Repair Addition of Safety Injection and Refueling Water Tank Bottom Liner, Fourth 10-Year Inservice Inspection Interval12 September 2013Retraction of Relief Request Number RR 4-16, Proposed Alternative, Alternate Leak Repair Addition of Safety Injection and Refueling Water Tank Bottom Liner, Fourth 10-Year Inservice Inspection Interval
PNP 2013-069, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident - 1.5 Year Response for CEUS Sit11 September 2013Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident - 1.5 Year Response for CEUS SitesSafe Shutdown Earthquake
Fukushima Dai-Ichi
Earthquake
TAC:MF186110 September 2013